847 Struthers Ranch Road Minor Amendment

Site development plan PPR263 No longer in review

Minor Site Development Plan Amendment to add a 2,560 sq ft addition to an existing building. Previous approval is found under EDARP file number PPR2248.

Location
14650 DECORATORS VW, 80921
Jurisdiction
El Paso County
Applicant
Hammers Construction Lisa Peterson
Land owner (assessor)
MARSHALLS FAMILY PROPERTY LLC (state record)
County project manager
Miranda Benson
Filed
Dec 2, 2025
Parcel
7136303014
Map
Parcel boundaries: Colorado public parcel data · Basemap © OpenStreetMap contributors
Area map
See all Tri-Lakes projects on the map
Source record
El Paso County EDARP file

Documents (30)

Lighting PlanapprovedSep 2, 2026
Letter of IntentapprovedSep 2, 2026
Landscape Plan drawingsapprovedSep 2, 2026
Site Development PlanreviewAug 17, 2026
PCM Applicability FormreviewAug 17, 2026
Lighting PlanreviewAug 17, 2026
Letter of IntentreviewAug 17, 2026
Landscape Plan drawingsreviewAug 17, 2026
Application/Petition FormreviewMay 13, 2026
Donala comment responsesreviewApr 28, 2026
PCM Applicability FormreviewApr 28, 2026
Site Development PlanreviewApr 28, 2026
Letter of IntentreviewApr 28, 2026
Lighting PlanreviewApr 28, 2026
Landscape Plan drawingsreviewApr 28, 2026
Elevation PlansreviewApr 28, 2026
Geotechnical ReportreviewJan 24, 2026
Floor Plans (24" x 36")reviewJan 24, 2026
Email CommunicationadditionalMay 15, 2026
Request for FPD turning radius detail on next submission.
Email CommunicationadditionalMay 15, 2026
Assessor's Office correction to website depiction of lot lines.
Land Development CodeadditionalMay 12, 2026
5.2.50 Shipping Containers
Application PacketadditionalMay 12, 2026
Blank Application and Review Checklists
Land Development CodeadditionalMay 12, 2026
5.2.40 Outside Storage
Past RecordadditionalMay 12, 2026
V227 Recorded Plat No. 15139, Lot 1A
Past RecordadditionalMay 12, 2026
VR05015 Recorded Plat No. 12492, Lots 3 and 4
Past RecordadditionalMay 12, 2026
PUD0616 Development Guidelines
Past RecordadditionalMay 12, 2026
PPR2248 Site Development Plan Approval Packet from 2023

Agency review comments (27)

Comments returned by referral agencies during review, from the county's public EDARP file. Some agencies attach a letter instead of (or alongside) written comments.

