Elk View Estates - Final Plat

Final plat SF266 Active

6 to 10 lot subdivision

Location
OLD RANCH RD, 80908
Jurisdiction
El Paso County
Applicant
Elk Ridge Developments, LLC Dean Heisler
Land owner (assessor)
ELK RIDGE DEVELOPMENTS LLC (state record)
County project manager
Lacey Dean
Filed
Mar 11, 2025
Parcel
6223000044
Map
Parcel boundaries: Colorado public parcel data · Basemap © OpenStreetMap contributors
Area map
See all Tri-Lakes projects on the map
Source record
El Paso County EDARP file

Documents (66)

comment responsereviewAug 25, 2026
comment responsereviewAug 25, 2026
comment responsereviewAug 25, 2026
comment responsereviewAug 25, 2026
Easement DeedreviewAug 25, 2026
comment responsereviewAug 25, 2026
Easement DeedreviewAug 25, 2026
Water Resources ReportreviewAug 25, 2026
Traffic Impact StudyreviewAug 25, 2026
Final Plat DrawingsreviewAug 25, 2026
Drainage Report - FinalreviewAug 25, 2026
Final Plat DrawingsreviewJun 30, 2026
agency commentsreviewJun 25, 2026
PCM Applicability FormreviewJun 25, 2026
Water Resources ReportreviewJun 25, 2026
Traffic Impact StudyreviewJun 25, 2026
Letter of IntentreviewJun 25, 2026
Fire Protection ReportreviewJun 25, 2026
Drainage Report - FinalreviewJun 25, 2026
Application/Petition FormreviewJun 25, 2026
Soils & Geology ReportreviewMar 17, 2026
FEMA LOMR, CLOMR, LOMAreviewNov 26, 2025
Wastewater Treatment ReportreviewNov 26, 2025
Natural Features ReportreviewNov 26, 2025
Closures Sheet (Survey)reviewNov 26, 2025
Mack, Gail_OPPOSITION2additionalSep 14, 2026
Returned NoticesadditionalApr 14, 2026
Received 4/13/2026
Mack, Gail_OPPOSITIONadditionalApr 2, 2026
Selected RangeadditionalMar 23, 2026
Selected Range was 500 feet. JM
Neighbor Notice & Vicinity MapadditionalMar 23, 2026
Notice of Application letters were mailed to surrounding property owners on 03/23/2026. JM
Mailing LabelsadditionalMar 23, 2026
Mailing Labels for the 58 surrounding property owners that received notices. Cost = $42.92. JM

Agency review comments (102)

Comments returned by referral agencies during review, from the county's public EDARP file. Some agencies attach a letter instead of (or alongside) written comments.

County Attorney - Waterreview 5Sep 23, 2026
See attached Water Supply Review and Recommendations.
View attached comment letter
Black Forest Fire Protection Districtreview 4Sep 10, 2026
BFFR has reviewed the Elk View Estates Final Plat, Fire Protection Report, and current construction drawings. The project proposes six single-family residential lots on approximately 17.05 acres within the Black Forest Fire Rescue Protection District. The Fire Protection Report identifies a **single 30,000-gallon fire cistern with dry hydrant near the development entrance, to be installed prior to issuance of the first building permit**. BFFR accepts the 30,000-gallon concept; however, this shall be **30,000 gallons minimum usable fire-water capacity** and the final installation shall comply with current BFFR rural water-supply/cistern and dry-hydrant requirements. All private fire apparatus access roads shall comply with the **2021 International Fire Code, as adopted and amended**, applicable adopted appendices, El Paso County Land Development Code Section 6.3.3, and BFFR requirements for all-weather load-bearing access, unobstructed width, turning radius, grade, vertical clearance, and turnaround provisions. The current construction set identifies the private roadway and associated plan/profile sheets; final geometry remains subject to BFFR approval. The Fire Protection Report also states that any controlled access will include a **Knox Box for fire department access**. Any gate installed shall meet BFFR/IFC emergency-access requirements and be equipped with an approved Knox access method prior to occupancy. Each future residence and applicable accessory structure shall also be reviewed at building permit for compliance with the **Colorado Wildfire Resiliency Code (CWRC)** based upon the applicable mapped wildfire intensity classification and shall comply with all required structure-hardening and defensible-space provisions.
