Amen Parcels Vollmer Road

Vacation V261 Active

ROW Vacation

Jurisdiction
El Paso County
Applicant
N.E.S. Inc. Jason Alwine
County project manager
Kylie Bagley
Filed
Apr 1, 2026
Parcel
5121001020
Map
Parcel boundaries: Colorado public parcel data · Basemap © OpenStreetMap contributors
Area map
See all Tri-Lakes projects on the map
Source record
El Paso County EDARP file

Documents (12)

Vacation drawingreviewAug 20, 2026
Response to CommentsreviewAug 20, 2026
ApplicationreviewAug 20, 2026
Deed(s)reviewAug 20, 2026
DeedreviewAug 20, 2026
Letter of IntentreviewAug 20, 2026
Closure ReportreviewJul 2, 2026
Vacation drawingreviewJul 2, 2026
Letter of IntentreviewJul 2, 2026
Application/Petition FormreviewJul 2, 2026

Agency review comments (13)

Comments returned by referral agencies during review, from the county's public EDARP file. Some agencies attach a letter instead of (or alongside) written comments.

PCD Project Managerreview 2Sep 3, 2026
Upload proposed deeds for the right of way vacation.
EPC DPW Development Services - Engineeringreview 2Sep 3, 2026
Engineering Review Ver.2 No further engineer comments. Edward Schoenheit, Engineer E.P.C. Dept. of Public Works 2880 International Circle Colorado Springs, CO. 80910 Office: 719.520.6813 Cell: 719.502.9659 edwardschoenheit@elpasoco.com https://publicworks.elpasoco.com/department-public-works/county-engineer/
Mountain View Electric Association, Inc.review 2Sep 1, 2026
See MVEA Comment dated 8/3/2026 - MVEA objects to this vacation of right of way unless private easements are provided for our existing facilities located within this right of way.
EPC DPW Stormwaterreview 2Aug 27, 2026
Review 2: EPC DPW Stormwater still does not have any comments. Thanks. Reviewed by: Glenn Reese, P.E. Principal Engineer - Stormwater 719.675.2654 GlennReese@elpasoco.com
Mountain View Electric Association, Inc.review 1Aug 3, 2026
MVEA objections to this vacation of right of way unless private easements are provided for our existing facilities located within this right of way.
PCD Project Managerreview 1Jul 27, 2026
Vacation Drawing Redlines
View attached comment letter
PCD Project Managerreview 1Jul 27, 2026
Letter of Intent Redlines
View attached comment letter
EPC DPW Development Services - Engineeringreview 1Jul 23, 2026
Engineering Review Ver.1 Please see engineering review comments on the following documents LOI_V1 (to be uploaded by PCD) Vacation Plat Drawing_V1 (to be uploaded by PCD) Edward Schoenheit, Engineer E.P.C. Dept. of Public Works 2880 International Circle Colorado Springs, CO. 80910 Office: 719.520.6813 Cell: 719.502.9659 edwardschoenheit@elpasoco.com https://publicworks.elpasoco.com/department-public-works/county-engineer/
EPC DPW Stormwaterreview 1Jul 22, 2026
Review 1: EPC DPW Stormwater does not have any comments. Thanks. Reviewed by: Glenn Reese, P.E. Principal Engineer - Stormwater 719.675.2654 GlennReese@elpasoco.com
Falcon Fire Protection Districtreview 1Jul 22, 2026
View attached comment letter
Falcon Fire Protection Districtreview 1Jul 22, 2026
View attached comment letter
Falcon Fire Protection Districtreview 1Jul 22, 2026
View attached comment letter
El Paso County Conservation Distreview 1Jul 21, 2026
The EPCCD has revied this and we have no conservation or natural resource related comments at this time for this request.

Timeline