Canyon Creek Ranch
Subdivision for 3 lots and a tract
- Location
- 11550 PARALLAX HTS, 80908
- Jurisdiction
- El Paso County
- Applicant
- William Guman & Associates, Ltd. Bill Guman
- Land owner (assessor)
- CAWLFIELD GREGG A & CAWLFIELD JANNETTE E
- County project manager
- Ryan Howser
- Filed
- Nov 5, 2020
- Parcel
- 6214000112
- Map
-
Parcel boundaries: Colorado public parcel data · Basemap © OpenStreetMap contributors
- Area map
- See all Tri-Lakes projects on the map
- Source record
- El Paso County EDARP file
Documents (54)
Adjacent Property Owner Notification (Includes letter and certified mailing receipts)reviewSep 23, 2022
Agency review comments (119)
Black Forest Fire Protection Districtreview 5Sep 10, 2026
Black Forest Fire Rescue has reviewed the current Canyon Creek Ranch Final Plat and Fire Protection Report. The subdivision consists of three residential lots on approximately 24.6325 acres, with one existing residence on Lot 1 and two proposed residences on Lots 2 and 3. Lots 2 and 3 are proposed to be accessed from Creek View Road.
The submitted Fire Protection Report currently proposes a centralized cistern based on the El Paso County Land Development Code Section 6.3.3 calculation of approximately 16,390 gallons. **BFFR does not accept 16,390 gallons as the required final fire-protection water supply for this development.**
Per El Paso County Land Development Code Section 6.3.3, the required cistern capacity must satisfy the applicable fire-protection water-supply requirements and is subject to review by the Fire Authority. In accordance with BFFR rural water-supply requirements, the subdivision shall provide a **minimum 30,000 gallons of usable fire-protection water**, or a greater quantity where required by the applicable fire-flow/NFPA calculation.
The 30,000-gallon minimum also corresponds to a rural firefighting water supply of **250 gpm for two hours**, providing a usable and creditable water source for fire department operations and supporting ISO water-supply considerations.
The revised plans shall show the proposed **30,000-gallon minimum cistern**, fire department connection, dedicated fire-access easement, and apparatus turnaround. In accordance with LDC Section 6.3.3, the dedicated turnaround shall be located no more than **50 feet from the cistern**, and the standpipe/fire department connection shall be located within **8 feet of the nearest usable portion of the approved fire apparatus access road or easement**, unless otherwise approved by BFFR. The current report already recognizes these LDC dimensional requirements.
The cistern location and turnaround shall be designed so that BFFR engines and tenders can approach, position at the water-supply connection, turn around, and exit without excessive backing. Access shall be all-weather and capable of supporting fire apparatus. Final location shall be coordinated with BFFR prior to approval of the civil plans.
The cistern/dry-hydrant system shall comply with current **BFFR water-supply and cistern specifications**, including the required fire department connection, protection from vehicle impact, identification/signage, accessibility, and acceptance testing.
EPC Parks Departmentreview 5Sep 3, 2026
El Paso County Parks Staff has reviewed this project and has provided comments attached in the associated packet.
Thank you.
Ashlyn Mathy
Parks Planner
Park Planning Division
El Paso County Parks Department
Office 719.520.6978
Mountain View Electric Association, Inc.review 5Aug 27, 2026
See attached comment letter.
County Attorney - Development Reviewreview 5Aug 26, 2026
1. Attached is the County's ROW License Agreement template. Please use this for the improvements to be built in the public easement.
2. Some comments on the covenants have not been addressed. There is nothing on the Plat labeled "Shared Access Driveway." The covenants should thus not refer to it. Please amend either the plat to add that label or the covenants to use the terminology found on the plat.
Lori Seago
Sr. County Attorney
loriseago@elpasoco.com
EPC Stormwater Reviewreview 5Aug 26, 2026
Review 5: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- ESQCP form
EPC DPW Stormwater comments have been resolved on the following document(s):
- FAE
- GEC Plan
- GEC Checklist
- SWMP
Reviewed by:
Zachary Jannusch
Associate Engineer - Stormwater
719.500.3170
ZacharyJannusch@elpasoco.com
PCD Engineering Divisionreview 5Aug 25, 2026
Review 5 comments of the following documents will be uploaded by stormwater engineer:
-Final Plat
-Drainage Report
reviewed by:
Daniel Torres
danieltorres@elpasoco.com
PCD Project Managerreview 5Aug 25, 2026
Review 5: PCD Planning Division comments have been provided (in green) on the following uploaded documents:
- Final Plat
- Letter of Intent
Documents will be uploaded by Engineering.
Pikes Peak Regional Building Departmentreview 5Aug 24, 2026
Two new addresses, plat fee will be $20.00. Fee will need to be paid when we review the physical mylar. No further comment.
Becky Allen
PPRBD - Enumerations
beckya@pprbd.org
911 Authority - El Paso/Teller Countyreview 5Aug 13, 2026
No action for E911 on this submittal.
Thank you.
Justin
PCD Engineering Divisionreview 4Feb 12, 2026
Review 4 comments of the following documents will be uploaded:
-Final Plat
-GEC plan: see comments by Stormwater
-Drainage Report
-CD's: Please change the title of the plans to Driveway Improvement plans as this is not a street/road.
reviewed by:
Daniel Torres
danieltorres@elpasoco.com
PCD Engineering Divisionreview 4Feb 12, 2026
Previous Review 3 final plat comments
PCD Engineering Divisionreview 4Feb 12, 2026
Final Plat comments: please also address previous review 3 comments.
County Attorney - Development Reviewreview 4Feb 11, 2026
1. A ROW License Agreement is required for improvements to be built in the public easement lying between the eastern boundary of this subdivision and Creek View. Please complete and provide one for review.