PCD Engineering Divisionreview 3Sep 10, 2026
Review 3: EPC Development Services Engineer minor comments have been provided on the following documents: - Traffic Report - Final Drainage Report Please resubmit documents with signatures. Reviewed by: Charlene Durham, PE charlenedurham@elpasoco.com
PCD Engineering Divisionreview 3Sep 10, 2026
Easement Deed 2 Redlines
View attached comment letter
PCD Engineering Divisionreview 3Sep 10, 2026
Easement Deed 1 Redlines
View attached comment letter
PCD Engineering Divisionreview 3Sep 10, 2026
Declaration of Covenants Redlines
View attached comment letter
PCD Engineering Divisionreview 3Sep 10, 2026
Letter of Intent Redlines
View attached comment letter
PCD Engineering Divisionreview 3Sep 10, 2026
Final Plat Redlines
View attached comment letter
PCD Engineering Divisionreview 3Sep 10, 2026
PCM Maintenance Agreement Redlines
View attached comment letter
PCD Engineering Divisionreview 3Sep 10, 2026
GEC Checklist Redlines
View attached comment letter
PCD Engineering Divisionreview 3Sep 10, 2026
FDR Redlines
View attached comment letter
PCD Engineering Divisionreview 3Sep 10, 2026
TIS Redlines
View attached comment letter
PCD Project Managerreview 4Sep 9, 2026
**ALL DOCUMENTS WITH COMMENTS TO BE UPLOADED AFTER ENGINEER REVIEW***
PCD Project Managerreview 4Sep 9, 2026
Review 3: EPC Planning Division has comments in green text boxes on the following documents: - Final Plat Drawings - Letter of Intent - Declaration of Covenants - Easement Deeds (INFORMATIONAL ONLY) Reviewed by: Lacey Dean, Associate Planner laceydean2@elpasoco.com
EPC Stormwater Reviewreview 4Sep 9, 2026
Review 3: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents (to be uploaded by the Project Manager): - Drainage Report - PCM Maintenance Agreement - GEC Checklist EPC DPW Stormwater comments have been resolved on the following documents: - ESQCP - Final Plat - GEC Plan Reviewed by: Mikayla Hartford, P.E. Engineer - Stormwater 719.339.5053 MikaylaHartford@elpasoco.com
County Attorney - Development Reviewreview 4Sep 9, 2026
Thanks for submitting the updated detention basin agreement. In future submittal, please include Exhibit B (and make sure the easement abuts a public road so the County has legal access). Please also add the letter "t" to the end of the County Signatory's first name (Gilbert LaForce). No additional comments with respect to that agreement. Regarding the SIA, please fill in collateral information and incorporate prior County Attorney edits before future submittal. Reviewed by: Erika Keech, Sr. County Attorney, erikakeech2@elpasoco.com.
Mountain View Electric Association, Inc.review 4Sep 2, 2026
Pursuant to Mountain View Electric Association's Comment Letter dated April 13, 2026, MVEA requests 10' Utility Easements on the front, side and rear of all lots, and a 20' exterior Utility Easement on the Plat.
Pikes Peak Regional Building Departmentreview 4Sep 2, 2026
Per E-911 comments, please reserve an acceptable street name. Addressing on the Final Plat looks good. Previous general final plat comments still apply. Becky Allen PPRBD Enumerations beckya@pprbd.org
County Attorney - Waterreview 4Sep 1, 2026
Please be sure the Water Resource Report and Water Supply Information Summary lists the correct name from the Final Plat Drawing ‘Elk Ridge Estates’ (not Elk View Estates). Once an updated letter from the Colorado Division of Water has been received showing adequate water, this office will begin review.
