16990 Cherry Crossing Dr - Side setback relief

Board of adjustment BOA265 No longer in review

Asking for 10 foot setback where 35 is required in the PUD

Location
16990 CHERRY CROSSING DR, 80921
Jurisdiction
El Paso County
Applicant
James Lucas James Lucas
Land owner (assessor)
LUCAS JAMES B & LUCAS JENNIFER A
County project manager
Lacey Dean
Filed
May 5, 2026
Parcel
6122008022
Map
Parcel boundaries: Colorado public parcel data · Basemap © OpenStreetMap contributors
Area map
See all Tri-Lakes projects on the map
Source record
El Paso County EDARP file

Documents (23)

Site Plan DrawingreviewAug 12, 2026
Additional ExhibitsreviewAug 12, 2026
Site Plan DrawingreviewJul 29, 2026
Letter of IntentreviewJul 29, 2026
Additional ExhibitsreviewJul 29, 2026
Detached Garage -4 sidereviewJun 18, 2026
Overhead View BasicreviewJun 18, 2026
Application/Petition FormreviewJun 18, 2026
BOA Hearing AgendaadditionalSep 9, 2026
Hearing Agenda for the Board of Adjustment hearing on 09/10/2026. JM
returned documentadditionalSep 9, 2026
9/9/2026
Posters on PropertyadditionalAug 27, 2026
Selected Range - Hearing NoticeadditionalAug 25, 2026
Selected Range was 500 feet. JM
BOA PosteradditionalAug 25, 2026
Poster for the Board of Adjustment hearing on 09/10/2026. JM
Mailing Labels - Hearing NoticeadditionalAug 25, 2026
Mailing Labels for the 21 surrounding property owners that received notices. PCD mailed the letters on 08/25/2026. Cost = $16.38. JM
Hearing Notice & Vicinity MapadditionalAug 25, 2026
Hearing Notice for the Board of Adjustment hearing on 09/10/2026. JM
Selected RangeadditionalJul 13, 2026
Selected Range was 500 feet. JM
Neighbor Notice & Vicinity MapadditionalJul 13, 2026
Notice of Application letters were mailed to surrounding property owners on 07/13/2026. JM
Mailing LabelsadditionalJul 13, 2026
Mailing Labels for the 21 surrounding property owners that received notices. Cost = $15.54. JM

Agency review comments (19)

Comments returned by referral agencies during review, from the county's public EDARP file. Some agencies attach a letter instead of (or alongside) written comments.

