Antler Range Filing No. 1
Filing 1, Lots 1-9 of Preliminary Plan
- Location
- N MERIDIAN RD, 80106
- Jurisdiction
- El Paso County
- Applicant
- Vertex Consulting Services Nina Ruiz
- Land owner (assessor)
- ANTLER RANGE LLC (state record)
- County project manager
- Kari Parsons
- Filed
- Nov 7, 2024
- Parcel
- 4218000022
- Map
-
Parcel boundaries: Colorado public parcel data · Basemap © OpenStreetMap contributors
- Area map
- See all Tri-Lakes projects on the map
- Source record
- El Paso County EDARP file
Documents (76)
PCM - Notice of Intent to Construct a Non-Juris. Water Impoundment Structure (proof of submittal)reviewJun 12, 2026
Mailing LabelsadditionalJun 25, 2026
Mailing Labels for the 44 surrounding property owners that received notices. Cost = $32.56. TC
Notice of ApplicationadditionalJun 25, 2026
Notice of Application letters were mailed to surrounding property owners on 6/25/2026. TC
Agency review comments (112)
County Attorney - Development Reviewreview 6Sep 22, 2026
Regarding the SIA, please fill in the type and form of collateral before finalizing.
Regarding the Detention Maintenance Agreement, paragraphs 7 and 10 are missing the County’s standard template language. Please make sure the language is consistent with the County template (and prior County draft).
Paragraph 7, regarding Reimbursement of County Costs, needs to include the paragraph discussing the term “actual costs and expenses” and how it shall be liberally construed in favor of the County.
Paragraph 10, relating to Indemnification, also needs to mirror the standard template language, including the provision that “Nothing in this Paragraph shall be deemed to waive or otherwise limit the defense available to the County pursuant to the Colorado Governmental Immunity Act, Sections 24-10-101, et seq. C.R.S., or as otherwise provided by law.”
Regarding the Ayer Road /access easement issue, Ms. Seago will respond separately via email.
Reviewed by: Erika Keech, Sr. County Attorney, erikakeech2@elpasoco.com.
PCD Project Managerreview 6Sep 15, 2026
Please make sure the FAE and the SIA dollar amounts match.
The FAE has been approved and uploaded.
Please make all revisions to contracts and upload a final version with all attachments signed and notarized.
The HOA docs must be completed and reviewed by CAO.
PCD Engineering Divisionreview 6Sep 15, 2026
DPW Engineering review comment
The collateral listed in the SIA ($246,846.75) does not match the value listed in the FAE ($250,363.75). Please revise.
Review by
Bret Dilts, PE
bretdilts@elpasoco.com
719-520-6864
PCD Project Managerreview 5Sep 2, 2026
Planning has no comments. A record of admin action is forthcoming. Please ensure a precon is scheduled prior to earthwork.
PCD Engineering Divisionreview 4Sep 2, 2026
DPW Engineering Review 4 comments have been addressed on the following documents
- Final Plat Drawings
- Closures Sheet
- Construction Drawings
Engineering documents will be forwarded to the Engineering Manager for approvals.
Review by
Bret Dilts, PE
bretdilts@elpasoco.com
719-520-6864
County Attorney - Development Reviewreview 5Sep 1, 2026
1. 8/21/26 version of SIA can be finalized for signature.
2. See attached edits to 8/21/26 version of Detention Pond Maintenance Agreement. If the easement is granted over the entire property, Exhibit B is not needed. If these edits are accepted, it can be finalized for signature.
Reviewed by: Erika Keech, Sr. County Attorney, erikakeech2@elpasoco.com.
EPC Stormwater Reviewreview 5Aug 27, 2026
Review 4: EPC DPW Stormwater comments have been resolved on the following document(s):
- CDs
- PCM O&M Manual
EPC DPW Stormwater has no further comments. EPC Project Manager: no re-review necessary.
Reviewed by:
Zachary Jannusch
Associate Engineer - Stormwater
719.500.3170
ZacharyJannusch@elpasoco.com
PCD Engineering Divisionreview 3Jun 30, 2026
DPW Engineering Review 3 has comments on the following documents
- Final Plat Drawings (uploaded by Project Manager)
- Closures Sheet (uploaded by Project Manager)
- Construction Drawings
Comments have been resolved on the following documents
- Drainage Report - Final (minor comments)
Review by
Bret Dilts, PE
bretdilts@elpasoco.com
719-520-6864
PCD Project Managerreview 4Jun 30, 2026
closure sheet comments unresolved.
