Flying Horse North Filing No. 8

Final plat SF2531 Active
Jurisdiction
El Paso County
Applicant
HR Green Inc. Blaine Perkins
County project manager
Ryan Howser
Filed
Oct 9, 2025
Parcel
5130000006
Map
Parcel boundaries: Colorado public parcel data · Basemap © OpenStreetMap contributors
Area map
See all Tri-Lakes projects on the map
Source record
El Paso County EDARP file

Documents (60)

Fire Protection ReportreviewSep 2, 2026
Final Plat DrawingsreviewSep 2, 2026
Traffic Impact StudyreviewSep 1, 2026
Deviation RequestreviewApr 9, 2026
PCM Applicability FormreviewApr 9, 2026
Drainage Report - FinalreviewApr 9, 2026
Final Plat DrawingsreviewJan 9, 2026
State Water FindingreviewJan 6, 2026
Letter of IntentreviewDec 19, 2025
GEC ResponsereviewDec 18, 2025
Drainage Report ResponsereviewDec 18, 2025
Drainage Report - FinalreviewDec 18, 2025
Traffic Impact StudyreviewDec 18, 2025
TIS response to commentsreviewDec 18, 2025
Deviation RequestreviewNov 24, 2025
PCM Applicability FormreviewNov 24, 2025
Soils & Geology ReportreviewNov 24, 2025
Landscape Plan drawingsreviewOct 22, 2025
Wastewater Treatment ReportreviewOct 21, 2025
Closures Sheet (Survey)reviewOct 21, 2025
Forestry Management PlanreviewOct 21, 2025
Natural Features ReportreviewOct 21, 2025
Fire Protection ReportreviewOct 21, 2025
Application/Petition FormreviewOct 21, 2025
Returned NoticesadditionalNov 25, 2025
Returned Notice - Received 11/17/2025
Selected RangeadditionalNov 3, 2025
Selected Range was 500 feet. JM
Mailing LabelsadditionalNov 3, 2025
Mailing Labels for the 16 surrounding property owners that received notices. Cost = $11.84. JM
Neighbor Notice & Vicinity MapadditionalNov 3, 2025
Notice of Application letters were mailed to surrounding property owners on 11/03/2025. JM

Agency review comments (91)

Comments returned by referral agencies during review, from the county's public EDARP file. Some agencies attach a letter instead of (or alongside) written comments.