911 Authority - El Paso/Teller Countyreview 4Aug 31, 2026
Comments for E911 as follows: Elk Heights – Not available, existing. For clarification, the streetname must be unique. Taking an existing streetname and changing the suffix is not sufficient. To assist with finding a unique name, streetnaming information (criteria, existing/reserved names) can be found at: https://www.elpasoteller911.org/street-emergency-number-databases Thank you Justin
PCD Project Managerreview 3Aug 13, 2026
V2_Final Plat Drawings_additional comments
View attached comment letter
County Attorney - Development Reviewreview 2Aug 6, 2026
See attached edits to the SIA. Reviewed by: Erika Keech, Sr. County Attorney, erikakeech2@elpasoco.com.
View attached comment letter
County Attorney - Development Reviewreview 2Aug 6, 2026
If HOA is also intended to be a party to the DMA/Stormwater Quality Maintenance Agreement, please use the attached template in lieu of the other one previously submitted and resubmit it for review.
View attached comment letter
County Attorney - Development Reviewreview 2Aug 6, 2026
See attached comments to DMA. Reviewed by: Erika Keech, Sr. County Attorney, erikakeech2@elpasoco.com
View attached comment letter
Black Forest Fire Protection Districtreview 2Aug 3, 2026
BFFRPD reviewed the submitted Fire Protection Report and construction drawings. The report describes the District’s capabilities and states that the project complies with County requirements; however, it does not provide the compliance analysis required by or the BFFRPD Enhanced Rural Fire Water Regulations. According to the State WRC map, this development is located within a Class 2 Moderate Intensity area. The revised report and plans must identify and address the applicable Class 2 structure-hardening, defensible-space, vegetation-mitigation and fire-water requirements. The applicant may satisfy the fire-water requirement by: 1. Documenting an approved and reliable pressurized hydrant within one mile, including legal authorization for its use when the hydrant is not owned or controlled by the developer; 2. Submitting an alternative fire-water plan for review and approval by the AHJ; or 3. Complying with the BFFRPD Enhanced Rural Fire Water Regulations. If the proposed 30,000-gallon cistern is retained, the report must identify the applicable Table 7.4 basis and any required residential sprinkler, building-size or recorded covenant restrictions. Thirty thousand gallons is not automatically sufficient merely because it is the minimum permitted quantity; the applicable Table 7.4 category controls. The plans must demonstrate that the assumed fire apparatus parking area for every lot is within 900 feet of an approved water connection. If the entrance cistern cannot serve the northern lots within that distance, the cistern must be relocated, an additional water source provided, or a minimum six-inch dedicated private fire main and hydrants installed. The revised report shall also document roadway width, maximum sustained grade, turning radii, cul-de-sac, all-weather loading, gate/Knox operation, cistern access and long-term HOA maintenance. A separate cistern design and permit will be required. All fire-water and access improvements must be installed, tested, commissioned and accepted by BFFRPD before the first building permit is issued.
PCD Project Managerreview 3Jul 28, 2026
V2_Declaration of Covenants_comments
View attached comment letter
PCD Project Managerreview 3Jul 28, 2026
V2_Water Resources Report_comments
View attached comment letter
PCD Project Managerreview 3Jul 28, 2026
V2_Water Supply Information Summary_comments
View attached comment letter
PCD Project Managerreview 3Jul 28, 2026
Additional Review 2: Additional comments have been made in green text boxes on the following documents. - Final Plat Drawings - Water Summary information sheet - Water Resources Report - Declaration of Covenants Reviewed by: Lacey Dean, Associate Planner (laceydean2@elpasoco.com) with assistance from Ryan Howser, Principal Planner (ryanhowser@elpasoco.com)
PCD Project Managerreview 2Jul 23, 2026
V2_Traffic Impact Study_comments
View attached comment letter
PCD Project Managerreview 2Jul 23, 2026
V2_PCM Maintenance Agreement (MS WORD version required - attachments included)_comments