PCD Project Managerreview 4Jun 30, 2026
O and M for I and M for extended Basin comments
County Attorney - Development Reviewreview 4Jun 29, 2026
Most recent DMA and exhibits look good. Please finalize and prepare the DMA for signature.
Once attached edits to SIA are incorporated, it can also be finalized for signature.
Reviewed by: Erika Keech, Sr. County Attorney, erikakeech2@elpasoco.com.
PCD Administrative Noticereview 4Jun 25, 2026
On 06/25/2026, PCD mailed "Notice of Application" letters to surrounding property owners within a 500-foot range (44 addresses). Copies of the notice, mailing labels, and selected range have been uploaded to the EDARP file. Cost of postage to be billed to the applicant = $32.56. TC
EPC Stormwater Reviewreview 4Jun 25, 2026
Review 3: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document(s) (to be uploaded by DS engineer or EPC PM):
- CDs
- PCM O&M Manual
EPC DPW Stormwater comments have been resolved on the following document(s):
- ESQCP
- FAE
- PCM - Notice of Intent to Construct a Non-Jurisdictional Water Impoundment Structure (proof of submittal)
- SWMP
- SWMP Checklist
Reviewed by:
Zachary Jannusch
Associate Engineer - Stormwater
719.500.3170
ZacharyJannusch@elpasoco.com
Pikes Peak Regional Building Departmentreview 4Jun 16, 2026
1. Addresses have been assigned and received. Please add the addresses to the plat.
2. Standard final plat comments still apply. See prior comments for details.
Amy Vanderbeek
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2930 E: Amy@pprbd.org
PCD Project Managerreview 3May 11, 2026
Please add a plat note- clearly stating that the Cistern to serve Filing no 1 will be constructed with Filing 2 and located XXXXX
PCD Project Managerreview 3May 11, 2026
Additional information requested on Notice
PCD Project Managerreview 3May 11, 2026
Final Plat Comments. Some comments are repeat.
PCD Project Managerreview 3May 11, 2026
Drainage Report review 1 response comments
PCD Project Managerreview 3May 11, 2026
It is anticipated that the approval this Plat will be administratively now that water sufficiency is anticipated to be made at the BOCC hearing with the Preliminary Plan. Please make sure SIA has a notary and the executive director's signature block, not the BOCC and Attest block.
PCD Engineering Divisionreview 2May 8, 2026
DPW Engineering Review 2 has comments on the following documents
- Final Plat Drawings
- Construction Drawings
- Closures Sheet
- Drainage Report - Final (minor comments)
Comments have been resolved on the following documents
- Letter of Intent
- Traffic Impact Study
- FAE
Review by
Bret Dilts, PE
bretdilts@elpasoco.com
719-520-6864
EPC Stormwater Reviewreview 3May 7, 2026
Review 2: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document(s) (to be uploaded by DS engineer or EPC PM):
- CDs
- ESQCP (sign + date)
- FAE
- PCM O&M Manual
- PCM - Notice of Intent to Construct a Non-Jurisdictional Water Impoundment Structure (proof of submittal)
- SWMP
- SWMP Checklist
EPC DPW Stormwater comments have been resolved on the following document(s):
- Drainage Report
- Final Plat
- GEC Checklist
- MHFD Calcs
- PCM Applicability Form
Reviewed by:
Zachary Jannusch
Associate Engineer - Stormwater
719.500.3170
ZacharyJannusch@elpasoco.com
Falcon Fire Protection Districtreview 3May 6, 2026
One comment, under the Fire Protection Report, section construction requirements, it states Tri Lakes Fire District standards several times. Tri Lakes Fire District shall be removed and replaced with Falcon Fire Protection District. No additional comments or concerns.
Curtis L.Kauffman
Fire Prevention Division
Lieutenant/Fire Marshal
El Paso County Conservation Distreview 3May 5, 2026
The EPCCD had a conversation with the applicant on 3/17 to talk on the topic of the concerns mentioned in our previous comment. As of current, we have no further comment on Antler Range Filing No 1 but would like to reserve the right for further comment on future filings and any changes.
County Attorney - Development Reviewreview 3May 1, 2026
Regarding the SIA, please remove signature block for County Clerk & Recorder and change the County's signature block to:
BOARD OF COUNTY COMMISSIONERS
OF EL PASO COUNTY, COLORADO
By: ____________________________
Meggan Herington, Executive Director
Planning and Community Development
Authorized signatory pursuant to LDC
Regarding the DMA, attorney comments from 3/12/26 remain unaddressed.