EPC DPW Development Services - Engineeringreview 3Sep 17, 2026
DPW Engineering review 3 has comments on the following documents - Traffic Impact Study - Construction Drawings Engineering comments have been resolved on the following documents - Final Plat Drawings - Deviation Request - Financial Assurance Form Please include signatures on engineering documents with the next submittal. Review by Bret Dilts, PE bretdilts@elpasoco.com 719-520-6864
EPC DPW Development Services - Engineeringreview 3Sep 17, 2026
Drainage Report
View attached comment letter
EPC DPW Development Services - Engineeringreview 3Sep 17, 2026
GEC Plan
View attached comment letter
EPC DPW Development Services - Engineeringreview 3Sep 17, 2026
Construction Drawings
View attached comment letter
EPC DPW Development Services - Engineeringreview 3Sep 17, 2026
Traffic Impact Study
View attached comment letter
PCD Project Managerreview 3Sep 16, 2026
Review 3: PCD Planning Division has completed its review and has no further comments at this time.
County Attorney - Development Reviewreview 3Sep 15, 2026
1) Regarding the Detention Maintenance Agreement: a) Paragraph 6 needs to include the language in the prior draft indicating the County may enter onto the property and "shall have the right to seek reimbursement from the responsible Parties for its actual costs and expenses in performing the work." b) Regarding Exhibit B: if the easement is not granted over the entire property and is only over a portion of the property, then Exhibit B needs to clearly depict the portion of the property where the easement is granted. The map should visually depict the location of the easement in relation to the pond on the property. The easement must also abut a public road so the County has legal access. c) The signatory for the Metro District needs to reflect that the individual signing has authority to sign on behalf of the Metro District for Filing No. 8. Please delete the language "No. 1-5" on the signature block. 2) Regarding the Subdivision Improvements Agreement, because this is being signed administratively, the Clerk and Recorder does not need to attest (and his signature line should be deleted) but it will need to be notarized. Please modify signature block as follows: BOARD OF COUNTY COMMISSIONERS OF EL PASO COUNTY, COLORADO __________________________ By:________________________________________________ (Date Final Plat Approved) Meggan Herington, Executive Director Planning and Community Development Department Authorized signatory pursuant to LDC The foregoing instrument was acknowledged before me this _______ day of ______________, 20__, by __________________, Executive Director of El Paso County Planning and Community Development Department. Witness my hand and official seal. My commission expires: __________________ _________________________________________ Notary Public Approved as to form: ___________________________________ County Attorney’s Office ________________________________________________________________________________________________ Reviewed by: Erika Keech, Sr. County Attorney, erikakeech2@elpasoco.com.
Colorado Geological Surveyreview 3Sep 15, 2026
The available referral documents include the Final Plat (Edward-James Surveying, Inc., October 1, 2025), Construction Documents (HR Green, April 2, 2026), and other documents. The Soils and Geology Study (Entech Engineering, Inc., October 15, 2025) was provided in the previous submittals. We offer the following additional comments: 1. Note 29 of the plat states, “Groundwater monitoring is to be conducted for one year for lots within shallow groundwater areas which are in areas in which proposed floor levels are at least three feet above maximum anticipated groundwater levels.” CGS continues to recommend that the county require groundwater monitoring/observation holes at the Flying Horse North to be checked seasonally. 2. According to the updated plat, the lots that are affected by drainages and potentially shallow groundwater include: 1, 2, 7, 8, 20, 21, 30, 33, 45, 49, and 50. CGS notes that setbacks appear to be established and noted on the plans. Building footprints should be outside the setback areas. Provided Entech’s recommendations are strictly adhered to, CGS has no further comments. Submitted 9/15/2026 by Amy Crandall, Engineering Geologist, Colorado Geological Survey (303-384-2632 or acrandall@mines.edu)
Black Forest Fire Protection Districtreview 3Sep 14, 2026
Black Forest Fire Rescue has reviewed the submittal for Flying Horse North Filing No. 8. This review acknowledges the agreement reached during the previous meeting between Joe and the BFFR chiefs. The fire-protection water-supply method remains under discussion and is not approved by BFFR. The proposal to use the pressurized Sundance system, including Hydrants 17 and 21 and the existing pump-house source, requires BFFR review before it may replace the proposed cisterns. Provide documentation confirming the legal authority for BFFR and mutual-aid departments to access and use these water sources during an emergency. Identify responsibility for testing, maintenance, repairs, snow removal, vegetation control, and continuous access. Provide flow-test documentation for Hydrants 17 and 21 demonstrating a minimum uninterrupted flow of 250 gpm for two hours. The final fire-protection plan shall show approved travel routes and confirm that every parcel entrance is within two miles of an approved water source. All designated water-supply locations shall have approved all-weather apparatus access and operating areas. Hydrants shall remain visible, unobstructed, protected from vehicle damage, marked, and accessible year-round. Final connections, color coding, signs, and clearances shall meet BFFR requirements. If the system cannot meet the legal, flow, duration, distance, and access requirements, additional hydrants, cisterns, or another approved water supply may be required. Plat approval does not constitute final BFFR acceptance of the water-supply arrangement. Fire apparatus access roads shall maintain a minimum unobstructed width of 20 feet, vertical clearance of 13 feet 6 inches, an approved all-weather surface, grades not exceeding 10 percent unless specifically approved, and turning radii suitable for BFFR apparatus. A minimum unobstructed width of 26 feet shall be maintained near hydrants. Required access shall be completed before combustible construction begins. The proposed deviation for the length of Sandbagger Drive does not waive fire-code access requirements. The final road system shall provide approved emergency access, apparatus turnaround, and evacuation capability. Any