Fall Mountain Farm Expansion

Special use AL2611 Active

Special Use to allow agritainment parking greater than 50

Location
16300 MOUNT HERMAN LN; 16456 FALLON RD; 16455 FALLON RD, 80132
Jurisdiction
El Paso County
Applicant
Fall Mountain Farm Company Steve Roscio
Land owners (assessor)
ROSCIO STEVEN J & ROSCIO CATHERINE L; ROSCIO STEVE & ROSCIO CATHY
County project manager
Lacey Dean
Filed
Jan 14, 2025
Parcels
7100000355, 7129001003, 7129002002
Map
Parcel boundaries: Colorado public parcel data · Basemap © OpenStreetMap contributors
Area map
See all Tri-Lakes projects on the map
Source record
El Paso County EDARP file

Documents (11)

Site Plan DrawingreviewJul 23, 2026
Letter of IntentreviewJul 23, 2026
Traffic Impact StudyreviewJul 23, 2026
Proof of UtilitiesreviewApr 30, 2026
Application/Petition FormreviewApr 30, 2026
Selected RangeadditionalMay 11, 2026
Selected Range was 500 feet. JM
Mailing LabelsadditionalMay 11, 2026
Mailing Labels for the 11 surrounding property owners. The cost to be billed to the applicant = $8.14 JM
Hearing Notice & Vicinity MapadditionalMay 11, 2026
"Notice of Administrative Decision" letters were mailed by PCD on 05/11/2025. The potential decision can be made after 05/25/2025. JM

Agency review comments (20)

Comments returned by referral agencies during review, from the county's public EDARP file. Some agencies attach a letter instead of (or alongside) written comments.

Town of Monument Planningreview 2Aug 27, 2026
No Comments.
PCD Project Managerreview 2Aug 12, 2026
V2_Supplemental Applicant Response Package_comments
View attached comment letter
PCD Project Managerreview 2Aug 12, 2026
V2_Site Plan Drawing_comments
View attached comment letter
PCD Project Managerreview 2Aug 12, 2026
V2_Letter of Intent_comments
View attached comment letter
PCD Engineering Divisionreview 2Aug 11, 2026
TIS comments
View attached comment letter
PCD Project Managerreview 2Aug 11, 2026
Review 2: EPC Planning Division has comments in green text boxes on the following documents. - Letter of Intent - Site Plan Drawing Reviewed by: Lacey Dean, Associate Planner laceydean2@elpasoco.com
PCD Engineering Divisionreview 2Aug 11, 2026
Review 2. Engineering comments on the following documents: - Letter of Intent...........................................................To be uploaded by the project manager - Supplemental Applicant Response Package............To be uploaded by the project manager - Site Development Plan..............................................To be uploaded by the project manager - Traffic Impact Study...................................................Uploaded Reviewed by: Joe Sandstrom, EIT, CFM Associate Engineer Department of Public Works O: 719-520-6314 M: 719-505-0516 josephsandstrom@elpasoco.com Laura Besler, P.E. Engineer Department of Public Works Office: (719) 520-6868 Mobile: (719) 482-0977 laurabesler@elpasoco.com
EPC DPW Stormwaterreview 2Aug 10, 2026
Review 2: EPC DPW Stormwater has no further comments on this special use application. Project Manager: no re-review necessary. Reviewed by: Mikayla Hartford, P.E. Senior Engineer - Stormwater 719.339.5053 MikaylaHartford@elpasoco.com
PCD Engineering Divisionreview 1May 26, 2026
Road Impact Fee Acknowledgement Form
View attached comment letter
PCD Engineering Divisionreview 1May 26, 2026
Site Plan comments
View attached comment letter
PCD Engineering Divisionreview 1May 26, 2026
Letter of Intent comments
View attached comment letter
PCD Engineering Divisionreview 1May 26, 2026
Review 1. Engineering comments on the following documents: - Letter of Intent - Site Development Plan - Traffic Impact Study Planning comments are included on the following documents: - Letter of Intent - Site Development Plan The following document is required with the next submittal: - Road Impact Fee Acknowledgement Form (blank form uploaded) Reviewed by: Joe Sandstrom, EIT, CFM Associate Engineer Department of Public Works O: 719-520-6314 M: 719-505-0516 josephsandstrom@elpasoco.com Laura Besler, P.E. Engineer Department of Public Works Office: (719) 520-6868 Mobile: (719) 482-0977 laurabesler@elpasoco.com
PCD Engineering Divisionreview 1May 26, 2026
TIS comments
View attached comment letter
EPC DPW Stormwaterreview 1May 20, 2026
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents (to be uploaded by the Project Manager): - Letter of Intent Reviewed by: Mikayla Hartford, P.E. Senior Engineer - Stormwater 719.339.5053 MikaylaHartford@elpasoco.com
Pikes Peak Regional Building Departmentreview 1May 19, 2026
Enumeration has no comments. Becky Allen PPRBD - Enumerations 719-799-2707
PCD Project Managerreview 1May 18, 2026
Review 1: EPC Planning Division has comments in green text boxes on the following documents: - Letter of Intent - Site Plan Drawing Reviewed by: Lacey Dean, Associate Planner laceydean2@elpasoco.com
PCD Administrative Noticereview 1May 11, 2026
On 05/11/2026, PCD mailed "Notice of Administrative Determination" letters for AL2611 to surrounding property owners within a 500-foot range (11 addresses). The potential date an administrative decision can be made is 05/25/2026. Copies of the notice, mailing labels, and selected range have been uploaded to the EDARP file. Cost of postage = $8.14 JM
Tri-Lakes-Monument Fire Protection Districtreview 1May 6, 2026
Monument Fire has not applicable Comments
Mountain View Electric Association, Inc.review 1May 6, 2026
MVEA has no objection to this application.
EPC Code Enforcementreview 1May 6, 2026
No comment