Erika Keech, Sr. County Attorney, erikakeech2@elpasoco.com.
County Attorney - Waterreview 3Apr 28, 2026
Thank you for the Water Quality assessment. Please review the Requirements beginning on page 3 of the Water Supply Review and Recommendations in connection with the preliminary plan. All requirements must be complied with prior to recording the final plat.
911 Authority - El Paso/Teller Countyreview 3Apr 28, 2026
Comments for E911 as follows:
The public ROW labeled as “Broken Arrow Ct” on the plan drawings should instead be a logical continuation of Broken Antler Ct.
Thank you
Justin
Pikes Peak Regional Building Departmentreview 3Apr 27, 2026
See prior comments.
Amy Vanderbeek
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2930 E: Amy@pprbd.org
PCD Project Managerreview 2Mar 25, 2026
See comments on Stormwater Management Plan.
Black Forest Land Use Committeereview 1Mar 25, 2026
The Black Forest Land Use Committee has no objections to this filing.
County Attorney - Waterreview 1Mar 22, 2026
Applicant has provided water quality test results in the SP file, but EPCPH has not yet provided a recommendation of sufficient water quality. Such a recommendation must be received prior to scheduling this application for Planning Commission, per the Water Supply Review.
Lori Seago
Sr. County Attorney
loriseago@elpasoco.com
PCD Engineering Divisionreview 1Mar 20, 2026
DPW Engineering Review 1 has comments on the following documents
- Final Plat Drawings
- Construction Drawings
- Traffic Impact Study
- Closures Sheet
- Drainage Report - Final
- FAE
- Letter of Intent (uploaded by PM)
Please refer to comments on the Construction drawings for GEC Plan comments.
Review by
Bret Dilts, PE
bretdilts@elpasoco.com
719-520-6864
PCD Engineering Divisionreview 1Mar 20, 2026
Final Plat Drawings (ENG comments)
EPC Parks Departmentreview 1Mar 20, 2026
Please see attached documentation from our administrative review.
Thank you!
Ashlyn Mathy
Parks Planner
Park Planning Division
El Paso County Parks Department
Office 719.520.6999
PCD Project Managerreview 1Mar 19, 2026
See comments on the PCM O&M Manual.
PCD Project Managerreview 1Mar 19, 2026
See comments on Stormwater Management Plan Checklist.
PCD Project Managerreview 1Mar 19, 2026
See comments on MHFD Detention Calculations.
PCD Project Managerreview 1Mar 19, 2026
See comments on PCM Applicability Form.
PCD Project Managerreview 1Mar 19, 2026
See comments on Water Supply Information Summary.
PCD Project Managerreview 1Mar 19, 2026
See comment on Subdivision Improvement Agreement.
PCD Project Managerreview 1Mar 19, 2026
See comments on Letter of Intent.
PCD Project Managerreview 1Mar 19, 2026
See comments on Fire Protection Report.
PCD Project Managerreview 1Mar 19, 2026
See comments on Final Plat Drawings.
EPC Stormwater Reviewreview 1Mar 19, 2026
SWMP Checklist (2025 version with EPC comments)
EPC Stormwater Reviewreview 1Mar 19, 2026
GEC Checklist (2025 version with EPC comments)
EPC Stormwater Reviewreview 1Mar 18, 2026
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document(s):
- CDs
- Drainage Report
- ESQCP
- FAE
- Final Plat
- GEC Checklist (Use current version)
- MHFD Calcs
- PCM Applicability Form
- PCM O&M Manual
- SWMP
- SWMP Checklist (Use current version)
Please provide the following document upon resubmittal (the planner will need to send an upload request):
- PCM - Notice of Intent to Construct a Non-Jurisdictional Water Impoundment Structure (proof of submittal)
Reviewed by:
Zachary Jannusch
Associate Engineer - Stormwater
719.500.3170
ZacharyJannusch@elpasoco.com
El Paso County Conservation Distreview 1Mar 14, 2026
The El Paso County Conservation District has reviewed this project and we have the following concerns:
1) Erosion control
Based on the map and proposed lots, there is a minor drainage that runs across the area that eventually runs into the nearby Black Squirrel Creek. This creek had shown severe erosion issues due to flooding in recent years and we would like to see that this is protected from additional runoff/surface erosion during construction. So we would like to see an erosion control measure that prevents this as much as possible that will be required for when these lots become built on that prevents this for both during and following construction.