PCD Project Managerreview 3Aug 28, 2026
V3_Planning comments. Comments were resolved on the following: - Letter of Intent - Lighting Plan - Site Development Plan No additional comments from Planning. Site Development Plan documents will be forwarded to the Planning Manager for signatures and stamps of approval. Thank you, Miranda Benson, 719-520-7940 MirandaBenson2@elpasoco.com
EPC DPW Stormwaterreview 4Aug 27, 2026
Review 3: EPC DPW Stormwater comments have been resolved on the following document(s): - PCM Applicability Form EPC DPW Stormwater has no further comments. EPC Project Manager: no re-review necessary. Reviewed by: Zachary Jannusch Associate Engineer - Stormwater 719.500.3170 ZacharyJannusch@elpasoco.com
EPC DPW Development Services - Engineeringreview 3Aug 26, 2026
Review 3. Engineering comments are resolved. No additional review needed. Applicant Note: A drainage letter may still be required with the forthcoming application for the development on Lots 3 and 4. Reviewed by: Joe Sandstrom, EIT, CFM Associate Engineer Department of Public Works O: 719-520-6314 M: 719-505-0516 https://publicworks.elpasoco.com
EPC DPW Stormwaterreview 3Jul 7, 2026
Review 2 *Revised*: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document(s): - PCM Applicability Form A drainage letter is no longer being requested for this project. Reviewed by: Zachary Jannusch Associate Engineer - Stormwater 719.500.3170 ZacharyJannusch@elpasoco.com
PCD Project Managerreview 2May 13, 2026
V2 - Site Development Plan_COMMENTS
View attached comment letter
PCD Project Managerreview 2May 13, 2026
V2 - Lighting Plan_COMMENTS
View attached comment letter
PCD Project Managerreview 2May 13, 2026
V2 - Letter of Intent_COMMENTS
View attached comment letter
PCD Project Managerreview 2May 13, 2026
V2_Planning review is complete. Comments were resolved on the following docs: - Elevation Plan - Landscaping Plan (no landscaping is being removed, 4 shrubs are being added) Additional comments have been made to the following docs: - Letter of Intent - Lighting Plan - Site Dev Plan Please note that addressing comments on LOI and SDP may result in required changes to the Landscaping Plan. For this reason, I am including this document in the V3_ request. Thank you, Miranda Benson, 719-520-7940 MirandaBenson2@elpasoco.com
EPC DPW Development Services - Engineeringreview 2May 13, 2026
Review 2. Development Services Engineering requires a drainage letter to be submitted with the next review for the increase in flows generated by the increased impervious on the adjacent parcels. No additional comments for this review. Additional comments may be generated on new information/documents submitted for the next review. Reviewed by: Joe Sandstrom, EIT, CFM Associate Engineer Department of Public Works O: 719-520-6314 M: 719-505-0516 https://publicworks.elpasoco.com
EPC DPW Stormwaterreview 2May 13, 2026
Review 2: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document(s): - Letter of Intent - PCM Applicability Form - Site Development Plan Since the asphalt millings were placed on all three lots, all three lots are under the same ownership, and the asphalt millings are an extension of the current use on the northern parcel, the unapproved disturbance will be addressed with this site development plan. Please provide the following document(s) upon resubmittal (the planner will need to send an upload request): - Drainage Letter The drainage letter is being requested to discuss drainage impacts and for the existing stormwater pond to be analyzed under the proposed conditions. Reviewed by: Zachary Jannusch Associate Engineer - Stormwater 719.500.3170 ZacharyJannusch@elpasoco.com
EPC DPW Stormwaterreview 2May 13, 2026
PCM Applicability Form comments
View attached comment letter
Black Hills Energy-Aquilareview 1Feb 26, 2026
BHE will serve please call in locates. If Building is adding more BTU's please contact BHE for meter sizing
USAFA Base Plannerreview 1Feb 23, 2026
Thank you for sending the United States Air Force Academy (USAFA) the project review request for the “847 Struthers Ranch Road – Rocky Mountain Cycle Plaza Amendment” (File #: PPR263). Due to the property’s proximity to the installation boundary, USAFA requests that the county considers asking the applicant to include a noise notice on the development plan and to file an avigation easement with the El Paso County Clerk and Recorder’s Office. Instructions for both the noise notice and the avigation easement are attached to this comment. Once these items are completed, please provide the updated development plan and the recorded avigation easement to Community Planner Sabrina Untal at sabrina.untal.ctr@us.af.mil and to 10ces.cenp.usafadevreviewgrp@us.af.mil. USAFA has no additional comments or concerns regarding the proposed addition to the existing Rocky Mountain Cycle Plaza.
View attached comment letter
PCD Project Managerreview 1Feb 9, 2026
See comment on Letter of Intent.
View attached comment letter
PCD Project Managerreview 1Feb 9, 2026
See comment on Landscape Plan.
View attached comment letter
PCD Project Managerreview 1Feb 9, 2026
Please see comments on Site Development Plan.
View attached comment letter
PCD Project Managerreview 1Feb 9, 2026
Please see comments on Road Impact Fee Acknowledgement.
View attached comment letter
PCD Project Managerreview 1Feb 9, 2026
Please see comments on Lighting Plan.
View attached comment letter
PCD Project Managerreview 1Feb 9, 2026
Please see comments on Elevation Plans.
View attached comment letter
Tri-Lakes-Monument Fire Protection Districtreview 1Feb 9, 2026
No comment for site plan and emergency access. Please review original RBD plans to ensure there is a fire rated separation within the building. If a separation does not exist, the applicant may be required to install fire sprinklers and accompanying alarm systems.
EPC DPW Stormwaterreview 1Feb 9, 2026
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document(s): - Letter of Intent Please provide the following document(s) upon resubmittal (the planner will need to send an upload request): - PCM Applicability Form Reviewed by: Zachary Jannusch Associate Engineer - Stormwater 719.500.3170 ZacharyJannusch@elpasoco.com
Pikes Peak Regional Building Departmentreview 1Feb 4, 2026
Enumerations has no comment or objection. Brent Johnson Enumerations Plans Examiner Pikes Peak Regional Building Department O: 719-327-2888 E: brent@pprbd.org W: pprbd.org
EPC DPW Development Services - Engineeringreview 1Feb 3, 2026
Review 1. Engineering comments on the following documents (to be uploaded by the project manager at a later date): - Letter of Intent - Site Development Plan - Road Impact Fee Acknowledgement Form Reviewed by: Joe Sandstrom, EI, Associate Engineer josephsandstrom@elpasoco.com (719) 520-6314
Donala Water and San Distreview 1Jan 29, 2026
The Donala Water and Sanitation District takes no exception to the approval of the site development plan for the 2,560 square foot showroom addition to the existing building conditioned upon the following comments being addressed. 1. The owner and contractor shall provide written confirmation that the building addition will not provide for any new water supply or wastewater fixtures. 2. The showroom addition does not impact the existing water service line or wastewater service line in any way. 3. The Site Plan shall be updated to show the existing District fire hydrant, water distribution piping and existing District utility easement across the access drive from the northeasterly corner of the proposed building addition. 4. Revise the submitted landscape plan showing plantings at the east side of the access drive at the easterly side of the showroom addition. The plan as submitted does not reflect conformance with the District’s request as expressed in the review comments of February 6, 2023. The request was to revise the then existing landscape plan to maintain plantings no less than 10-feet away from the fire hydrant at the east side of the access drive. Based on cursory examination of the as-constructed plantings, it appears the request has been given attention but should be verified. There appears to be immature low grow shrubs within the 10-foot proximity although deciduous and coniferous tree plantings appear to be compliant with the District’s request. Please revise the landscape plan submitted as part of the PPR263 application to reflect compliance with the District’s requirement. 5. Please confirm that the building addition is being designed and will be constructed as a separate “fire area,” or will be an addition to the existing, “fire area” and does not require an interior fire suppression sprinkler system to be installed. The District will provide a plan review when building permit plans are submitted and made available for review and acceptance.
Mountain View Electric Association, Inc.review 1Jan 29, 2026
See attached comment letter
View attached comment letter
EPC Health Departmentreview 1Jan 27, 2026
View attached comment letter
EPC Health Departmentreview 1Jan 27, 2026
View attached comment letter