View attached comment letter
PCD Project Managerreview 2Jul 23, 2026
V2_Grading & Erosion Control (GEC) Plan_comments
View attached comment letter
PCD Project Managerreview 2Jul 23, 2026
V2_Grading & Erosion Control (GEC) Checklist_comments
View attached comment letter
PCD Project Managerreview 2Jul 23, 2026
V2_Financial Assurance Estimate (FAE) Form_comments
View attached comment letter
PCD Project Managerreview 2Jul 23, 2026
V2_Final Plat Drawings_comments
View attached comment letter
PCD Project Managerreview 2Jul 23, 2026
V2_Erosion and Stormwater Quality Control Permit (ESQCP)_comments
View attached comment letter
PCD Project Managerreview 2Jul 23, 2026
V2_Drainage Report - Final_comments
View attached comment letter
PCD Project Managerreview 2Jul 23, 2026
V2_Construction Drawings (Plans-Profiles)_comments
View attached comment letter
PCD Project Managerreview 2Jul 23, 2026
Review 2: EPC Planning Division has comments in green text boxes on the following documents: - Final Plat Drawings The following documents may require additional revision. Staff will confer with Principal Planners for more accurate review and send a revised submittal request if further revision is deemed necessary. - Water Resources Report - Water Supply Information Sheet Reviewed by: Lacey Dean, Associate Planner laceydean2@elpasoco.com
PCD Engineering Divisionreview 2Jul 23, 2026
Review 2: EPC Development Services Engineer comments have been provided on the following documents (to be uploaded by Project Manager): - Traffic Report - Plat - Construction Drawings - Final Drainage Report - FAE (to be uploaded by stormwater) Reviewed by: Charlene Durham, PE charlenedurham@elpasoco.com
EPC Stormwater Reviewreview 2Jul 23, 2026
Review 2: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents (to be uploaded by the Project Manager): - Drainage Report - GEC Plan - GEC Checklist - ESQCP - Final Plat - PCM Maintenance Agreement EPC DPW Stormwater comments have been resolved on the following documents: - FAE - PCM Applicability Form - PCM O&M Manual - SWMP - SWMP Checklist Reviewed by: Mikayla Hartford, P.E. Engineer - Stormwater 719.339.5053 MikaylaHartford@elpasoco.com
Pikes Peak Regional Building Departmentreview 2Jul 22, 2026
1. See comment from E-911, please reserve a street name which follows an acceptable format. 2. Addressing for this development is a follows: Lot 1 - 10530, Lot 2 - 10580, Lot 3 - 10630, Lot 4 - 10780, Lot 5 - 10730, Lot 6 – 10680. Please add these addresses prior to our mylar (pre-plat) review. General Final Plat comments apply: 1. Enumerations will review the pre-plat (mylar) prior to plat for address placement, street names, and title block. 2. A $10.00 per lot and tract platting fee will be due at the time of the review of the pre-plat, (two addresses per lot and tract). If an address is not needed on a tract then no fee applies. Check should be made out to PIKES PEAK REGIONAL BUILDING DEPARTMENT or PPRBD. As of December 5th 2023, the fee for all credit/debit cards has changed from the flat 2.95% fee to the following: Over the phone Credit/Debit Card payments will be 2.3% and In-Person Debit Card payments will be 1.5% (in-person only). Paid directly to the Enumerations Department. 3. Pre-plat reviews must be performed in-person. The pre-plat will be stamped by Enumerations for accuracy and returned to the applicant and the planner. All payments to be mailed to RBD via a check or credit card payment over the phone. Plats should not be recorded prior to Enumerations stamping the pre-plat and receiving payment of plat fees. If any pre-plat changes occur, even if changes do not apply to Enumerations, we still need to re-stamp the pre-plat. The Enumerations stamped pre-plat copy should match the recorded document minus a few signatures. Please schedule an in-person review, make an appointment on our website, https://www.pprbd.org/Home/BookAppt 4. A copy of the final recorded plat is required prior to plan submittal for RESIDENTIAL. Please email the Enumerations staff member that reviewed your project. BeckyA@pprbd.org
County Attorney - Waterreview 2Jul 17, 2026
Once an updated letter from the Colorado Division of Water has been received showing adequate water, this office will begin review.