A) Prior to any dirt work, appropriate dirt erosion measures such as silt fences should be installed to catch any dirt that may erode off the side during the construction period.
B) Topsoil of disturbed soils stripped to a depth of approximately 6 inches and stockpiled separately, with stockpile side slopes no steeper than 3:1 to prevent erosion issues during construction. This topsoil should then be redistributed evenly on graded areas around the constructed building and prior to seeding to ensure the best chance for germination success.
C) Disturbed areas be mulched and revegetated within 45 days of disturbance using either: plant/grass species native and/or naturalized to El Paso County, or water wise landscaping with mulches that help protect the soil. Lawn areas should be treated with 1" compost prior to seeding or sod installation to help with reducing water needs.
D) Disturbed areas that are not to be landscaped should be either: mulched after seeding with weed-free hay or straw mulch at approximately 5,000 lbs per acre; Or areas that are not suitable for revegetation such as driveways, parking areas, and safety areas around the building should have a 1-2" layer of crushed rock, road base, or gravel to assist in preventing having exposed soil that would be prone to wind/runoff erosion concerns (unless being paved).
E) Consideration of using of the El Paso County Conservation District’s Native Shotgun Mix (available at EPCCD.org) for reseeding, which is well suited to soils present on this site and is comprised of 100% native and naturalized grass species.
B) Black Squirrel Creek concerns
This concern is not specific to Filing 1, but is a note for future filings that will be closer to the Black Squirrel Creek. The EPCCD has concerns about erosion and creek/wetland protection for lots near the creek. CGS has specific notes about the instability of soils along the creek that we echo. Given these concerns are about a future filing, we would like to set up a meeting/conversation with the project developer about these concerns and solutions to best mitigate them prior to the filings for those areas are submitted in an effort to best assist the developer's timeline. Thank you!
If the erosion measures are added to the project's plan as a stipulation when building homes, then the El Paso County Conservation District will be content with the applicant's commitment to soil conservation, watershed protection, and safety of the community downstream in relation to Filing 1 of their project.
For any questions, please feel free to contact the EPCCD at 719-600-4706 or districtmanager@epccd.org
County Attorney - Development Reviewreview 1Mar 12, 2026
Proposed edits to Detention Maintenance Agreement attached.
With respect to the SIA, there are no comments or edits, from County Attorney- Development Review, at this time.
Erika Keech
Sr. County Attorney
erikakeech2@elpasoco.com
Mountain View Electric Association, Inc.review 1Mar 11, 2026
See attached comment letter
Colorado Geological Surveyreview 1Mar 10, 2026
As requested by the County, the Colorado Geological Survey (CGS) has reviewed the submittal for Antler Range Filing No. 1, located at approximately 39.0066°, -104.6053°, which proposes final plat approval for nine (9) single-family residential lots within the previously approved 84-lot Antler Range Preliminary Plan (County File #SP251).
Documentation reviewed includes the Final Plat Drawings, Final Drainage Report (All Terrain Engineering, Project No. 24031, February 2026), and the Soil and Geology Study (RMG – Rocky Mountain Group, Job No. 198281, January 28, 2025; Amended September 22, 2025), among other supporting materials.
CGS has reviewed the RMG Soil and Geology Study and finds it adequate for referral purposes. The report identifies expansive and compressible soils and bedrock, FEMA floodway areas associated with Black Squirrel Creek, potentially unstable creek bank slopes, and localized or seasonally fluctuating groundwater conditions. These constraints can be addressed by implementing the report’s recommendations. The Final Drainage Report indicates that stormwater from Filing No. 1 will be detained and released at or near historic rates, and that no construction is proposed within the FEMA-designated floodway.
CGS has no objection to approval of Antler Range Filing No. 1, provided the recommendations contained in the RMG report are strictly followed, including lot-specific subsurface investigations before issuance of building permits and avoidance of construction within designated floodway areas. Subject to adherence to these recommendations, CGS supports approval of Antler Range Filing No. 1.
Submitted 3/10/2026 by Jonathan R. Lovekin, P.G. Senior Engineering Geologist, Colorado Geological Survey, jlovekin@mines.edu
Pikes Peak Regional Building Departmentreview 1Mar 5, 2026
1. Will Broken Antler Court extend into this filing? An email from Justin Annan jannan@eptc911.org; or Glenn West gwest@eptc911.org;, with El Paso-Teller County E-9-1-1 Authority, reserving the street names is required to be emailed to the Enumerations department. Amy Vanderbeek Amy@pprbd.org; Brent Johnson Brent@pprbd.org; or Becky Allen BeckyA@pprbd.org
2. On the vicinity map the suffix on the street name Broken Antler COURT is being shown incorrectly as DRIVE, correct to COURT.
