847 Struthers Ranch Road Minor Amendment
Minor Site Development Plan Amendment to add a 2,560 sq ft addition to an existing building. Previous approval is found under EDARP file number PPR2248.
- Location
- 14650 DECORATORS VW, 80921
- Jurisdiction
- El Paso County
- Applicant
- Hammers Construction Lisa Peterson
- Land owner (assessor)
- MARSHALLS FAMILY PROPERTY LLC (state record)
- County project manager
- Miranda Benson
- Filed
- Dec 2, 2025
- Parcel
- 7136303014
- Map
-
Parcel boundaries: Colorado public parcel data · Basemap © OpenStreetMap contributors
- Area map
- See all Tri-Lakes projects on the map
- Source record
- El Paso County EDARP file
Documents (30)
Email CommunicationadditionalMay 15, 2026
Assessor's Office correction to website depiction of lot lines.
Agency review comments (27)
PCD Project Managerreview 3Aug 28, 2026
V3_Planning comments.
Comments were resolved on the following:
- Letter of Intent
- Lighting Plan
- Site Development Plan
No additional comments from Planning. Site Development Plan documents will be forwarded to the Planning Manager for signatures and stamps of approval.
Thank you,
Miranda Benson, 719-520-7940
MirandaBenson2@elpasoco.com
EPC DPW Stormwaterreview 4Aug 27, 2026
Review 3: EPC DPW Stormwater comments have been resolved on the following document(s):
- PCM Applicability Form
EPC DPW Stormwater has no further comments. EPC Project Manager: no re-review necessary.
Reviewed by:
Zachary Jannusch
Associate Engineer - Stormwater
719.500.3170
ZacharyJannusch@elpasoco.com
EPC DPW Development Services - Engineeringreview 3Aug 26, 2026
Review 3.
Engineering comments are resolved. No additional review needed.
Applicant Note: A drainage letter may still be required with the forthcoming application for the development on Lots 3 and 4.
Reviewed by:
Joe Sandstrom, EIT, CFM
Associate Engineer
Department of Public Works
O: 719-520-6314
M: 719-505-0516
https://publicworks.elpasoco.com
EPC DPW Stormwaterreview 3Jul 7, 2026
Review 2 *Revised*: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document(s):
- PCM Applicability Form
A drainage letter is no longer being requested for this project.
Reviewed by:
Zachary Jannusch
Associate Engineer - Stormwater
719.500.3170
ZacharyJannusch@elpasoco.com
PCD Project Managerreview 2May 13, 2026
V2 - Site Development Plan_COMMENTS
PCD Project Managerreview 2May 13, 2026
V2_Planning review is complete.
Comments were resolved on the following docs:
- Elevation Plan
- Landscaping Plan (no landscaping is being removed, 4 shrubs are being added)
Additional comments have been made to the following docs:
- Letter of Intent
- Lighting Plan
- Site Dev Plan
Please note that addressing comments on LOI and SDP may result in required changes to the Landscaping Plan. For this reason, I am including this document in the V3_ request.
Thank you,
Miranda Benson, 719-520-7940
MirandaBenson2@elpasoco.com
EPC DPW Development Services - Engineeringreview 2May 13, 2026
Review 2.
Development Services Engineering requires a drainage letter to be submitted with the next review for the increase in flows generated by the increased impervious on the adjacent parcels. No additional comments for this review. Additional comments may be generated on new information/documents submitted for the next review.
Reviewed by:
Joe Sandstrom, EIT, CFM
Associate Engineer
Department of Public Works
O: 719-520-6314
M: 719-505-0516
https://publicworks.elpasoco.com
EPC DPW Stormwaterreview 2May 13, 2026
Review 2: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document(s):
- Letter of Intent
- PCM Applicability Form
- Site Development Plan
Since the asphalt millings were placed on all three lots, all three lots are under the same ownership, and the asphalt millings are an extension of the current use on the northern parcel, the unapproved disturbance will be addressed with this site development plan.
Please provide the following document(s) upon resubmittal (the planner will need to send an upload request):
- Drainage Letter
The drainage letter is being requested to discuss drainage impacts and for the existing stormwater pond to be analyzed under the proposed conditions.