911 Authority - El Paso/Teller Countyreview 2Jul 9, 2026
Comments for E911 as follows: Elk View Pt – Not acceptable, name cannot consist of more than one suffix (view/point) Streetnaming information (criteria, existing/reserved names) can be found at: https://www.elpasoteller911.org/street-emergency-number-databases Thank you Justin
Mountain View Electric Association, Inc.review 1Apr 13, 2026
View attached comment letter
Mountain View Electric Association, Inc.review 1Apr 13, 2026
View attached comment letter
Mountain View Electric Association, Inc.review 1Apr 13, 2026
View attached comment letter
Mountain View Electric Association, Inc.review 1Apr 13, 2026
View attached comment letter
Mountain View Electric Association, Inc.review 1Apr 13, 2026
View attached comment letter
County Attorney - Waterreview 1Apr 10, 2026
This office needs more information before evaluation. Please upload (1) a Water Decree or Determination and, if applicable, a replacement plan/augmentation plan showing Applicant’s water rights under the property, (2) deeds showing ownership of those water rights if not decreed in the name of the current property owner, and (3) an updated Water Resources Report (WRR) meeting the requirements of Section 8.4.7. (B) of the Land Development Code and incorporating information from the water decree/determination. Please also double-check your estimated demand for irrigation. 1 acre is 43,560 square feet. At 0.0566 acre-foot/1,000 square feet, which is the presumptive use value in the LDC, 2.43 annual acre-feet would be required to meet this demand. This office will complete its review upon receipt of the above information and a letter from the Colorado Division of Water Resources that finds sufficient water. A letter has been uploaded from April 9, 2026, but more information is requested to provide evidence that the proposed water demand can be met.
PCD Project Managerreview 1Apr 9, 2026
V1_Drainage Report - Final_comments
View attached comment letter
PCD Project Managerreview 1Apr 9, 2026
V1_Traffic Impact Study_comments
View attached comment letter
PCD Project Managerreview 1Apr 9, 2026
V1_Water Supply Information Summary_comments
View attached comment letter
PCD Project Managerreview 1Apr 9, 2026
V1_Water Resources Report_comments
View attached comment letter
PCD Project Managerreview 1Apr 9, 2026
V1_Subdivision Improvement Agreement_comments
View attached comment letter
PCD Project Managerreview 1Apr 9, 2026
V1_Letter of Intent_comments
View attached comment letter
PCD Project Managerreview 1Apr 9, 2026
V1_Grading & Erosion Control (GEC) Plan_comments
View attached comment letter
PCD Project Managerreview 1Apr 9, 2026
V1_Fire Protection Report_comments
View attached comment letter
PCD Project Managerreview 1Apr 9, 2026
V1_Financial Assurance Estimate (FAE) Form_comments
View attached comment letter
PCD Project Managerreview 1Apr 9, 2026
V1_Final Plat Drawings_comments
View attached comment letter
PCD Project Managerreview 1Apr 9, 2026
V1_Construction Drawings (Plans-Profiles)_comments
View attached comment letter
PCD Project Managerreview 1Apr 9, 2026
V1_Application-Petition Form_comments
View attached comment letter
PCD Project Managerreview 1Apr 9, 2026
V1_Storm Water Management Plan (SWMP)_comments
View attached comment letter
PCD Project Managerreview 1Apr 9, 2026
V1_Storm Water Management Plan (SWMP) Checklist_comments
View attached comment letter
PCD Project Managerreview 1Apr 9, 2026
V1_PCM Operations & Maintenance (O&M) Manual_comments
View attached comment letter
PCD Project Managerreview 1Apr 9, 2026
V1_PCM Maintenance Agreement (MS WORD version required - attachments included)_comments
View attached comment letter
PCD Project Managerreview 1Apr 9, 2026
V1_PCM Applicability Form_comments
View attached comment letter
PCD Project Managerreview 1Apr 9, 2026
V1_Grading & Erosion Control Checklist_comments
View attached comment letter
PCD Project Managerreview 1Apr 9, 2026
V1_Erosion and Stormwater Quality Control Permit (ESQCP)_comments
View attached comment letter
PCD Project Managerreview 1Apr 9, 2026
Review 1: EPC Planning Division has comments in green text boxes on the following documents: - Application/Petition Form - Final Plat Drawings ***NOTE*** A complete list of the applicable plat notes will be provided as a separate document for your reference - Fire Protection Report - Letter of Intent - Subdivision Improvement Agreement - Water Resources Report - Water Supply Information Sheet Please also submit the following HOA documents for review - Covenants - Articles of Incorporation - Bylaws - Secretary of State Reviewed by: Lacey Dean, Associate Planner laceydean2@elpasoco.com
Colorado Division of Water Resourcesreview 1Apr 9, 2026
View attached comment letter
Colorado Division of Water Resourcesreview 1Apr 9, 2026
View attached comment letter
Colorado Division of Water Resourcesreview 1Apr 9, 2026
View attached comment letter
Colorado Division of Water Resourcesreview 1Apr 9, 2026
View attached comment letter
Colorado Division of Water Resourcesreview 1Apr 9, 2026
View attached comment letter
Black Hills Energy-Aquilareview 1Apr 9, 2026
BHE will serve. BHE has facilities in area please call in locates before excavation.