3. Once addresses are received they will need to be added to the plat.
4. Standard Final Plat comments:
a. Enumerations will review the pre-plat (mylar) prior to plat for address placement, street names, and title block.
b. A $10.00 per lot and tract platting fee will be due at the time of the review of the pre-plat, (two addresses per lot and tract). If an address is not needed on a tract then no fee applies. Check should be made out to PIKES PEAK REGIONAL BUILDING DEPARTMENT or PPRBD. As of December 5th 2023, the fee for all credit/debit cards has changed from the flat 2.95% fee to the following: Over the phone Credit/Debit Card payments will be 2.3% and In-Person Debit Card payments will be 1.5% (in-person only). Paid directly to the Enumerations Department.
c. Pre-plat reviews can be reviewed via “pdf” or in-person. The pre-plat will be stamped by Enumerations for accuracy and returned to the applicant and the planner. All payments to be mailed to RBD via a check or credit card payment over the phone. Plats should not be recorded prior to Enumerations stamping the pre-plat and receiving payment of plat fees. If any pre-plat changes occur, even if changes do not apply to Enumerations, we still need to re-stamp the pre-plat. The Enumerations stamped pre-plat copy should match the recorded document minus a few signatures. If you would like an in-person review, please make an appointment on our website, https://www.pprbd.org/Home/BookAppt
d. A copy of the final recorded plat is required prior to plan submittal for RESIDENTIAL. A copy of the final recorded plat is required prior to approval in the Enumerations department on any COMMERCIAL plan submittal. Please email the Enumerations staff member that reviewed your project. Amy@pprbd.org; Brent@pprbd.org; or BeckyA@pprbd.org
Amy Vanderbeek
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2930 E: Amy@pprbd.org
RBD Floodplainreview 1Mar 4, 2026
Antler Range Filing No. 1 area shown on the "Final Plat" does not intersect the floodplain, no comment
911 Authority - El Paso/Teller Countyreview 1Feb 27, 2026
Comments for E911 as follows:
The public ROW labeled as “Road A” on the plan drawings should be a logical continuation of Broken Antler Ct.
Before approval, the streetname must be depicted on the plan drawings.
Thank you
Justin
Black Hills Energy-Aquilareview 1Feb 26, 2026
BHE will serve. Facilities in area. Please contact BHE for Main extension
Land ownership timeline
- Oct 11, 2006Parcel 4218000022 acquired by ANTLER RANGE LLC (state record) for $2,581,333 (assessor record)
Timeline
- Sep 22, 2026Submission request sent to Applicant
- Sep 22, 2026Request for Review Comments returned by County Attorney - Development Review
- Sep 15, 2026Request for Review Comments returned by PCD Project Manager
- Sep 15, 2026Request for Review Comments returned by PCD Engineering Division
- Sep 15, 2026Submission request sent to Applicant
- Sep 15, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Lori Seago on behalf of County Attorney - Water
- Sep 15, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Erika Keech on behalf of County Attorney - Water
- Sep 15, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by April Willie on behalf of County Attorney - Water
- Sep 8, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Gilbert LaForce on behalf of PCD Engineering Division
- Sep 8, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Engineering Manager on behalf of PCD Engineering Division
- Sep 8, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Lori Seago on behalf of County Attorney - Development Review
- Sep 8, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Erika Keech on behalf of County Attorney - Development Review
- Sep 8, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by April Willie on behalf of County Attorney - Development Review
- Sep 8, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Justin Kilgore on behalf of PCD Project Manager
- Sep 8, 2026Submission Triaged
- Sep 8, 2026Request for Review Comments returned by EPC Stormwater Review
- Sep 7, 2026Submission received from Applicant
- Sep 2, 2026Submission request sent to Applicant
- Sep 2, 2026Request for Review Comments returned by PCD Project Manager
- Sep 2, 2026Request for Review Comments returned by PCD Engineering Division
- Sep 1, 2026Request for Review Comments returned by County Attorney - Development Review
- Aug 24, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Evelyn galanephillips on behalf of Falcon School District 49
- Aug 24, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Zachary Jannusch on behalf of EPC Stormwater Review
- Aug 24, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Mikayla Hartford on behalf of EPC Stormwater Review
- Aug 24, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Glenn Reese on behalf of EPC Stormwater Review
- Aug 24, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Erica Rylander on behalf of EPC Stormwater Review
- Aug 24, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Christina Prete on behalf of EPC Stormwater Review
- Aug 24, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Lori Seago on behalf of County Attorney - Development Review
