11910 Green Acres Lane Media Production Studio

Variance of use VA263 No longer in review

Variance of Use for Office / Media Production Studio in RR-5

Location
11910 GREEN ACRES LN, 80908
Jurisdiction
El Paso County
Applicant
Sterling Providence LLC Holly Eide
Land owner (assessor)
STERLING PROVIDENCE LLC (state record)
County project manager
Miranda Benson
Filed
Feb 13, 2026
Parcel
5215001032
Map
Parcel boundaries: Colorado public parcel data · Basemap © OpenStreetMap contributors
Area map
See all Tri-Lakes projects on the map
Source record
El Paso County EDARP file

Documents (17)

Application/Petition FormreviewMar 25, 2026
Traffic MemoreviewMar 24, 2026
Site Plan DrawingreviewMar 24, 2026
Letter of IntentreviewMar 24, 2026
Landscape Plan drawingsreviewMar 24, 2026
Lighting PlanreviewMar 23, 2026
Opposition - Jason RobertsadditionalApr 14, 2026
returned noticeadditionalApr 14, 2026
04/14/26
Selected RangeadditionalApr 2, 2026
Selected Range was 500 feet. JM
Mailing LabelsadditionalApr 2, 2026
Mailing Labels for the 11 surrounding property owners that received notices. Cost = $8.14. JM
Neighbor Notice & Vicinity MapadditionalApr 2, 2026
Notice of Application letters were mailed to surrounding property owners on 04/02/2026. JM

Agency review comments (19)

Comments returned by referral agencies during review, from the county's public EDARP file. Some agencies attach a letter instead of (or alongside) written comments.

PCD Project Managerreview 1Apr 16, 2026
V1_Site Plan Drawing
View attached comment letter
PCD Project Managerreview 1Apr 16, 2026
V1_Road Impact Fee Acknowledgement
View attached comment letter
PCD Project Managerreview 1Apr 16, 2026
V1_Preliminary Concept Landscape Buffer Plan
View attached comment letter
PCD Project Managerreview 1Apr 16, 2026
V1_Letter of Intent
View attached comment letter
PCD Project Managerreview 1Apr 16, 2026
V1_Landscape Plan drawings
View attached comment letter
PCD Project Managerreview 1Apr 16, 2026
EPC Planning Review 1 Comments. Comments were made on the following documents: - V1_Landscape Plan drawings - V1_Letter of Intent - V1_Preliminary Concept Landscape Buffer Plan - V1_Road Impact Fee Acknowledgement - V1_Site Plan Drawing In addition to these items, please also upload the well permit (I did receive your email, but this will be the opportunity to add it to the EDARP submittal) as well as a floor plan. The floor plan will help us to determine the appropriate Road Impact Fee as well as document the transition from residential to office use. Please reach out with any questions. Reviewed by: Maria Lancto, AICP, Senior Planner marialancto@elpasoco.com 719-520-6447
EPC DPW Development Services - Engineeringreview 1Apr 16, 2026
Engineering Review Ver.1 Please see engineering review comments on the following documents LOI_V1 Site Dev Plan Drawing_V1 Road Impact Fee ACKN Form_V1 Thank you Edward Schoenheit, Engineer E.P.C. Dept. of Public Works 2880 International Circle Colorado Springs, CO. 80910 Office: 719.520.6813 Cell: 719.502.9659 edwardschoenheit@elpasoco.com https://publicworks.elpasoco.com/department-public-works/county-engineer/ Exciting News: El Paso County is combining the Engineering Criteria Manual and Drainage Criteria Manual into one streamlined document. We’d love your input—please complete the kickoff survey at http://www.elpasocountyecm.com by selecting the Participate tab.
Black Hills Energy-Aquilareview 1Apr 16, 2026
No comment.
EPC DPW Stormwaterreview 1Apr 16, 2026
EPC DPW Stormwater has no comments at this time, but will review the V2 documents after comments from other review agencies have been addressed. Reviewed by: Zachary Jannusch Associate Engineer - Stormwater 719.500.3170 ZacharyJannusch@elpasoco.com
Mountain View Electric Association, Inc.review 1Apr 15, 2026
Mountain View Electric Association does not object to this variance of use.
Pikes Peak Regional Building Departmentreview 1Apr 13, 2026
Enumerations has no comment. Becky Allen PPRBD - Enumerations beckya@pprbd.org
Black Forest Fire Protection Districtreview 1Apr 10, 2026
The access road from the main roadway into the development is too narrow and over grown with large pine trees along the sides of the roadway. The driveway entrance needs to comply with IFC 2018 for proper width and compaction. The building shall comply with IFC 2018 and will be managed through an existing MOU with the City of Colorado Springs Fire Department DFM.
Upper Black Squirrel Creek GWMDreview 1Apr 8, 2026
The Upper Black Squirrel Creek GWMD does not have any comments at this time but respectfully reserves the right to comment on future submittals.
PCD Administrative Noticereview 1Apr 2, 2026
On 04/02/2026, PCD mailed "Notice of Application" letters to surrounding property owners within a 500-foot range (11 addresses). Copies of the notice, mailing labels, and selected range have been uploaded to the EDARP file. Cost of postage to be billed to the applicant = $8.14. JM
Academy SD 20 Building Fundreview 1Mar 31, 2026
Academy District 20 is in receipt of File #VA263 for approval of the 11910 Green Acres Lane Variance Use. The District has no comment regarding the current request. If any additional residential units are added to the property in the future, the District is requesting fees per the existing El Paso County Code. If you need additional information, please contact me. Don Smith Planning Consultant
El Paso County Conservation Distreview 1Mar 29, 2026
The El Paso County Conservation District has reviewed this project and we would like to make the following recommendations: 1) Erosion Control We appreciate the detail that was put into their plans about the size of area and plans to use native seed when they go to revegetate the shown areas. EPCCD would like to make some additional suggestions that will help with preventing erosion and improve revegetation success. A) Disturbed areas be mulched and revegetated within 45 days of disturbance using the plant/grass species native and/or naturalized to El Paso County as they mentioned. B) Disturbed areas should be either: mulched after seeding with weed-free hay or straw mulch at approximately 5,000 lbs per acre due to the exposed site and its proneness to wind erosion; Or if applicable, can be mulched with woodchips from onsite tree removal and forest mitigation to a depth of 1-2" deep. C) If the applicant needs a good source of grass seed, we invite them to consider using of the El Paso County Conservation District’s Native Shotgun Mix (available at EPCCD.org) for reseeding, which is well suited to soils present on this site and is comprised of 100% native and naturalized grass species. If these measures are added to the project's plan, then the El Paso County Conservation District will be content with the applicant's added commitment to soil conservation and erosion prevention. For any questions, please feel free to contact the EPCCD at 719-600-4706 or districtmanager@epccd.org
EPC Environmental Servicesreview 1Mar 27, 2026
View attached comment letter
EPC Parks Departmentreview 1Mar 27, 2026
Thank you for the opportunity to review the Special Use for an Variance of Use! Upon reviewing the project and site location, El Paso County Parks staff has found that there are no immediate impacts to El Paso County parks, trails, open space, or other El Paso County Parks related items. El Paso County Parks staff will not have comments regarding this project. Thank you! Ashlyn Mathy Parks Planner Park Planning Division El Paso County Parks Department ashlynmathy@elpasoco.com
EPC Code Enforcementreview 1Mar 26, 2026
The variance would correct the Code Enforcement violation.

Land ownership timeline

The documented chain of ownership per parcel, from El Paso County Assessor records and TriLakes Growth's monthly re-checks. Where the record hasn't been collected yet, the gap is shown rather than papered over.

Timeline