2. Additional requested edits to the covenants are attached.
3. All other Requirements of the Water Supply Review have been met.
Lori Seago
Sr. County Attorney
loriseago@elpasoco.com
EPC Stormwater Reviewreview 4Feb 11, 2026
Review 3: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- FAE.............................................(To be uploaded by EPC PM or DS Engineer)
- GEC Plan....................................(To be uploaded by EPC PM or DS Engineer)
- GEC Checklist
- SWMP
EPC DPW Stormwater comments have been resolved on the following document(s):
- Drainage Report
Due to changes to the proposal between submittals, please provide the following document upon resubmittal (the planner will need to send an upload request):
- ESQCP form (See uploaded redlines on V3 form)
Reviewed by:
Mikayla Hartford, P.E.
Stormwater Engineer
719.339.5053
MikaylaHartford@elpasoco.com
PCD Project Managerreview 4Feb 10, 2026
Review 4: PCD Planning Division comments have been provided (in green) on the following uploaded documents:
- Final Plat (it appears the building envelopes have now been removed from the plat, which is the only noted change to the plat. If building envelopes are not proposed, then disregard the two V3 comments regarding the envelopes. All other comments from review 3 have not been addressed and remain.
- OWTS Report (attached)
Pikes Peak Regional Building Departmentreview 4Feb 9, 2026
1. Add Parallax Heights to the plat where the street is shown.
2. Add addresses where the marker (####) is shown. Lot 2 is 4225 Creek View Road and Lot 3 is 4265 Creek View Road. Also add the existing address to Lot 1 where the marker is shown.
3. Enumerations will not sign off on the mylar until all addresses are added to the plat.
Previous general Final Plat comments still apply.
Becky Allen
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-799-2707 W: pprbd.org E: beckya@pprbd.org
911 Authority - El Paso/Teller Countyreview 4Jan 29, 2026
Comments for E911 as follows:
The access easement entering this development from the Southwest for Lot 1 is a named street (Parallax Hts). This should be depicted on the plan drawings.
Thank you.
Justin
Black Forest Fire Protection Districtreview 4Jan 28, 2026
Black Forest Fire Rescue has reviewed the Fire Protection Report for the Canyon Creek Ranch Minor Subdivision (William Guman & Associates, November 21, 2025). The proposed three-lot RR-5 subdivision is acceptable from a fire protection standpoint subject to the following conditions.
The private entry road serving multiple residences shall meet applicable fire apparatus access requirements, including minimum unobstructed width, vertical clearance, grade, and turning radius, as approved by Black Forest Fire Rescue. Final driveway geometry, grades, and turnaround design shall be reviewed and approved with construction drawings. Any portions of the access road exceeding standard grade limits require approval by the Fire Authority Having Jurisdiction.
A centralized fire cistern is required and shall be provided in accordance with El Paso County Land Development Code Section 6.3.3 and IFC Section 507. The cistern shall meet or exceed the required storage volume, be accessible under all weather conditions, include an approved turnaround within 50 feet, and provide a fire department connection/standpipe within 8 feet of the approved access. Final cistern size, location, construction standard (NFPA 22), and connection details are subject to BFFR approval.
Installation of NFPA 13D residential fire sprinkler systems is strongly recommended and may be required as a condition of access approval depending on final driveway grades, lengths, and operational considerations.
Given the site’s location within a wildfire risk area, future structures, landscaping, and site improvements shall comply with applicable provisions of the Colorado Wildfire Resiliency Code (WRC) as adopted, including ignition-resistant construction, defensible space, and vegetation management requirements.
Black Forest Land Use Committeereview 3Jul 1, 2025
The Black Forest Land Use Committee recommends approval of this proposal.
County Attorney - Waterreview 3Jun 5, 2025
Please see attached Water Supply Review and Recommendations.
EPC Fire and Wildfire Program Managerreview 3Jun 4, 2025
Fire Comments added to Fire Protection Report, Final Plat and Wildland Fire and Hazard Mitigation Plan.
PCD Project Managerreview 3Jun 3, 2025
EPC DPW Engineering previous comments regarding Construction Drawings are still applicable. Please review comments and respond accordingly.
PCD Project Managerreview 3Jun 3, 2025
Review 3: PCD Planning Division comments have been provided (in green) on the following uploaded documents:
- Final Plat
- Letter of Intent
- OWTS Report
County Attorney - Development Reviewreview 3Jun 3, 2025
1. Please address the comments on the covenants from Feb. 2023.
2. The LOI now states that all lots are taking access off Creek View. Satellite images show the existing house appears to be taking access from Mountain View Dr. to the south. Will this driveway / access point be closed?
3. The plat does not appear to depict an access easement from Lot 1 to Creek View.
4. If the improvements from Creek View to the property line are not to be a road built to County standards, then a ROW license agreement is required for any improvements installed in that public ROW.
EPC Stormwater Reviewreview 3Jun 3, 2025
Review 2: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- Drainage Report
- FAE
- GEC Plan
- GEC Checklist
- SWMP
EPC DPW Stormwater comments have been resolved on the following document(s):
- ESQCP
- Final Plat
- PBMP Applicability Form
- SWMP Checklist
Reviewed by:
Mikayla Hartford, P.E.
Stormwater Engineer
719.339.5053
MikaylaHartford@elpasoco.com
PCD Engineering Divisionreview 3Jun 3, 2025
Review 3 comments will be uploaded by the project manager for the following documents:
-CDs
-Drainage report
Reviewed By:
Lupe Packman
lupepackman@elpasoco.com
Pikes Peak Regional Building Departmentreview 3May 30, 2025
1. Update the spelling of Timberlane Court. Timberlane is one word
2. Add Parallax Heights to the plat where the street is shown.
3. Add addresses where the marker (####) is shown. Lot 2 is 4225 Creek View Road and Lot 3 is 4265 Creek View Road. Also add the existing address to Lot 1 where the marker is shown.