- Aug 24, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by April Willie on behalf of County Attorney - Development Review
- Aug 24, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Erika Keech on behalf of County Attorney - Development Review
- Aug 24, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Justin Kilgore on behalf of PCD Project Manager
- Aug 24, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Gilbert LaForce on behalf of PCD Engineering Division
- Aug 24, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Engineering Manager on behalf of PCD Engineering Division
- Aug 24, 2026Submission Triaged
- Aug 21, 2026Submission received from Applicant
- Jun 30, 2026Request for Review Comments returned by PCD Engineering Division
- Jun 30, 2026Submission request sent to Applicant
- Jun 30, 2026Request for Review Comments returned by PCD Project Manager
- Jun 30, 2026Submission request sent to Applicant
- Jun 30, 2026Request for Review Comments returned by EPC Stormwater Review
- Jun 29, 2026Fees paid: 6/29/2026 (Receipt: 1012254)
- Jun 29, 2026Request for Review Comments returned by County Attorney - Development Review
- Jun 29, 2026Payment Request sent: 6/29/2026
- Jun 25, 2026Request for Review Comments returned by PCD Administrative Notice
- Jun 18, 2026Request for Review Comments returned by Falcon Fire Protection District
- Jun 17, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by on behalf of PCD Administrative Notice
- Jun 16, 2026Request for Review Comments returned by Pikes Peak Regional Building Department
- Jun 16, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Evelyn galanephillips on behalf of Falcon School District 49
- Jun 16, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Trent Harwig on behalf of Falcon Fire Protection District
- Jun 16, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Curtis Kauffman on behalf of Falcon Fire Protection District
- Jun 16, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by on behalf of Pikes Peak Regional Building Department
- Jun 16, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Mikayla Hartford on behalf of EPC Stormwater Review
- Jun 16, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Zachary Jannusch on behalf of EPC Stormwater Review
- Jun 16, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Glenn Reese on behalf of EPC Stormwater Review
- Jun 16, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Erica Rylander on behalf of EPC Stormwater Review
- Jun 16, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Christina Prete on behalf of EPC Stormwater Review
- Jun 16, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by on behalf of EPC Public Works, County Engineer
- Jun 16, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by on behalf of EPC Public Works, County Engineer
- Jun 16, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Lori Seago on behalf of County Attorney - Development Review
- Jun 16, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Erika Keech on behalf of County Attorney - Development Review
- Jun 16, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by April Willie on behalf of County Attorney - Development Review
- Jun 16, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Justin Kilgore on behalf of PCD Project Manager
- Jun 16, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Gilbert LaForce on behalf of PCD Engineering Division
- Jun 16, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Engineering Manager on behalf of PCD Engineering Division
- Jun 16, 2026Submission Triaged
- Jun 12, 2026Submission received from Applicant
- May 31, 2026Request for Review Comments returned by EPC Health Department
- May 11, 2026Submission request sent to Applicant
- May 11, 2026Request for Review Comments returned by PCD Project Manager
- May 8, 2026Request for Review Comments returned by PCD Engineering Division
- May 7, 2026Request for Review Comments returned by EPC Stormwater Review
- May 6, 2026Request for Review Comments returned by Falcon Fire Protection District
- May 5, 2026Request for Review Comments returned by El Paso County Conservation Dist
- May 4, 2026Project Manager Assigned: Kari Parsons
- May 1, 2026Request for Review Comments returned by County Attorney - Development Review
- Apr 28, 2026Request for Review Comments returned by County Attorney - Water
- Apr 28, 2026Request for Review Comments returned by 911 Authority - El Paso/Teller County
- Apr 27, 2026Request for Review Comments returned by Pikes Peak Regional Building Department
- Apr 24, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Evelyn galanephillips on behalf of Falcon School District 49
- Apr 24, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Trish Riber on behalf of Black Hills Energy-Aquila
- Apr 24, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Bob Swatek on behalf of Black Hills Energy-Aquila
- Apr 24, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Marcus Henderson on behalf of Black Hills Energy-Aquila
- Apr 24, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by george san miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
- Apr 24, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Julie Reeves on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