PCD Project Managerreview 3Aug 17, 2026
Review 3: EPC Planning Division has no further comments. Reviewed by: Lacey Dean, Associate Planner laceydean2@elpasoco.com
EPC DPW Development Services - Engineeringreview 3Aug 17, 2026
Review 3. Engineering comments are resolved. Reviewed by: Joe Sandstrom, EIT, CFM Associate Engineer Department of Public Works O: 719-520-6314 M: 719-505-0516 josephsandstrom@elpasoco.com
PCD Project Managerreview 2Aug 10, 2026
V2_Site Plan Drawing_comments
View attached comment letter
PCD Project Managerreview 2Aug 10, 2026
V2_Additional Exhibits_comments
View attached comment letter
PCD Project Managerreview 2Aug 10, 2026
Review 2: EPC Planning Division has minor comments on the following documents in preparation for hearing. - Additional Exhibits Reviewed by: Lacey Dean, Associate Planner laceydean2@elpasoco.com
EPC DPW Development Services - Engineeringreview 2Aug 10, 2026
Review 2. Engineering comments on the following documents (to be uploaded by the project manager): - Site Plan Feel free to contact me if you have any questions about engineering comments (in blue) prior to resubmission. Project manager note: Engineering can accommodate a 2-day review period once the documents are resubmitted if other agency comments have been resolved. Reviewed by: Joe Sandstrom, EIT, CFM Associate Engineer Department of Public Works O: 719-520-6314 M: 719-505-0516 josephsandstrom@elpasoco.com
PCD Project Managerreview 1Jul 23, 2026
V1_Site Plan Drawing_comments
View attached comment letter
PCD Project Managerreview 1Jul 23, 2026
V1_Letter of Intent_comments
View attached comment letter
PCD Project Managerreview 1Jul 23, 2026
V1_Additional Exhibits_comments
View attached comment letter
PCD Project Managerreview 1Jul 23, 2026
Review 1: EPC Planning Division has comments in green text boxes on the following documents: - Site Plan Drawing - Additional Exhibits Reviewed by: Lacey Dean, Associate Planner laceydean2@elpasoco.com
Tri-Lakes-Monument Fire Protection Districtreview 1Jul 22, 2026
Monument fire comments- we have no comments on this proposal.
EPC DPW Development Services - Engineeringreview 1Jul 21, 2026
Review 1. Engineering comments in blue on the following documents (to be uploaded by the project manager at a later date): - Letter of Intent - Site Plan Drawing Reviewed by: Joe Sandstrom, EIT, CFM Associate Engineer Department of Public Works O: 719-520-6314 M: 719-505-0516
EPC DPW Stormwaterreview 1Jul 15, 2026
EPC DPW Stormwater has no comments. Reviewed by: Zachary Jannusch Associate Engineer - Stormwater 719.500.3170 ZacharyJannusch@elpasoco.com
PCD Administrative Noticereview 1Jul 13, 2026
On 07/13/2026, PCD mailed "Notice of Application" letters to surrounding property owners within a 500-foot range (21 addresses). Copies of the notice, mailing labels, and selected range have been uploaded to the EDARP file. Cost of postage to be billed to the applicant = $15.54. JM
El Paso County Conservation Distreview 1Jul 12, 2026
The El Paso County Conservation District has reviewed this and we have the following comments: 1) Setback Variance EPCCD has no concerns with the setback variance request as this kind of request does not directly create any obvious conservation concerns. 2) Erosion controls/Revegetation plans We did not see any documents that went over an erosion control or revegetation/landscape plan during and post construction of the proposed building. Due to this building being closer than typical to the property line with their neighbor, we feel it's important to have a plan in place to address these issues. Additionally, this neighborhood also hosts one of the counties floor mitigation dams (West Cherry Creek Dam #6), which is immediately downstream of this property and the EPCCD has an easement on. Having an erosion and revegetation plan will also help protect this site from any unnecessary sediment infilling from water erosion. As such, EPCCD would like to see the following recommendations followed during and after construction. These could be added to the letter of intent, construction plans, or as a separate "Erosion control/Revegetation Plan" document: A) Disturbed areas not being built on should be mulched and revegetated within 45 days (or asap after if weather doesn't allow) of disturbance using plant/grass species native and/or naturalized to El Paso County. B) Disturbed areas be either: mulched after seeding with weed-free hay or straw mulch at approximately 5,000 lbs per acre; Or areas that are not suitable for revegetation such as driveway/parking areas (if not going to be paved), or safety areas around buildings should have a 1-2" thick layer of crushed rock, road base, gravel, or other ornamental rock based material to assist in preventing having exposed soil that would cause erosion issues for adjacent neighbors or the immediate watershed. C) Prior to and during construction, silt fencing needs to be in place around the downhill sides of the construction in order to prevent water erosion issues beyond the immediate construction site in the event of heavy precipitation events. D) For areas being replanted with natural grass, consider using the El Paso County Conservation District’s Native Shotgun Mix (available at EPCCD.org) for reseeding, which is well suited to soils present on this site and is comprised of 100% native and naturalized grass species. If these measures are added to the project's plan, then the El Paso County Conservation District will be content with the applicant's commitment to soil conservation, watershed protection, and protection of the surrounding community. For any questions, please feel free to contact the EPCCD at 719-600-4706 or Will Vogl - Board VP at Will@EPCCD.org
Mountain View Electric Association, Inc.review 1Jul 9, 2026
MVEA has no objection to the setback relief as proposed. Please note side easement (10' platted utility and drainage easement).
EPC Environmental Servicesreview 1Jul 1, 2026
View attached comment letter
EPC Environmental Servicesreview 1Jul 1, 2026
View attached comment letter
Tri-Lakes-Monument Fire Protection Districtreview 1Jul 1, 2026
Monument Fire has no comment on the lot line adjustment into the easement

Land ownership timeline

The documented chain of ownership per parcel, from El Paso County Assessor records and TriLakes Growth's monthly re-checks. Where the record hasn't been collected yet, the gap is shown rather than papered over.

Timeline