4. Enumerations will not sign off on the mylar until all addresses are added to the plat.
Previous general Final Plat comments still apply.
Becky Allen
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-799-2707 W: pprbd.org E: beckya@pprbd.org
911 Authority - El Paso/Teller Countyreview 3May 22, 2025
Comments for E911 as follows:
Timberlane Ct is misspelled as Timber Lane Ct on the submitted plan drawings. Please correct to Timberlane Ct with no space.
The access entering this development from the Southwest is a named street (Parallax Hts). This should be depicted on the plan drawings.
Thank you.
Justin
County Attorney - Waterreview 1Feb 7, 2025
1. The WSIS uploaded on 1/10/25 is not consistent with the estimated demand described in the Aug. 2022 Water Resource Report.
2. Please provide deeds or other evidence showing that the water rights decreed in the name of David Reed are owned by Gregg & Jennette Cawlfield.
County Attorney - Development Reviewreview 2Jan 31, 2025
Lot access is still unclear on the plat and in the letter of intent. Once the proposed lot access has been clearly depicted, I will again review the maintenance provisions in the covenants. Please see previous comments on covenants from Feb. 2023.
PCD Project Managerreview 2Jan 31, 2025
Review 2: PCD Planning Division comments have been provided (in green) on the following uploaded documents:
- Final Plat (includes Engineering comments)
- Letter of Intent
- Water Supply Information Summary (WSIS)
PCD Engineering Divisionreview 2Jan 31, 2025
Review 2 comments for the following documents will be uploaded by the project manager.
-FAE: In the next submittal include a filled out 2025 FAE form
-Soils Report
-Final Plat
-Drainage Report
-GEC Plan
Reviewed By:
Lupe Packman
lupepackman@elpasoco.com
EPC Stormwater Reviewreview 2Jan 30, 2025
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document(s):
- Drainage Report......(to be uploaded with Development Services comments)
- ESQCP
- FAE........................(to be uploaded with Development Services comments)
- Final Plat...............(to be uploaded with Development Services comments)
- GEC Plan...............(to be uploaded with Development Services comments)
- GEC Checklist
- PBMP Applicability Form
- SWMP
- SWMP Checklist
Reviewed by:
Mikayla Hartford
Stormwater Engineer I
719.339.5053
MikaylaHartford@elpasoco.com
RBD Floodplainreview 2Jan 30, 2025
no further comment
Pikes Peak Regional Building Departmentreview 2Jan 27, 2025
How will Lot 1 be accessed? It appears this new version of the plat has added a new lot where there was a tract previously. Please clarify, so a new addressing plan can be provided.
Once addressing has been provided, the addresses will need to be added to the plat.
Standard Final Plat comments still apply:
1. Enumerations will review the pre-plat (mylar) prior to plat for address placement, street names, and title block.
2. A $10.00 per lot and tract platting fee will be due at the time of the review of the pre-plat, (two addresses per lot and tract). If an address is not needed on a tract then no fee applies. Check should be made out to PIKES PEAK REGIONAL BUILDING DEPARTMENT or PPRBD. Paid directly to the Enumerations Department. As of December 5th 2023, the fee for all credit/debit cards has changed from the flat 2.95% fee to the following: Over the phone Credit/Debit Card payments will be 2.3% and In-Person Debit Card payments will be 1.5% (in-person only).
3. Pre-plat reviews can be reviewed via “pdf” or in-person. The pre-plat will be stamped by Enumerations for accuracy and returned to the applicant and the planner. All payments to be mailed to RBD via a check or credit card payment over the phone. Plats should not be recorded prior to Enumerations stamping the pre-plat and receiving payment of plat fees. If any pre-plat changes occur, even if changes do not apply to Enumerations, we still need to re-stamp the pre-plat. The Enumerations stamped pre-plat copy should match the recorded document minus a few signatures. If you would like an in-person review, please make an appointment on our website, https://www.pprbd.org/Home/BookAppt
4. A copy of the final recorded plat is required prior to plan submittal for RESIDENTIAL. Please email the Enumerations staff member that reviewed your project. BeckyA@pprbd.org
Becky Allen
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-799-2707 W: pprbd.org E: beckya@pprbd.org
911 Authority - El Paso/Teller Countyreview 2Jan 13, 2025
Comments for E911 as follows:
Timberlane Ct is misspelled as Timber Lane Ct on the submitted plan drawings. Please correct to Timberlane Ct with no space.
No other action for E911 on this submittal.
Thank you
Justin
Black Forest Fire Protection Districtreview 1Mar 2, 2023
Fire Protection Report is not only extremely inaccurate but also gives the reader the impression that it was completed by the Black Forest Fire Rescue Protection District. I would argue that this is forgery or fraud. As of January 1st, 2023 BFFR does not provide Fire Protection reports and this is dated February 2nd, 2023.
PCD Project Managerreview 1Feb 28, 2023
Planning and Engineering comments - soils & geology report
PCD Project Managerreview 1Feb 28, 2023
Planning comments - fire protection report
PCD Project Managerreview 1Feb 28, 2023
Planning and Engineering comments - final plat
PCD Project Managerreview 1Feb 28, 2023
Drainage report markup summary attached
PCD Project Managerreview 1Feb 28, 2023
Engineering comments - drainage report
PCD Engineering Divisionreview 1Feb 28, 2023
Review 1 comments will be uploaded by the project manager for the following documents:
-Drainage Report
-Soils and Geology Report
-Final Plat
Submit a grading and erosion control plan or a set of construction drawings for the grading that is expected to be done for the driveways and channel improvements.
Submit an ESQCP permit and associated SW documents in the next submittal since the 500 CY of fill will most likely be triggered with the construction of driveways.
Submit a FAE form for the common development improvements. Form can be found here: https://planningdevelopment.elpasoco.com/planning-development-forms/#1516906638016-61792baf-6cf4.