- Apr 24, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
- Apr 24, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Daniel Delgado on behalf of US Army Corps of Engineers-Pueblo
- Apr 24, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Alicia Coreley on behalf of Antler Creek Metro District
- Apr 24, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Jennifer Ivey on behalf of Antler Creek Metro District
- Apr 24, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Catherine McGarvy on behalf of EPC Health Department
- Apr 24, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by HEAEH LandUse on behalf of EPC Health Department
- Apr 24, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Trent Harwig on behalf of Falcon Fire Protection District
- Apr 24, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Curtis Kauffman on behalf of Falcon Fire Protection District
- Apr 24, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by William Vogl on behalf of El Paso County Conservation Dist
- Apr 24, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Harry Thomas on behalf of El Paso County Conservation Dist
- Apr 24, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Katie Miller on behalf of El Paso County Conservation Dist
- Apr 24, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by on behalf of El Paso County Conservation Dist
- Apr 24, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Mariah Hudson on behalf of El Paso County Conservation Dist
- Apr 24, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by on behalf of Pikes Peak Regional Building Department
- Apr 24, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
- Apr 24, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
- Apr 24, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Zachary Jannusch on behalf of EPC Stormwater Review
- Apr 24, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Mikayla Hartford on behalf of EPC Stormwater Review
- Apr 24, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Glenn Reese on behalf of EPC Stormwater Review
- Apr 24, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Christina Prete on behalf of EPC Stormwater Review
- Apr 24, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Lori Seago on behalf of County Attorney - Water
- Apr 24, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Erika Keech on behalf of County Attorney - Water
- Apr 24, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by April Willie on behalf of County Attorney - Water
- Apr 24, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Lori Seago on behalf of County Attorney - Development Review
- Apr 24, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Erika Keech on behalf of County Attorney - Development Review
- Apr 24, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by April Willie on behalf of County Attorney - Development Review
- Apr 24, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Justin Kilgore on behalf of PCD Project Manager
- Apr 24, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Gilbert LaForce on behalf of PCD Engineering Division
- Apr 24, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Engineering Manager on behalf of PCD Engineering Division
- Apr 24, 2026Submission Triaged
- Apr 24, 2026Submission received from Applicant
- Apr 20, 2026Submission request sent to Applicant
- Apr 20, 2026Submission Triaged
- Apr 17, 2026Submission received from Applicant
- Apr 9, 2026Request for Review Comments returned by Colorado Parks and Wildlife
- Apr 7, 2026Submission request sent to Applicant
- Mar 25, 2026Submission request sent to Applicant
- Mar 25, 2026Request for Review Comments returned by PCD Project Manager
- Mar 25, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Justin Kilgore on behalf of PCD Project Manager
- Mar 25, 2026Request for Review Comments returned by Black Forest Land Use Committee
- Mar 23, 2026Request for Review Comments email resent for Project Antler Range Filing No. 1 for review by Travis Sauder on behalf of Colorado Parks and Wildlife
- Mar 22, 2026Request for Review Comments returned by County Attorney - Water
- Mar 20, 2026Request for Review Comments returned by PCD Engineering Division
- Mar 20, 2026Request for Review Comments returned by Colorado Parks and Wildlife
- Mar 20, 2026Request for Review Comments returned by EPC Parks Department
- Mar 19, 2026Request for Review Comments returned by PCD Project Manager
- Mar 19, 2026Request for Review Comments email resent for Project Antler Range Filing No. 1 for review by Justin Kilgore on behalf of PCD Project Manager
- Mar 19, 2026Request for Review Comments returned by PCD Project Manager
- Mar 19, 2026Request for Review Comments returned by EPC Stormwater Review
- Mar 16, 2026Request for Review Comments returned by Upper Black Squirrel Creek GWMD
- Mar 14, 2026Request for Review Comments returned by El Paso County Conservation Dist
- Mar 12, 2026Request for Review Comments returned by Falcon Fire Protection District
- Mar 12, 2026Request for Review Comments returned by County Attorney - Development Review
- Mar 11, 2026Request for Review Comments returned by Mountain View Electric Association, Inc.