Reviewed by:
Zachary Jannusch
Associate Engineer - Stormwater
719.500.3170
ZacharyJannusch@elpasoco.com
Black Hills Energy-Aquilareview 1Feb 26, 2026
BHE will serve please call in locates. If Building is adding more BTU's please contact BHE for meter sizing
USAFA Base Plannerreview 1Feb 23, 2026
Thank you for sending the United States Air Force Academy (USAFA) the project review request for the “847 Struthers Ranch Road – Rocky Mountain Cycle Plaza Amendment” (File #: PPR263). Due to the property’s proximity to the installation boundary, USAFA requests that the county considers asking the applicant to include a noise notice on the development plan and to file an avigation easement with the El Paso County Clerk and Recorder’s Office. Instructions for both the noise notice and the avigation easement are attached to this comment. Once these items are completed, please provide the updated development plan and the recorded avigation easement to Community Planner Sabrina Untal at sabrina.untal.ctr@us.af.mil and to 10ces.cenp.usafadevreviewgrp@us.af.mil. USAFA has no additional comments or concerns regarding the proposed addition to the existing Rocky Mountain Cycle Plaza.
PCD Project Managerreview 1Feb 9, 2026
Please see comments on Site Development Plan.
PCD Project Managerreview 1Feb 9, 2026
Please see comments on Road Impact Fee Acknowledgement.
PCD Project Managerreview 1Feb 9, 2026
Please see comments on Lighting Plan.
PCD Project Managerreview 1Feb 9, 2026
Please see comments on Elevation Plans.
Tri-Lakes-Monument Fire Protection Districtreview 1Feb 9, 2026
No comment for site plan and emergency access. Please review original RBD plans to ensure there is a fire rated separation within the building. If a separation does not exist, the applicant may be required to install fire sprinklers and accompanying alarm systems.
EPC DPW Stormwaterreview 1Feb 9, 2026
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document(s):
- Letter of Intent
Please provide the following document(s) upon resubmittal (the planner will need to send an upload request):
- PCM Applicability Form
Reviewed by:
Zachary Jannusch
Associate Engineer - Stormwater
719.500.3170
ZacharyJannusch@elpasoco.com
Pikes Peak Regional Building Departmentreview 1Feb 4, 2026
Enumerations has no comment or objection.
Brent Johnson
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2888 E: brent@pprbd.org W: pprbd.org
EPC DPW Development Services - Engineeringreview 1Feb 3, 2026
Review 1.
Engineering comments on the following documents (to be uploaded by the project manager at a later date):
- Letter of Intent
- Site Development Plan
- Road Impact Fee Acknowledgement Form
Reviewed by:
Joe Sandstrom, EI, Associate Engineer
josephsandstrom@elpasoco.com
(719) 520-6314
Donala Water and San Distreview 1Jan 29, 2026
The Donala Water and Sanitation District takes no exception to the approval of the site development plan for the 2,560 square foot showroom addition to the existing building conditioned upon the following comments being addressed.
1. The owner and contractor shall provide written confirmation that the building addition will not provide for any new water supply or wastewater fixtures.
2. The showroom addition does not impact the existing water service line or wastewater service line in any way.
3. The Site Plan shall be updated to show the existing District fire hydrant, water distribution piping and existing District utility easement across the access drive from the northeasterly corner of the proposed building addition.
4. Revise the submitted landscape plan showing plantings at the east side of the access drive at the easterly side of the showroom addition. The plan as submitted does not reflect conformance with the District’s request as expressed in the review comments of February 6, 2023. The request was to revise the then existing landscape plan to maintain plantings no less than 10-feet away from the fire hydrant at the east side of the access drive. Based on cursory examination of the as-constructed plantings, it appears the request has been given attention but should be verified. There appears to be immature low grow shrubs within the 10-foot proximity although deciduous and coniferous tree plantings appear to be compliant with the District’s request. Please revise the landscape plan submitted as part of the PPR263 application to reflect compliance with the District’s requirement.