Due to the nature of the comments expect new/additional comments on the resubmittal.
Reviewed By:
Lupe Packman
Lupepackman@elpasoco.com
Black Forest Land Use Committeereview 1Feb 25, 2023
The Black Forest Land Use Committee has reviewed this application and recommends approval.
PCD Project Managerreview 1Feb 23, 2023
Informational comment: please note that El Paso County Planning and Community Development cannot and will not accept collateral or escrow (use whichever necessary) payment until plat recording (for plats), escrow agreement is signed and recorded (for escrow), financial assurance form is signed and approved (for FAE no plat). Any collateral or escrow payments that are received prior to the appropriate conditions being met will not be accepted and will be returned until such time payment is deemed as appropriate. Please coordinate with PCD Project Manager prior to making any collateral or escrow payments.
PCD Project Managerreview 1Feb 23, 2023
Please provide a natural features report. There are significant natural features on the property. Natural features report shall also include riparian corridor analysis.
PCD Project Managerreview 1Feb 23, 2023
The document you submitted in place of the water supply summary is another copy of the court decree. Please resubmit with the water supply summary. See attached.
PCD Project Managerreview 1Feb 23, 2023
PCD Planning understands the difficulties the applicant has had in acquiring the appropriate clearance letters from US Fish & Wildlife and Army Corps of Engineers; however, you must provide these clearance letters prior to approval of the plat.
Colorado Geological Surveyreview 1Feb 23, 2023
With this referral, we received the final plat (Land Development Consultants, Inc., 12/20/2020), letter of intent (Land Development Consultants, Inc., 5/20/2022), soils and geology study (Rocky Mountain Group (RMG), 6/24/2022) that includes the soils reports for Lots 2 and 3 (Geoquest, LLC, 10/25/2021 and 10/20/2021), and other documents. RMG’s characterization of the geology and geological hazards within the site is valid.
Provided RMG’s and Geoquest’s recommendations are adhered to, and open-hole observations are performed as recommended by Geoquest, CGS has no objection to approval of the minor subdivision. We offer the following comments and recommendations.
1. A note should be added to the final plat referencing the soils and geology study and soil reports for lots 2 and 3.
2. Geoquest indicates that vertical slab movement of up to three inches should be expected after the removal of expansive soils within lot 2. Geoquest anticipates less potential vertical movement for lot 3. The applicant, owner, and future owners should be aware of the potential for movement at these sites.
3. RMG denotes the proposed build sites for lots 2 and 3 in topographic flat areas, setback from steep drainages and the 100-year flood boundary of Kettle Creek associated with slope instability, flooding, and erosion hazards. CGS recommends that erosional setbacks associated with Kettle Creek and the steep drainages be evaluated and, if necessary, included in the drainage plans. Erosion control measures should be implemented in areas of surface runoff.
Submitted 2/23/2023 by Amy Crandall, Engineering Geologist, Colorado Geological Survey (303-384-2632 or acrandall@mines.edu)
Pikes Peak Regional Building Departmentreview 1Feb 23, 2023
1. Please add the street name Parallax Heights to the final plat in its location.
2. Lot’s 2 and 3 appear to be accessing from Creek View Road. Please place the following addresses on the plat in the location of the markers, Lot 2 is 4225 Creek View Road and Lot 3 is 4265 Creek View Road.
3. Add the existing address in the location of the address markers for Lot 1 (11550).
Standard final Plat comments apply (fee for this plat will be $20.00 for the two new addresses)
1. Enumerations will review the mylar prior to plat for address placement, street names, and title block.
2. A $10.00 per lot and tract platting fee will be due at the time of the review of the mylar, (two addresses per lot and tract). If an address is not needed on a tract then no fee applies. Check should be made out to PIKES PEAK REGIONAL BUILDING DEPARTMENT or PPRBD. Paid directly to the Enumerations Department. As of September 28th, 2022, an additional over the phone transaction fee of 2.95% of the total transaction will apply for any credit card payment.
3. A copy of the final recorded plat is required prior to plan submittal for RESIDENTIAL. BeckyA@pprbd.org (Please email the Enumerations staff that reviewed your project).
4. The mylar will need to be physically stamped by Enumerations for accuracy and returned to the applicant. To request an in-person review, please make an appointment on our website, https://www.pprbd.org/Home/BookAppt All payments to be mailed to RBD via a check or credit card payment over the phone. Plats should not be recorded prior to Enumerations receiving payment.
Becky Allen
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-799-2707 W: pprbd.org E: beckya@pprbd.org
County Attorney - Development Reviewreview 1Feb 22, 2023
1. Comments on covenants related to access are attached.
2. A right-of-way license agreement may be needed to build improvements in the roadway easement coming off Creek View. Please discuss with EPC Project Manager.
Parks Advisory Boardreview 1Feb 16, 2023
El Paso County Community Services / Parks Final Administrative Comments - Please See Attached Documents (No PAB Endorsement Necessary for Minor Subdivisions)
EPC Parks Departmentreview 1Feb 16, 2023
El Paso County Community Services / Parks Final Administrative Comments - Please See Attached Documents (No PAB Endorsement Necessary for Minor Subdivisions)
Mountain View Electric Association, Inc.review 1Feb 13, 2023
See attached comments
Academy SD 20 Building Fundreview 1Feb 13, 2023
Academy School District 20 is receipt of File# MS2213 for approval of the Canyon Creek Ranch Minor Subdivision.
The District is requesting fees in lieu of land dedication per the existing El Paso County Code for all new residential units created within this subdivision.
If you need additional information, please contact me.
