Beacon Lite Road Stockpile
Stockpile of Approximately 80,000 Cubic Yards
- Location
- SE of the intersection of County Line Road and I-25
- Jurisdiction
- El Paso County
- Applicant
- Whitehead Engineering, LLC David Whitehead
- Land owner (assessor)
- CSMS MANAGEMENT LLC
- County project manager
- Stormwater Glenn Reese
- Filed
- Dec 15, 2025
- Parcel
- 7102200014
- Map
-
Parcel boundaries: Colorado public parcel data · Basemap © OpenStreetMap contributors
- Source record
- El Paso County EDARP file
Documents (34)
PCM - Notice of Intent to Construct a Non-Juris. Water Impoundment Structure (proof of submittal)reviewMar 3, 2026
Recorded - Private Detention Basin Stormwater Quality Best Management Practice Maintenance Agreement and EasementadditionalMar 27, 2026
Email Regarding GradingadditionalMar 11, 2026
The attached documents are not part of the official record for Project CDR261. They have been included in the project file for reference purposes only and should not be considered as formal submissions or evidence within the project’s official record.
Integrity Matters EmailadditionalMar 11, 2026
The attached documents are not part of the official record for Project CDR261. They have been included in the project file for reference purposes only and should not be considered as formal submissions or evidence within the project’s official record.
Integrity Matters Formal NoticeadditionalFeb 19, 2026
The attached documents are not part of the official record for Project CDR261. They have been included in the project file for reference purposes only and should not be considered as formal submissions or evidence within the project’s official record.
Timeline
- Aug 11, 2026Request for Review Comments returned by EPC DPW Stormwater
- Aug 11, 2026Request for Review Comments email resent for Project Beacon Lite Road Stockpile for review by Christina Prete on behalf of EPC DPW Stormwater
- Aug 11, 2026Request for Review Comments returned by EPC DPW Stormwater
- Aug 10, 2026Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
- Aug 7, 2026Request for Review Comments returned by US Army Corps of Engineers
- Aug 6, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Daniel Delgado on behalf of US Army Corps of Engineers
- Aug 6, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
- Aug 6, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
- Aug 6, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
- Aug 6, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Kimberly Blanchard on behalf of Colorado Department of Transportation - Pueblo Office
- Aug 6, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Brendan Cicione on behalf of Colorado Department of Public Health and Environment
- Aug 6, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by on behalf of Colorado Department of Public Health and Environment
- Aug 6, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Gilbert LaForce on behalf of EPC DPW Development Services - Engineering
- Aug 6, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Engineering Manager on behalf of EPC DPW Development Services - Engineering
- Aug 6, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Lori Seago on behalf of County Attorney - Development Review
- Aug 6, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Erika Keech on behalf of County Attorney - Development Review
- Aug 6, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by April Willie on behalf of County Attorney - Development Review
- Aug 5, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by on behalf of Colorado Department of Public Health and Environment
- Aug 5, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Brendan Cicione on behalf of Colorado Department of Public Health and Environment
- Aug 5, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Daniel Delgado on behalf of US Army Corps of Engineers
- Aug 5, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
- Aug 5, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Kimberly Blanchard on behalf of Colorado Department of Transportation - Pueblo Office
- Aug 5, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
- Aug 5, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
- Aug 5, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Michael Wicklund on behalf of Monument Sanitation
- Aug 5, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by on behalf of EPC Public Works, County Engineer
- Aug 5, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by on behalf of EPC Public Works, County Engineer
- Aug 5, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Zachary Jannusch on behalf of EPC DPW Stormwater
- Aug 5, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Glenn Reese on behalf of EPC DPW Stormwater
- Aug 5, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Mikayla Hartford on behalf of EPC DPW Stormwater
- Aug 5, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Erica Rylander on behalf of EPC DPW Stormwater
- Aug 5, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Christina Prete on behalf of EPC DPW Stormwater