5. Please confirm that the building addition is being designed and will be constructed as a separate “fire area,” or will be an addition to the existing, “fire area” and does not require an interior fire suppression sprinkler system to be installed.
The District will provide a plan review when building permit plans are submitted and made available for review and acceptance.
Mountain View Electric Association, Inc.review 1Jan 29, 2026
See attached comment letter
Land ownership timeline
- Feb 27, 2026Parcel 7136303014 acquired by MARSHALLS FAMILY PROPERTY LLC (state record) for $4,000,000 (assessor record)
Timeline
- Sep 9, 2026Left the EDARP active list (approved, withdrawn, or closed)
- Sep 2, 2026Project Ready for Approval requests. Review Comment period is complete.
- Aug 28, 2026Request for Review Comments returned by PCD Project Manager
- Aug 27, 2026Request for Review Comments returned by EPC DPW Stormwater
- Aug 26, 2026Request for Review Comments returned by EPC DPW Development Services - Engineering
- Aug 18, 2026Request for Review Comments email sent for Project 847 Struthers Ranch Road Minor Amendment for review by Zachary Jannusch on behalf of EPC DPW Stormwater
- Aug 18, 2026Request for Review Comments email sent for Project 847 Struthers Ranch Road Minor Amendment for review by Mikayla Hartford on behalf of EPC DPW Stormwater
- Aug 18, 2026Request for Review Comments email sent for Project 847 Struthers Ranch Road Minor Amendment for review by Glenn Reese on behalf of EPC DPW Stormwater
- Aug 18, 2026Request for Review Comments email sent for Project 847 Struthers Ranch Road Minor Amendment for review by Erica Rylander on behalf of EPC DPW Stormwater
- Aug 18, 2026Request for Review Comments email sent for Project 847 Struthers Ranch Road Minor Amendment for review by Christina Prete on behalf of EPC DPW Stormwater
- Aug 18, 2026Request for Review Comments email sent for Project 847 Struthers Ranch Road Minor Amendment for review by Gilbert LaForce on behalf of EPC DPW Development Services - Engineering
- Aug 18, 2026Request for Review Comments email sent for Project 847 Struthers Ranch Road Minor Amendment for review by Engineering Manager on behalf of EPC DPW Development Services - Engineering
- Aug 18, 2026Request for Review Comments email sent for Project 847 Struthers Ranch Road Minor Amendment for review by Justin Kilgore on behalf of PCD Project Manager
- Aug 18, 2026Submission Triaged
- Aug 17, 2026Submission received from Applicant
- Jul 7, 2026Request for Review Comments returned by EPC DPW Stormwater
- Jul 7, 2026Request for Review Comments email sent for Project 847 Struthers Ranch Road Minor Amendment for review by Zachary Jannusch on behalf of EPC DPW Stormwater
- Jul 7, 2026Request for Review Comments email sent for Project 847 Struthers Ranch Road Minor Amendment for review by Mikayla Hartford on behalf of EPC DPW Stormwater
- Jul 7, 2026Request for Review Comments email sent for Project 847 Struthers Ranch Road Minor Amendment for review by Glenn Reese on behalf of EPC DPW Stormwater
- Jul 7, 2026Request for Review Comments email sent for Project 847 Struthers Ranch Road Minor Amendment for review by Christina Prete on behalf of EPC DPW Stormwater
- Jul 7, 2026Request for Review Comments email sent for Project 847 Struthers Ranch Road Minor Amendment for review by Erica Rylander on behalf of EPC DPW Stormwater
- May 13, 2026Submission request sent to Applicant
- May 13, 2026Request for Review Comments returned by PCD Project Manager
- May 13, 2026Request for Review Comments returned by EPC DPW Development Services - Engineering