Don Smith
Planning Consultant
Colorado State Forest Servicereview 1Feb 10, 2023
The Colorado State Forest Service recommends that all forested acres be mitigated to reduce the risk of wildfire and that defensible space be created for each dwelling using the standards in the CSFS "Home Ignition Zone Guide" (formerly known as "Quick Guide FIRE 2012-1: Protecting Your Home From Wildfire") located on the Colorado State Forest Service website.
https://csfs.colostate.edu/media/sites/22/2021/04/2021_CSFS_HIZGuide_Web.pdf
In addition, we recommend that all wildfire mitigation be completed before or during dwelling construction.
*we recommend that the applicant replace the document "Creating Wildfire-Defensible Zones no. 6.302" with the updated HIZ Guide referenced above and attached. 6.302 is no longer supported by CSFS
911 Authority - El Paso/Teller Countyreview 1Feb 3, 2023
No new streetnames requested on this submittal.
No action for E911.
Thank you.
Justin.
Land ownership timeline
- Mar 22, 2021Parcel 6214000112 acquired by CAWLFIELD GREGG A & CAWLFIELD JANNETTE E for $1,250,000 (assessor record)
Timeline
- Sep 10, 2026Request for Review Comments returned by Black Forest Fire Protection District
- Sep 3, 2026Request for Review Comments returned by EPC Parks Department
- Aug 27, 2026Request for Review Comments returned by Mountain View Electric Association, Inc.
- Aug 27, 2026Submission request sent to Applicant
- Aug 26, 2026Request for Review Comments returned by County Attorney - Development Review
- Aug 26, 2026Request for Review Comments email resent for Project Canyon Creek Ranch for review by General Email on behalf of Mountain View Electric Association, Inc.
- Aug 26, 2026Submission request sent to Applicant
- Aug 26, 2026Request for Review Comments returned by EPC Stormwater Review
- Aug 25, 2026Request for Review Comments returned by PCD Engineering Division
- Aug 25, 2026Request for Review Comments returned by PCD Project Manager
- Aug 25, 2026Request for Review Comments returned by Mountain View Electric Association, Inc.
- Aug 25, 2026Request for Review Comments email resent for Project Canyon Creek Ranch for review by Justin Kilgore on behalf of PCD Project Manager
- Aug 25, 2026Request for Review Comments email sent for Project Canyon Creek Ranch for review by Tony Cerrone on behalf of Black Forest Fire Protection District
- Aug 25, 2026Request for Review Comments email sent for Project Canyon Creek Ranch for review by Rachel Dunn on behalf of Black Forest Fire Protection District
- Aug 25, 2026Request for Review Comments email sent for Project Canyon Creek Ranch for review by Michael Alvarado on behalf of Black Forest Fire Protection District
- Aug 25, 2026Request for Review Comments email sent for Project Canyon Creek Ranch for review by on behalf of Black Forest Fire Protection District
- Aug 25, 2026Request for Review Comments email sent for Project Canyon Creek Ranch for review by Cody Poole on behalf of Black Forest Fire Protection District
- Aug 25, 2026Request for Review Comments email sent for Project Canyon Creek Ranch for review by Fielding Lucas on behalf of Black Forest Fire Protection District
- Aug 25, 2026Request for Review Comments email sent for Project Canyon Creek Ranch for review by Chad Herdt on behalf of Black Forest Fire Protection District
- Aug 25, 2026Request for Review Comments sent for Project Canyon Creek Ranch for review by on behalf of EPC Parks Department
- Aug 25, 2026Request for Review Comments returned by PCD Project Manager
- Aug 24, 2026Request for Review Comments returned by Pikes Peak Regional Building Department
- Aug 13, 2026Request for Review Comments returned by 911 Authority - El Paso/Teller County
- Aug 11, 2026Request for Review Comments email sent for Project Canyon Creek Ranch for review by General Email on behalf of Mountain View Electric Association, Inc.
- Aug 11, 2026Request for Review Comments email sent for Project Canyon Creek Ranch for review by on behalf of Pikes Peak Regional Building Department
- Aug 11, 2026Request for Review Comments email sent for Project Canyon Creek Ranch for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
- Aug 11, 2026Request for Review Comments email sent for Project Canyon Creek Ranch for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
- Aug 11, 2026Request for Review Comments email sent for Project Canyon Creek Ranch for review by Zachary Jannusch on behalf of EPC Stormwater Review
- Aug 11, 2026Request for Review Comments email sent for Project Canyon Creek Ranch for review by Mikayla Hartford on behalf of EPC Stormwater Review
- Aug 11, 2026Request for Review Comments email sent for Project Canyon Creek Ranch for review by Glenn Reese on behalf of EPC Stormwater Review
- Aug 11, 2026Request for Review Comments email sent for Project Canyon Creek Ranch for review by Erica Rylander on behalf of EPC Stormwater Review
- Aug 11, 2026Request for Review Comments email sent for Project Canyon Creek Ranch for review by Christina Prete on behalf of EPC Stormwater Review
- Aug 11, 2026Request for Review Comments email sent for Project Canyon Creek Ranch for review by Lori Seago on behalf of County Attorney - Development Review
- Aug 11, 2026Request for Review Comments email sent for Project Canyon Creek Ranch for review by Erika Keech on behalf of County Attorney - Development Review
- Aug 11, 2026Request for Review Comments email sent for Project Canyon Creek Ranch for review by April Willie on behalf of County Attorney - Development Review
- Aug 11, 2026Request for Review Comments email sent for Project Canyon Creek Ranch for review by Justin Kilgore on behalf of PCD Project Manager
- Aug 11, 2026Request for Review Comments email sent for Project Canyon Creek Ranch for review by Gilbert LaForce on behalf of PCD Engineering Division
- Aug 11, 2026Request for Review Comments email sent for Project Canyon Creek Ranch for review by Engineering Manager on behalf of PCD Engineering Division
- Aug 11, 2026Submission Triaged