- Aug 5, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Gilbert LaForce on behalf of EPC DPW Development Services - Engineering
- Aug 5, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Engineering Manager on behalf of EPC DPW Development Services - Engineering
- Aug 5, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Lori Seago on behalf of County Attorney - Development Review
- Aug 5, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Erika Keech on behalf of County Attorney - Development Review
- Aug 5, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by April Willie on behalf of County Attorney - Development Review
- Aug 5, 2026Submission Triaged
- Aug 4, 2026Submission received from Applicant
- Jun 25, 2026Submission request sent to Applicant
- Jun 25, 2026Project reopened for Review Comments
- Mar 12, 2026Project Approved: 3/12/2026
- Mar 12, 2026Project Closed
- Mar 12, 2026Request for Review Comments returned by County Attorney - Development Review
- Mar 12, 2026Request for Review Comments returned by EPC DPW Development Services - Engineering
- Mar 10, 2026Request for Review Comments returned by EPC DPW Stormwater
- Mar 10, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Zachary Jannusch on behalf of EPC DPW Stormwater
- Mar 10, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Glenn Reese on behalf of EPC DPW Stormwater
- Mar 10, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Mikayla Hartford on behalf of EPC DPW Stormwater
- Mar 10, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Christina Prete on behalf of EPC DPW Stormwater
- Mar 10, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Gilbert LaForce on behalf of EPC DPW Development Services - Engineering
- Mar 10, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Engineering Manager on behalf of EPC DPW Development Services - Engineering
- Mar 10, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Lori Seago on behalf of County Attorney - Development Review
- Mar 10, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Erika Keech on behalf of County Attorney - Development Review
- Mar 10, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by April Willie on behalf of County Attorney - Development Review
- Mar 10, 2026Submission Triaged
- Mar 9, 2026Submission received from Applicant
- Mar 9, 2026Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
- Mar 9, 2026Submission request sent to Applicant
- Mar 9, 2026Submission Triaged
- Mar 9, 2026Submission received from Applicant
- Mar 5, 2026Request for Review Comments returned by County Attorney - Development Review
- Mar 4, 2026Submission request sent to Applicant
- Mar 4, 2026Request for Review Comments returned by EPC DPW Stormwater
- Mar 4, 2026Request for Review Comments email resent for Project Beacon Lite Road Stockpile for review by Christina Prete on behalf of EPC DPW Stormwater
- Mar 4, 2026Request for Review Comments returned by EPC DPW Stormwater
- Mar 4, 2026Request for Review Comments returned by EPC DPW Development Services - Engineering
- Feb 26, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Lori Seago on behalf of County Attorney - Development Review
- Feb 26, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Erika Keech on behalf of County Attorney - Development Review
- Feb 26, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by April Willie on behalf of County Attorney - Development Review
- Feb 25, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
- Feb 25, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
- Feb 25, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Kimberly Blanchard on behalf of Colorado Department of Transportation - Pueblo Office
- Feb 25, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
- Feb 25, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Mikayla Hartford on behalf of EPC DPW Stormwater
- Feb 25, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Zachary Jannusch on behalf of EPC DPW Stormwater
- Feb 25, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Glenn Reese on behalf of EPC DPW Stormwater
- Feb 25, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Christina Prete on behalf of EPC DPW Stormwater
- Feb 25, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Gilbert LaForce on behalf of EPC DPW Development Services - Engineering
- Feb 25, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Engineering Manager on behalf of EPC DPW Development Services - Engineering
- Feb 25, 2026Submission request sent to Applicant
- Feb 25, 2026Submission request sent to Applicant
- Feb 25, 2026Submission Triaged
- Feb 25, 2026Submission received from Applicant
- Feb 19, 2026Request for Review Comments returned by Black Hills Energy-Aquila
- Feb 6, 2026Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
- Feb 5, 2026Submission request sent to Applicant
- Feb 5, 2026Request for Review Comments returned by EPC DPW Stormwater
- Feb 4, 2026Request for Review Comments returned by EPC DPW Development Services - Engineering
- Jan 29, 2026Request for Review Comments returned by Mountain View Electric Association, Inc.