- May 13, 2026Request for Review Comments returned by EPC DPW Stormwater
- May 4, 2026Project Manager Assigned: Miranda Benson
- Apr 29, 2026Request for Review Comments email sent for Project 847 Struthers Ranch Road - Rocky Mountain Cycle Plaza Amendment for review by Jeff Hodge on behalf of Donala Water and San Dist
- Apr 29, 2026Request for Review Comments email sent for Project 847 Struthers Ranch Road - Rocky Mountain Cycle Plaza Amendment for review by Christina Hawker on behalf of Donala Water and San Dist
- Apr 29, 2026Request for Review Comments email sent for Project 847 Struthers Ranch Road - Rocky Mountain Cycle Plaza Amendment for review by Zachary Jannusch on behalf of EPC DPW Stormwater
- Apr 29, 2026Request for Review Comments email sent for Project 847 Struthers Ranch Road - Rocky Mountain Cycle Plaza Amendment for review by Glenn Reese on behalf of EPC DPW Stormwater
- Apr 29, 2026Request for Review Comments email sent for Project 847 Struthers Ranch Road - Rocky Mountain Cycle Plaza Amendment for review by Mikayla Hartford on behalf of EPC DPW Stormwater
- Apr 29, 2026Request for Review Comments email sent for Project 847 Struthers Ranch Road - Rocky Mountain Cycle Plaza Amendment for review by Christina Prete on behalf of EPC DPW Stormwater
- Apr 29, 2026Request for Review Comments email sent for Project 847 Struthers Ranch Road - Rocky Mountain Cycle Plaza Amendment for review by Gilbert LaForce on behalf of EPC DPW Development Services - Engineering
- Apr 29, 2026Request for Review Comments email sent for Project 847 Struthers Ranch Road - Rocky Mountain Cycle Plaza Amendment for review by Engineering Manager on behalf of EPC DPW Development Services - Engineering
- Apr 29, 2026Request for Review Comments email sent for Project 847 Struthers Ranch Road - Rocky Mountain Cycle Plaza Amendment for review by Justin Kilgore on behalf of PCD Project Manager
- Apr 29, 2026Submission Triaged
- Apr 28, 2026Submission received from Applicant
- Apr 14, 2026Submission request sent to Applicant
- Feb 26, 2026Request for Review Comments returned by Black Hills Energy-Aquila
- Feb 23, 2026Request for Review Comments returned by USAFA Base Planner
- Feb 9, 2026Submission request sent to Applicant
- Feb 9, 2026Request for Review Comments email sent for Project 847 Struthers Ranch Road - Rocky Mountain Cycle Plaza Amendment for review by Sabrina Untal on behalf of USAFA Base Planner
- Feb 9, 2026Request for Review Comments email sent for Project 847 Struthers Ranch Road - Rocky Mountain Cycle Plaza Amendment for review by Matthew Fitzsimmons on behalf of USAFA Base Planner
- Feb 9, 2026Request for Review Comments email sent for Project 847 Struthers Ranch Road - Rocky Mountain Cycle Plaza Amendment for review by Amy Kelley on behalf of USAFA Base Planner
- Feb 9, 2026Request for Review Comments email sent for Project 847 Struthers Ranch Road - Rocky Mountain Cycle Plaza Amendment for review by on behalf of USAFA Base Planner
- Feb 9, 2026Request for Review Comments returned by PCD Project Manager
- Feb 9, 2026Request for Review Comments returned by Tri-Lakes-Monument Fire Protection District
- Feb 9, 2026Request for Review Comments returned by EPC DPW Stormwater
- Feb 4, 2026Request for Review Comments returned by Pikes Peak Regional Building Department
- Feb 3, 2026Request for Review Comments returned by EPC DPW Development Services - Engineering
- Jan 31, 2026Request for Review Comments returned by Donala Water and San Dist
- Jan 29, 2026Request for Review Comments returned by Mountain View Electric Association, Inc.