- Aug 6, 2026Submission received from Applicant
- Jul 14, 2026Submission request sent to Applicant
- Jul 14, 2026Submission Triaged
- Jul 13, 2026Submission received from Applicant
- Jun 26, 2026Submission request sent to Applicant
- Feb 12, 2026Submission request sent to Applicant
- Feb 12, 2026Request for Review Comments returned by PCD Engineering Division
- Feb 12, 2026Request for Review Comments email resent for Project Canyon Creek Ranch for review by Engineering Manager on behalf of PCD Engineering Division
- Feb 11, 2026Request for Review Comments returned by PCD Engineering Division
- Feb 11, 2026Request for Review Comments returned by EPC Stormwater Review
- Feb 11, 2026Request for Review Comments returned by County Attorney - Development Review
- Feb 10, 2026Request for Review Comments returned by PCD Project Manager
- Feb 9, 2026Request for Review Comments returned by Pikes Peak Regional Building Department
- Jan 29, 2026Request for Review Comments returned by 911 Authority - El Paso/Teller County
- Jan 28, 2026Request for Review Comments returned by Black Forest Fire Protection District
- Jan 28, 2026Request for Review Comments email sent for Project Canyon Creek Ranch for review by Rachel Dunn on behalf of Black Forest Fire Protection District
- Jan 28, 2026Request for Review Comments email sent for Project Canyon Creek Ranch for review by Michael Alvarado on behalf of Black Forest Fire Protection District
- Jan 28, 2026Request for Review Comments email sent for Project Canyon Creek Ranch for review by on behalf of Black Forest Fire Protection District
- Jan 28, 2026Request for Review Comments email sent for Project Canyon Creek Ranch for review by Fielding Lucas on behalf of Black Forest Fire Protection District
- Jan 28, 2026Request for Review Comments email sent for Project Canyon Creek Ranch for review by Chad Herdt on behalf of Black Forest Fire Protection District
- Jan 28, 2026Request for Review Comments email sent for Project Canyon Creek Ranch for review by on behalf of Pikes Peak Regional Building Department
- Jan 28, 2026Request for Review Comments email sent for Project Canyon Creek Ranch for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
- Jan 28, 2026Request for Review Comments email sent for Project Canyon Creek Ranch for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
- Jan 28, 2026Request for Review Comments email sent for Project Canyon Creek Ranch for review by Zachary Jannusch on behalf of EPC Stormwater Review
- Jan 28, 2026Request for Review Comments email sent for Project Canyon Creek Ranch for review by Mikayla Hartford on behalf of EPC Stormwater Review
- Jan 28, 2026Request for Review Comments email sent for Project Canyon Creek Ranch for review by Glenn Reese on behalf of EPC Stormwater Review
- Jan 28, 2026Request for Review Comments email sent for Project Canyon Creek Ranch for review by Christina Prete on behalf of EPC Stormwater Review
- Jan 28, 2026Request for Review Comments email sent for Project Canyon Creek Ranch for review by Lori Seago on behalf of County Attorney - Development Review
- Jan 28, 2026Request for Review Comments email sent for Project Canyon Creek Ranch for review by Erika Keech on behalf of County Attorney - Development Review
- Jan 28, 2026Request for Review Comments email sent for Project Canyon Creek Ranch for review by April Willie on behalf of County Attorney - Development Review
- Jan 28, 2026Request for Review Comments email sent for Project Canyon Creek Ranch for review by Justin Kilgore on behalf of PCD Project Manager
- Jan 28, 2026Request for Review Comments email sent for Project Canyon Creek Ranch for review by Gilbert LaForce on behalf of PCD Engineering Division
- Jan 28, 2026Request for Review Comments email sent for Project Canyon Creek Ranch for review by Engineering Manager on behalf of PCD Engineering Division
- Jan 28, 2026Submission Triaged
- Jan 28, 2026Submission received from Applicant
- Jul 1, 2025Request for Review Comments returned by Black Forest Land Use Committee
- Jun 5, 2025Submission request sent to Applicant
- Jun 5, 2025Request for Review Comments returned by County Attorney - Water
- Jun 5, 2025Request for Review Comments returned by EPC Fire and Wildfire Program Manager
- Jun 4, 2025Request for Review Comments email resent for Project Canyon Creek Ranch for review by Roland Peterson on behalf of EPC Fire and Wildfire Program Manager
- Jun 4, 2025Request for Review Comments returned by EPC Fire and Wildfire Program Manager
- Jun 3, 2025Request for Review Comments returned by PCD Project Manager
- Jun 3, 2025Request for Review Comments returned by EPC Stormwater Review
- Jun 3, 2025Request for Review Comments returned by County Attorney - Development Review
- Jun 3, 2025Request for Review Comments returned by PCD Engineering Division
- Jun 3, 2025Request for Review Comments email sent for Project Canyon Creek Ranch for review by Roland Peterson on behalf of EPC Fire and Wildfire Program Manager
- Jun 3, 2025Request for Review Comments email sent for Project Canyon Creek Ranch for review by Terry Stokka on behalf of Black Forest Land Use Committee
- Jun 3, 2025Request for Review Comments email sent for Project Canyon Creek Ranch for review by Terry Stokka on behalf of Black Forest Land Use Committee
- May 30, 2025Request for Review Comments returned by Pikes Peak Regional Building Department
- May 22, 2025Request for Review Comments returned by 911 Authority - El Paso/Teller County
- May 21, 2025Request for Review Comments returned by EPC Environmental Services
- May 20, 2025Request for Review Comments email sent for Project Canyon Creek Ranch for review by on behalf of Pikes Peak Regional Building Department
- May 20, 2025Request for Review Comments email sent for Project Canyon Creek Ranch for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
- May 20, 2025Request for Review Comments email sent for Project Canyon Creek Ranch for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