- Mar 10, 2026Request for Review Comments returned by Colorado Geological Survey
- Mar 6, 2026Request for Review Comments returned by EPC Environmental Services
- Mar 5, 2026Request for Review Comments returned by Pikes Peak Regional Building Department
- Mar 4, 2026Request for Review Comments returned by RBD Floodplain
- Feb 27, 2026Request for Review Comments returned by 911 Authority - El Paso/Teller County
- Feb 26, 2026Request for Review Comments returned by Black Hills Energy-Aquila
- Feb 26, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Evelyn galanephillips on behalf of Falcon School District 49
- Feb 26, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Trent Harwig on behalf of Falcon Fire Protection District
- Feb 26, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Curtis Kauffman on behalf of Falcon Fire Protection District
- Feb 26, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by William Vogl on behalf of El Paso County Conservation Dist
- Feb 26, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Harry Thomas on behalf of El Paso County Conservation Dist
- Feb 26, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Katie Miller on behalf of El Paso County Conservation Dist
- Feb 26, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by on behalf of El Paso County Conservation Dist
- Feb 26, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Mariah Hudson on behalf of El Paso County Conservation Dist
- Feb 26, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Trish Riber on behalf of Black Hills Energy-Aquila
- Feb 26, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Marcus Henderson on behalf of Black Hills Energy-Aquila
- Feb 26, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Bob Swatek on behalf of Black Hills Energy-Aquila
- Feb 26, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Terry Stokka on behalf of Black Forest Land Use Committee
- Feb 26, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Terry Stokka on behalf of Black Forest Land Use Committee
- Feb 26, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
- Feb 26, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Keith Curtis on behalf of RBD Floodplain
- Feb 26, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by on behalf of Pikes Peak Regional Building Department
- Feb 26, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
- Feb 26, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
- Feb 26, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Julie Reeves on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
- Feb 26, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by george san miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
- Feb 26, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
- Feb 26, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Daniel Delgado on behalf of US Army Corps of Engineers-Pueblo
- Feb 26, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Travis Sauder on behalf of Colorado Parks and Wildlife
- Feb 26, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Tim Kroening on behalf of Colorado Parks and Wildlife
- Feb 26, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Peter Chapman on behalf of Colorado Parks and Wildlife
- Feb 26, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Karen Voltura on behalf of Colorado Parks and Wildlife
- Feb 26, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Carolyn Craveiro de Sa on behalf of Colorado Parks and Wildlife
- Feb 26, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Colorado Geological Survey on behalf of Colorado Geological Survey
- Feb 26, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Jennifer Ivey on behalf of Antler Creek Metro District
- Feb 26, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Alicia Coreley on behalf of Antler Creek Metro District
- Feb 26, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by General Email on behalf of Mountain View Electric Association, Inc.
- Feb 26, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by on behalf of Parks Advisory Board
- Feb 26, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Zachary Jannusch on behalf of EPC Stormwater Review
- Feb 26, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Glenn Reese on behalf of EPC Stormwater Review
- Feb 26, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Mikayla Hartford on behalf of EPC Stormwater Review
- Feb 26, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Christina Prete on behalf of EPC Stormwater Review
- Feb 26, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Jeff Kramer on behalf of EPC Sheriff's Department
- Feb 26, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Christopher Gonzalez on behalf of EPC Sheriff's Department
- Feb 26, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Andrew Prehm on behalf of EPC Sheriff's Department
- Feb 26, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by on behalf of EPC Public Works, County Engineer
- Feb 26, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by on behalf of EPC Public Works, County Engineer
- Feb 26, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by on behalf of EPC Parks Department
- Feb 26, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Mike McCarthy on behalf of EPC Health Department
- Feb 26, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Catherine McGarvy on behalf of EPC Health Department
- Feb 26, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by HEAEH LandUse on behalf of EPC Health Department
- Feb 26, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Kathy Andrew on behalf of EPC Environmental Services
- Feb 26, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Lori Seago on behalf of County Attorney - Water
- Feb 26, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Erika Keech on behalf of County Attorney - Water
- Feb 26, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by April Willie on behalf of County Attorney - Water
- Feb 26, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Lori Seago on behalf of County Attorney - Development Review
- Feb 26, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Erika Keech on behalf of County Attorney - Development Review
- Feb 26, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by April Willie on behalf of County Attorney - Development Review
- Feb 26, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Justin Kilgore on behalf of PCD Project Manager
- Feb 26, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Gilbert LaForce on behalf of PCD Engineering Division
- Feb 26, 2026Request for Review Comments email sent for Project Antler Range Filing No. 1 for review by Engineering Manager on behalf of PCD Engineering Division
- Feb 26, 2026Fees paid: 2/26/2026 (Receipt: 1011728)