- Jan 27, 2026Request for Review Comments returned by EPC Health Department
- Jan 26, 2026Request for Review Comments email sent for Project 847 Struthers Ranch Road - Rocky Mountain Cycle Plaza Amendment for review by Jonathan Bradley on behalf of Tri-Lakes-Monument Fire Protection District
- Jan 26, 2026Request for Review Comments email sent for Project 847 Struthers Ranch Road - Rocky Mountain Cycle Plaza Amendment for review by Jeff Hodge on behalf of Donala Water and San Dist
- Jan 26, 2026Request for Review Comments email sent for Project 847 Struthers Ranch Road - Rocky Mountain Cycle Plaza Amendment for review by Christina Hawker on behalf of Donala Water and San Dist
- Jan 26, 2026Request for Review Comments email sent for Project 847 Struthers Ranch Road - Rocky Mountain Cycle Plaza Amendment for review by Trish Riber on behalf of Black Hills Energy-Aquila
- Jan 26, 2026Request for Review Comments email sent for Project 847 Struthers Ranch Road - Rocky Mountain Cycle Plaza Amendment for review by Marcus Henderson on behalf of Black Hills Energy-Aquila
- Jan 26, 2026Request for Review Comments email sent for Project 847 Struthers Ranch Road - Rocky Mountain Cycle Plaza Amendment for review by Bob Swatek on behalf of Black Hills Energy-Aquila
- Jan 26, 2026Request for Review Comments email sent for Project 847 Struthers Ranch Road - Rocky Mountain Cycle Plaza Amendment for review by Adam Magoon on behalf of Black Hills Energy-Aquila
- Jan 26, 2026Request for Review Comments email sent for Project 847 Struthers Ranch Road - Rocky Mountain Cycle Plaza Amendment for review by on behalf of Pikes Peak Regional Building Department
- Jan 26, 2026Request for Review Comments email sent for Project 847 Struthers Ranch Road - Rocky Mountain Cycle Plaza Amendment for review by General Email on behalf of Mountain View Electric Association, Inc.
- Jan 26, 2026Request for Review Comments email sent for Project 847 Struthers Ranch Road - Rocky Mountain Cycle Plaza Amendment for review by Mike McCarthy on behalf of EPC Health Department
- Jan 26, 2026Request for Review Comments email sent for Project 847 Struthers Ranch Road - Rocky Mountain Cycle Plaza Amendment for review by Catherine McGarvy on behalf of EPC Health Department
- Jan 26, 2026Request for Review Comments email sent for Project 847 Struthers Ranch Road - Rocky Mountain Cycle Plaza Amendment for review by HEAEH LandUse on behalf of EPC Health Department
- Jan 26, 2026Request for Review Comments email sent for Project 847 Struthers Ranch Road - Rocky Mountain Cycle Plaza Amendment for review by Zachary Jannusch on behalf of EPC DPW Stormwater
- Jan 26, 2026Request for Review Comments email sent for Project 847 Struthers Ranch Road - Rocky Mountain Cycle Plaza Amendment for review by Glenn Reese on behalf of EPC DPW Stormwater
- Jan 26, 2026Request for Review Comments email sent for Project 847 Struthers Ranch Road - Rocky Mountain Cycle Plaza Amendment for review by Mikayla Hartford on behalf of EPC DPW Stormwater
- Jan 26, 2026Request for Review Comments email sent for Project 847 Struthers Ranch Road - Rocky Mountain Cycle Plaza Amendment for review by Christina Prete on behalf of EPC DPW Stormwater
- Jan 26, 2026Request for Review Comments email sent for Project 847 Struthers Ranch Road - Rocky Mountain Cycle Plaza Amendment for review by Gilbert LaForce on behalf of EPC DPW Development Services - Engineering
- Jan 26, 2026Request for Review Comments email sent for Project 847 Struthers Ranch Road - Rocky Mountain Cycle Plaza Amendment for review by Engineering Manager on behalf of EPC DPW Development Services - Engineering
- Jan 26, 2026Request for Review Comments email sent for Project 847 Struthers Ranch Road - Rocky Mountain Cycle Plaza Amendment for review by Justin Kilgore on behalf of PCD Project Manager
- Jan 26, 2026Fees paid: 1/26/2026 (Receipt: 1011577)
- Jan 26, 2026File # Assigned: PPR263
- Jan 26, 2026Payment Request sent: 1/26/2026
- Jan 26, 2026Submission Triaged
- Jan 24, 2026Submission received from Applicant
- Dec 2, 2025Submission request sent to Applicant
- Dec 2, 2025Project Created
- Dec 2, 2025Project Manager Assigned: Lisa Elgin