- Jan 28, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Daniel Delgado on behalf of US Army Corps of Engineers
- Jan 28, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
- Jan 28, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
- Jan 28, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Kimberly Blanchard on behalf of Colorado Department of Transportation - Pueblo Office
- Jan 28, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
- Jan 28, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Michael Wicklund on behalf of Monument Sanitation
- Jan 28, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by General Email on behalf of Mountain View Electric Association, Inc.
- Jan 28, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Trish Riber on behalf of Black Hills Energy-Aquila
- Jan 28, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Marcus Henderson on behalf of Black Hills Energy-Aquila
- Jan 28, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Bob Swatek on behalf of Black Hills Energy-Aquila
- Jan 28, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Adam Magoon on behalf of Black Hills Energy-Aquila
- Jan 28, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by on behalf of EPC Public Works, County Engineer
- Jan 28, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by on behalf of EPC Public Works, County Engineer
- Jan 28, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Zachary Jannusch on behalf of EPC DPW Stormwater
- Jan 28, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Mikayla Hartford on behalf of EPC DPW Stormwater
- Jan 28, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Glenn Reese on behalf of EPC DPW Stormwater
- Jan 28, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Christina Prete on behalf of EPC DPW Stormwater
- Jan 28, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Gilbert LaForce on behalf of EPC DPW Development Services - Engineering
- Jan 28, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Engineering Manager on behalf of EPC DPW Development Services - Engineering
- Jan 28, 2026Submission Triaged
- Jan 27, 2026Submission received from Applicant
- Jan 20, 2026Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
- Jan 12, 2026Submission request sent to Applicant
- Jan 12, 2026Request for Review Comments returned by PCD Project Manager
- Jan 12, 2026Request for Review Comments email resent for Project Beacon Lite Road Stockpile for review by Justin Kilgore on behalf of PCD Project Manager
- Jan 12, 2026Request for Review Comments returned by EPC DPW Stormwater
- Jan 12, 2026Request for Review Comments returned by PCD Project Manager
- Jan 12, 2026Request for Review Comments returned by EPC DPW Development Services - Engineering
- Jan 5, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Daniel Delgado on behalf of US Army Corps of Engineers
- Jan 5, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
- Jan 5, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
- Jan 5, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Kimberly Blanchard on behalf of Colorado Department of Transportation - Pueblo Office
- Jan 5, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
- Jan 5, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Michael Wicklund on behalf of Monument Sanitation
- Jan 5, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by General Email on behalf of Mountain View Electric Association, Inc.
- Jan 5, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Trish Riber on behalf of Black Hills Energy-Aquila
- Jan 5, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Marcus Henderson on behalf of Black Hills Energy-Aquila
- Jan 5, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Bob Swatek on behalf of Black Hills Energy-Aquila
- Jan 5, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Adam Magoon on behalf of Black Hills Energy-Aquila
- Jan 5, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by on behalf of EPC Public Works, County Engineer
- Jan 5, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by on behalf of EPC Public Works, County Engineer
- Jan 5, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Zachary Jannusch on behalf of EPC DPW Stormwater
- Jan 5, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Mikayla Hartford on behalf of EPC DPW Stormwater
- Jan 5, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Glenn Reese on behalf of EPC DPW Stormwater
- Jan 5, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Christina Prete on behalf of EPC DPW Stormwater
- Jan 5, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Gilbert LaForce on behalf of EPC DPW Development Services - Engineering
- Jan 5, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Engineering Manager on behalf of EPC DPW Development Services - Engineering
- Jan 5, 2026Request for Review Comments email sent for Project Beacon Lite Road Stockpile for review by Justin Kilgore on behalf of PCD Project Manager
- Jan 5, 2026Fees paid: 1/5/2026 (Receipt: 1011502)
- Jan 5, 2026Project Manager Assigned: Stormwater Glenn Reese
- Jan 5, 2026File # Assigned: CDR261
- Jan 5, 2026Payment Request sent: 1/5/2026
- Jan 5, 2026Submission Triaged
- Jan 3, 2026Submission received from Applicant
- Dec 15, 2025Submission request sent to Applicant
- Dec 15, 2025Project Created
- Dec 15, 2025Project Manager Assigned: Stormwater Christina Prete