PCD Engineering Divisionreview 1Apr 9, 2026
Review 1: EPC Development Services Engineer comments have been provided on the following documents (to be uploaded by Project Manager): - Traffic Report - Letter of Intent - Plat - Construction Drawings - Grading and Erosion Control Plans - Final Drainage Report - FAE (to be uploaded by stormwater) Reviewed by: Charlene Durham, PE charlenedurham@elpasoco.com
EPC Stormwater Reviewreview 1Apr 9, 2026
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents (to be uploaded by the Project Manager): - Drainage Report - ESQCP - FAE - Final Plat - GEC Plan - GEC Checklist - PCM Maintenance Agreement - PCM O&M Manual - PCM Applicability Form - SWMP - SWMP Checklist Reviewed by: Mikayla Hartford, P.E. Engineer - Stormwater 719.339.5053 MikaylaHartford@elpasoco.com
Upper Black Squirrel Creek GWMDreview 1Apr 8, 2026
The Upper Black Squirrel Creek GWMD does not have any comments at this time but respectfully reserves the right to comment on future submittals.
Colorado Geological Surveyreview 1Apr 8, 2026
View attached comment letter
Colorado Geological Surveyreview 1Apr 8, 2026
View attached comment letter
Colorado Geological Surveyreview 1Apr 8, 2026
View attached comment letter
Colorado Geological Surveyreview 1Apr 8, 2026
View attached comment letter
Colorado Geological Surveyreview 1Apr 8, 2026
View attached comment letter
Black Forest Fire Protection Districtreview 1Apr 5, 2026
BFFRPD (Black Forest Fire Rescue Protection District) has reviewed the proposed project. Of concern for BFFRPD operations is the fire department access and fire protection water supplies, considering there are no known cisterns and there is not a municipal water system. Per BFFRPD, Fire Protection Cisterns or natural water supplies shall be provided in; subdivisions of 5 or more lots, commercial/industrial developments where there is insufficient public and or private water supply to meet minimum fire flows required by NFPA 1141, 1142 and reference standards of those publications. The applicant states installation of a 5,000 gallon cistern for each lot which may cause undue hardship. We invite the applicant to discuss alterative options such as one 30,000 gallon cistern instead of six 5,000 gallon cisterns. All structures and street signs need to comply with PPRBD, EL Paso County standards, IBC and IFC 2015 standards. Our recommendation is the applicant demonstrate full compliance and conformance with El Paso County’s adopted Land Development Code (LDC), Engineering Criteria Manual (ECM), adopted International Fire Code (IFC), and all other adopted codes, provisions, or statutes that impact fire safety to include access/egress, water supply, hardening of structures, addressing, fire protection systems, etc. As of April 1st, 2026, the Colorado Wildfire Resiliency Code (CWRC) takes effects and although IFC 2015 is currently adopted, be advised BFFRPD is currently in the process of transitioning to the 2021 IFC and adopting the CWRC. It may be prudent for applicant to abide by 2021 IFC requirements to prevent shortcomings in building requirements if 2021 IFC is adopted prior to construction.