- May 20, 2025Request for Review Comments email sent for Project Canyon Creek Ranch for review by Zachary Jannusch on behalf of EPC Stormwater Review
- May 20, 2025Request for Review Comments email sent for Project Canyon Creek Ranch for review by Mikayla Hartford on behalf of EPC Stormwater Review
- May 20, 2025Request for Review Comments email sent for Project Canyon Creek Ranch for review by Glenn Reese on behalf of EPC Stormwater Review
- May 20, 2025Request for Review Comments email sent for Project Canyon Creek Ranch for review by Christina Prete on behalf of EPC Stormwater Review
- May 20, 2025Request for Review Comments email sent for Project Canyon Creek Ranch for review by Kathy Andrew on behalf of EPC Environmental Services
- May 20, 2025Request for Review Comments email sent for Project Canyon Creek Ranch for review by Lori Seago on behalf of County Attorney - Water
- May 20, 2025Request for Review Comments email sent for Project Canyon Creek Ranch for review by Erika Keech on behalf of County Attorney - Water
- May 20, 2025Request for Review Comments email sent for Project Canyon Creek Ranch for review by April Willie on behalf of County Attorney - Water
- May 20, 2025Request for Review Comments email sent for Project Canyon Creek Ranch for review by Lori Seago on behalf of County Attorney - Development Review
- May 20, 2025Request for Review Comments email sent for Project Canyon Creek Ranch for review by Erika Keech on behalf of County Attorney - Development Review
- May 20, 2025Request for Review Comments email sent for Project Canyon Creek Ranch for review by April Willie on behalf of County Attorney - Development Review
- May 20, 2025Request for Review Comments email sent for Project Canyon Creek Ranch for review by Justin Kilgore on behalf of PCD Project Manager
- May 20, 2025Request for Review Comments email sent for Project Canyon Creek Ranch for review by Engineering Manager on behalf of PCD Engineering Division
- May 20, 2025Request for Review Comments email sent for Project Canyon Creek Ranch for review by Gilbert LaForce on behalf of PCD Engineering Division
- May 20, 2025Submission Triaged
- May 19, 2025Submission received from Applicant
- Feb 7, 2025Submission request sent to Applicant
- Feb 7, 2025Request for Review Comments returned by County Attorney - Water
- Feb 5, 2025Submission request sent to Applicant
- Feb 4, 2025Request for Review Comments returned by PCD Engineering Division
- Jan 31, 2025Request for Review Comments returned by County Attorney - Development Review
- Jan 31, 2025Request for Review Comments returned by PCD Project Manager
- Jan 30, 2025Request for Review Comments returned by EPC Stormwater Review
- Jan 30, 2025Request for Review Comments returned by RBD Floodplain
- Jan 30, 2025Request for Review Comments email resent for Project Canyon Creek Ranch for review by Keith Curtis on behalf of RBD Floodplain
- Jan 30, 2025Request for Review Comments returned by RBD Floodplain
- Jan 30, 2025Request for Review Comments email resent for Project Canyon Creek Ranch for review by Keith Curtis on behalf of RBD Floodplain
- Jan 30, 2025Request for Review Comments returned by RBD Floodplain
- Jan 30, 2025Request for Review Comments email sent for Project Canyon Creek Ranch for review by Keith Curtis on behalf of RBD Floodplain
- Jan 27, 2025Request for Review Comments returned by Pikes Peak Regional Building Department
- Jan 21, 2025Request for Review Comments returned by EPC Environmental Services
- Jan 13, 2025Request for Review Comments returned by 911 Authority - El Paso/Teller County
- Jan 10, 2025Request for Review Comments email sent for Project Canyon Creek Ranch for review by on behalf of Black Forest Fire Protection District
- Jan 10, 2025Request for Review Comments email sent for Project Canyon Creek Ranch for review by on behalf of Pikes Peak Regional Building Department
- Jan 10, 2025Request for Review Comments email sent for Project Canyon Creek Ranch for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
- Jan 10, 2025Request for Review Comments email sent for Project Canyon Creek Ranch for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
- Jan 10, 2025Request for Review Comments email sent for Project Canyon Creek Ranch for review by Mikayla Hartford on behalf of EPC Stormwater Review
- Jan 10, 2025Request for Review Comments email sent for Project Canyon Creek Ranch for review by Glenn Reese on behalf of EPC Stormwater Review
- Jan 10, 2025Request for Review Comments email sent for Project Canyon Creek Ranch for review by Christina Prete on behalf of EPC Stormwater Review
- Jan 10, 2025Request for Review Comments email sent for Project Canyon Creek Ranch for review by Kathy Andrew on behalf of EPC Environmental Services
- Jan 10, 2025Request for Review Comments email sent for Project Canyon Creek Ranch for review by Lori Seago on behalf of County Attorney - Development Review
- Jan 10, 2025Request for Review Comments email sent for Project Canyon Creek Ranch for review by Erika Keech on behalf of County Attorney - Development Review
- Jan 10, 2025Request for Review Comments email sent for Project Canyon Creek Ranch for review by April Willie on behalf of County Attorney - Development Review
- Jan 10, 2025Request for Review Comments email sent for Project Canyon Creek Ranch for review by Justin Kilgore on behalf of PCD Project Manager
- Jan 10, 2025Request for Review Comments email sent for Project Canyon Creek Ranch for review by Gilbert LaForce on behalf of PCD Engineering Division
- Jan 10, 2025Request for Review Comments email sent for Project Canyon Creek Ranch for review by Engineering Manager on behalf of PCD Engineering Division
- Jan 10, 2025Submission Triaged
- Jan 10, 2025Submission received from Applicant
- Jan 2, 2025File # Assigned: SF2440
- Jan 2, 2025File # Assigned: SF2436
- Dec 17, 2024Submission request sent to Applicant
- Dec 12, 2024Submission request sent to Applicant
- Dec 12, 2024Project reopened for Review Comments
- Dec 12, 2024File # Assigned: SF2434
- Dec 12, 2024Set Applicant to William Guman & Associates, Ltd.
- Dec 4, 2024Project Cancelled: 12/4/2024
- Dec 4, 2024Project Closed
- Aug 11, 2023Submission request sent to Applicant
- Mar 10, 2023Request for Review Comments returned by EPC Health Department
- Mar 6, 2023Request for Review Comments returned by Colorado Division of Water Resources
- Mar 2, 2023Request for Review Comments returned by Black Forest Fire Protection District
- Mar 1, 2023Request for Review Comments returned by Colorado Parks and Wildlife
- Feb 28, 2023Submission request sent to Applicant
- Feb 28, 2023Request for Review Comments returned by PCD Project Manager
- Feb 28, 2023Request for Review Comments returned by PCD Engineering Division
- Feb 25, 2023Request for Review Comments returned by Black Forest Land Use Committee
- Feb 23, 2023Request for Review Comments returned by Colorado Geological Survey
- Feb 23, 2023Request for Review Comments returned by Pikes Peak Regional Building Department
- Feb 22, 2023Request for Review Comments returned by County Attorney - Development Review
- Feb 21, 2023Request for Review Comments returned by Colorado Springs Planning & Community Development
- Feb 16, 2023Request for Review Comments returned by Parks Advisory Board
- Feb 16, 2023Request for Review Comments returned by EPC Parks Department
- Feb 13, 2023Request for Review Comments returned by Mountain View Electric Association, Inc.
- Feb 13, 2023Request for Review Comments returned by Academy SD 20 Building Fund
- Feb 10, 2023Request for Review Comments returned by Colorado State Forest Service
- Feb 7, 2023Request for Review Comments returned by EPC Environmental Services
- Feb 3, 2023Request for Review Comments returned by 911 Authority - El Paso/Teller County
- Feb 2, 2023Request for Review Comments email sent for Project Canyon Creek Ranch MS for review by General Email on behalf of Mountain View Electric Association, Inc.
- Feb 2, 2023Request for Review Comments email sent for Project Canyon Creek Ranch MS for review by Gabe Sevigny on behalf of Colorado Springs Planning & Community Development
- Feb 2, 2023Request for Review Comments email sent for Project Canyon Creek Ranch MS for review by Supervisor Bob Swatek on behalf of Black Hills Energy-Aquila
- Feb 2, 2023Request for Review Comments email sent for Project Canyon Creek Ranch MS for review by Cheryl Pixley on behalf of Black Forest Trails Association
- Feb 2, 2023Request for Review Comments email sent for Project Canyon Creek Ranch MS for review by Terry Stokka on behalf of Black Forest Land Use Committee
- Feb 2, 2023Request for Review Comments email sent for Project Canyon Creek Ranch MS for review by Deputy Chief James Rebitski on behalf of Black Forest Fire Protection District
- Feb 2, 2023Request for Review Comments email sent for Project Canyon Creek Ranch MS for review by Plannig Consultant Donald Smith on behalf of Academy SD 20 Building Fund
- Feb 2, 2023Request for Review Comments email sent for Project Canyon Creek Ranch MS for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
- Feb 2, 2023Request for Review Comments email sent for Project Canyon Creek Ranch MS for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
- Feb 2, 2023Request for Review Comments email sent for Project Canyon Creek Ranch MS for review by Jennifer DeWoody on behalf of US Forest Service, Pikes Peak Ranger District
- Feb 2, 2023Request for Review Comments email sent for Project Canyon Creek Ranch MS for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
- Feb 2, 2023Request for Review Comments email sent for Project Canyon Creek Ranch MS for review by Joseph Martinez on behalf of US Army Corps of Engineers-Pueblo
- Feb 2, 2023Request for Review Comments email sent for Project Canyon Creek Ranch MS for review by Mr. Andy Schlosberg on behalf of Colorado State Forest Service
- Feb 2, 2023Request for Review Comments email sent for Project Canyon Creek Ranch MS for review by Kimberly Berscheid on behalf of Colorado Parks and Wildlife
- Feb 2, 2023Request for Review Comments email sent for Project Canyon Creek Ranch MS for review by Colorado Geological Survey on behalf of Colorado Geological Survey
- Feb 2, 2023Request for Review Comments email sent for Project Canyon Creek Ranch MS for review by Joanna Williams on behalf of Colorado Division of Water Resources
- Feb 2, 2023Request for Review Comments email sent for Project Canyon Creek Ranch MS for review by on behalf of Parks Advisory Board
- Feb 2, 2023Request for Review Comments email sent for Project Canyon Creek Ranch MS for review by Commander John Padgett on behalf of EPC Sheriff's Department
- Feb 2, 2023Request for Review Comments email sent for Project Canyon Creek Ranch MS for review by on behalf of EPC Parks Department
- Feb 2, 2023Request for Review Comments email sent for Project Canyon Creek Ranch MS for review by Catherine McGarvy on behalf of EPC Health Department
- Feb 2, 2023Request for Review Comments email sent for Project Canyon Creek Ranch MS for review by Kathy Andrew on behalf of EPC Environmental Services
- Feb 2, 2023Request for Review Comments email sent for Project Canyon Creek Ranch MS for review by Edi Anderson on behalf of County Attorney - Water
- Feb 2, 2023Request for Review Comments email sent for Project Canyon Creek Ranch MS for review by Lori Seago on behalf of County Attorney - Development Review
- Feb 2, 2023Request for Review Comments email sent for Project Canyon Creek Ranch MS for review by Ryan Howser on behalf of PCD Project Manager
- Feb 2, 2023Request for Review Comments email sent for Project Canyon Creek Ranch MS for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
- Jan 26, 2023Fees paid: 1/26/2023 (Receipt: 1007366)
- Dec 28, 2022File # Assigned: MS2213
- Dec 28, 2022Payment Request sent: 12/28/2022
- Dec 28, 2022Submission Triaged
- Dec 22, 2022Submission received from Applicant