Pikes Peak Regional Building Departmentreview 1Apr 3, 2026
1. The North/South access roadway on the East side of the development will need to be named. Please contact Emergency Services 911 to reserve a street name. Contact Justin Annan jannan@eptc911.org. 2. An address change will need to occur in conjunction with the plat for 4570 Old Ranch Road, it is the developer’s responsibility to notify the owners of this property that their address will change due to the new named access. Thank you, Becky Allen Enumerations Plans Examiner Pikes Peak Regional Building Department O: 719-799-2707 W: pprbd.org E: beckya@pprbd.org
911 Authority - El Paso/Teller Countyreview 1Mar 31, 2026
Comments for E911 as follows: The private access running North/South along the East side of this development should be a named roadway. Please be aware that if this road is intended as an improved access for the existing 4570 Old Ranch Rd, this will require an address change for them. This should be discussed with the owner in advance. Streetnaming information (criteria, existing/reserved names) can be found at: https://www.elpasoteller911.org/street-emergency-number-databases Thank you. Justin
Colorado Springs Utilities, Dev, Svc.(includes water resources)review 1Mar 27, 2026
No comment. Outside of Springs Utilities service territory.
EPC Parks Departmentreview 1Mar 26, 2026
Please See Attached Documentation. This project will be reviewed administratively by Parks staff. Thank you! Ashlyn Mathy Parks Planner Park Planning Division El Paso County Parks Department ashlynmathy@elpasoco.com
View attached comment letter
Colorado Parks and Wildlifereview 1Mar 25, 2026
Colorado Parks and Wildlife (CPW) has reviewed the plans for the Elk View Estates - Final Plat in El Paso County. Colorado Parks and Wildlife (CPW) is familiar with the site. Based on the location and proposed actions, CPW anticipates that this project's impacts on the wildlife resource would be negligible. We appreciate being allowed to comment. Please feel free to contact District Wildlife Manager, Aaron Berscheid, should you have any questions or require additional information at 719-439-9601 or via email at aaron.berscheid@state.co.us
Black Forest Land Use Committeereview 1Mar 25, 2026
The Black Forest Land Use Committee regrets that we were unaware that this project had progressed to the final plat stage. We sincerely wish there was a way we could be notified of PC and BoCC hearings for specific proposals without having to check the website every week. The only issue we had with this development was the necessity of creating a new road on the east side of the parcel. We don't understand why Studebaker Lane on the west side couldn't be used. The new road no doubt took some land from adjoining land owners .
Academy SD 20 Building Fundreview 1Mar 25, 2026
Academy District 20 is in receipt of File #SF266 for approval of the Elk View Estates - Final Plat. The District is requesting fees in lieu of land dedication per the existing County Code for all residential units within this development. The District is experiencing ongoing residential development. The District gained approximately 13,650 new residential units between 2018 and 2025 which included 5,650 Single Family, 1,225 Single Family Attached, and 6,800 Apartments as reported to the District by local developers. During that same timeframe, the District only experienced a total membership increase of 23 students. This information is updated annually in October. A drop in the birth rate plus the significant increase in the cost of housing has slowed student growth in the District. The District is able to serve each student who is a resident of District 20. If you need additional information, please contact me. Don Smith Planning Consultant
US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)review 1Mar 24, 2026
The USFWS has concluded that we have no concerns with impacts resulting from this project to species covered under the Endangered Species Act.
EPC Environmental Servicesreview 1Mar 23, 2026
View attached comment letter
EPC Environmental Servicesreview 1Mar 23, 2026
View attached comment letter
EPC Environmental Servicesreview 1Mar 23, 2026
View attached comment letter
EPC Environmental Servicesreview 1Mar 23, 2026
View attached comment letter
EPC Environmental Servicesreview 1Mar 23, 2026
View attached comment letter
Colorado Springs Planning & Community Developmentreview 1Mar 23, 2026
Alexander Painter has been assigned this project do discuss potential requests for annexation given the proximity to City jurisdiction. If you have any questions please reach out to alexander.painter@coloradosprings.gov.
PCD Administrative Noticereview 1Mar 23, 2026
On 03/23/2026, PCD mailed "Notice of Application" letters to surrounding property owners within a 500-foot range (58 addresses). Copies of the notice, mailing labels, and selected range have been uploaded to the EDARP file. Cost of postage to be billed to the applicant = $42.92. JM
Colorado Department of Transportation - Pueblo Officereview 1Mar 23, 2026
CDOT has no comments regarding this development.
RBD Floodplainreview 1Mar 23, 2026
no floodplain on property, no comment.