gates shall have an approved Knox emergency-access system and shall not reduce the required width. BFFR may require additional access, road interconnection, or turnaround improvements. Flying Horse North Filing No. 8 is subject to the Colorado Wildfire Resiliency Code. The existing wildfire report does not replace CWRC review. Ground-truthing shall be completed and submitted to BFFR to establish the applicable hazard class. Each lot and structure shall comply with the assigned hazard-class requirements in effect when its permit is issued. All homes and accessory structures shall have an approved Class A roof covering or Class A roof assembly. Exterior walls, siding, eaves, soffits, decks, projections, doors, windows, vents, and other components shall use approved noncombustible, ignition-resistant, ember-resistant, or other CWRC-compliant materials. Vinyl siding and other combustible exterior materials are prohibited where disallowed by the assigned hazard class. Roof edges, eaves, soffits, attic vents, foundation vents, and other openings shall resist ember intrusion. Vent openings shall have approved ember-resistant protection or corrosion-resistant metal mesh with openings not exceeding 1/8 inch. Decks and similar projections shall use approved CWRC-compliant materials. Combustible storage beneath decks is prohibited, and required under-deck protection shall be provided. Combustible fencing shall not connect directly to a structure without an approved noncombustible transition. Maintain a noncombustible zone within five feet of each structure, including beneath decks and projections. Combustible mulch, firewood, stored materials, dead vegetation, and similar ignition sources are prohibited in this zone. Vegetation from 5 to 30 feet shall be spaced and maintained so it does not create a continuous fuel path to structures. Extended defensible space and natural grasses shall be maintained under the CWRC and approved wildfire mitigation plan. Vegetation along evacuation routes, apparatus roads, hydrants, pull-offs, and roadway shoulders shall be managed to reduce fire exposure and preserve access. The HOA or responsible entity shall maintain common-area defensible space, roadsides, emergency routes, hydrant areas, and other wildfire mitigation features. CWRC requirements shall be included in subdivision or recorded documents. Each building requires separate review under the CWRC, the adopted 2021 International Fire Code, and its adopted appendices. Required documentation and inspections shall be completed before final approval or occupancy. Changes to the lot layout, water supply, access, roads, wildfire mitigation plan, or proposed construction shall be resubmitted to BFFR.
EPC DPW Stormwaterreview 3Sep 8, 2026
Review 3: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following document(s) to be uploaded by others: - CDs - Drainage Report - GEC Plan EPC DPW Stormwater comments have been resolved on the following document(s): - PCM Applicability Form Reviewed by: Glenn Reese, P.E. Principal Engineer - Stormwater 719.675.2654 GlennReese@elpasoco.com
Pikes Peak Regional Building Departmentreview 3Sep 3, 2026
1. The following areas needs addressing corrected: Lot 42-14579 not 14529 Holmes Road, Lot 43-14629 not 14579 Homles Rd, Lot 44-14679 not 14629. Add Tract A -14696 Wedge Trail-place north of lot 34, add 14581 to lot 42 to the south end for a well site is still needed. Move 14511 Homes Road from lots 41 and move to Tract D-this is where it was assigned. 2. 50 Lot and 3 tract with addresses, total fees are $530.00. 3. Standard final plat comments apply. See prior comments for details. Amy Vanderbeek Enumerations Plans Examiner Pikes Peak Regional Building Department O: 719-327-2930 E: Amy@pprbd.org
EPC Parks Departmentreview 2Feb 5, 2026
El Paso County Parks Department Final Comments, 2nd Submittal - Please See Attached Documentation (Originally endorsed by the El Paso County Park Advisory Board on November 12, 2025)
View attached comment letter
Cherokee Metro Distreview 2Feb 4, 2026
Cherokee Metropolitan District does have a 24" Water line from Sundance Ranch that is in the general vicinity of the Flying Horse North development. Please see the attached image for reference. The development's water is being provided by drilling their own wells and no sanitary sewer treatment is needed from Cherokee M. District. No conflicts with Cherokee Metro District water infrastructure for this plan. No further review needed
View attached comment letter
Black Forest Fire Protection Districtreview 2Jan 28, 2026
I agree with El Paso county roland Peterson The Fire Protection Report notes that cisterns will be provided but cisterns are not shown on the Final Plat or the Construction Drawings. Where will the cisterns be located and how will they be constructed? The cisterns' compliance with NFPA 1142 and NFPA 22 can not be determined with the information provided. How will the cisterns be filled? Has the storage of water for fire protection been added to the State Water Finding?
EPC DPW Development Services - Engineeringreview 2Jan 23, 2026
DPW Engineering review 2 has comments on the following documents - Final Plat Drawings - Traffic Impact Study - Deviation Request - Construction Drawings - Financial Assurance Form Engineering comments have been resolved on the following documents - Drainage Report - Final Review by Bret Dilts, PE bretdilts@elpasoco.com 719-520-6864
EPC DPW Development Services - Engineeringreview 2Jan 23, 2026
Drainage Report
View attached comment letter
EPC DPW Development Services - Engineeringreview 2Jan 23, 2026
Financial Assurance Form
View attached comment letter
EPC DPW Development Services - Engineeringreview 2Jan 23, 2026
Construction Drawings
View attached comment letter
EPC DPW Development Services - Engineeringreview 2Jan 23, 2026
Deviation Request
View attached comment letter
EPC DPW Development Services - Engineeringreview 2Jan 23, 2026
Traffic Impact Study
View attached comment letter
EPC DPW Development Services - Engineeringreview 2Jan 23, 2026
Final Plat Drawings
View attached comment letter
EPC DPW Stormwaterreview 2Jan 22, 2026
PCM Applicability Form
View attached comment letter
EPC DPW Stormwaterreview 2Jan 22, 2026
GEC Plan
View attached comment letter
EPC DPW Stormwaterreview 2Jan 22, 2026
Review 2: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document(s): - CDs.......................(to be uploaded by Development Services engineer) - Drainage Report....(to be uploaded by Development Services engineer) - GEC Plan - PCM Applicability Form EPC DPW Stormwater comments have been resolved on the following document(s): - ESQCP - FAE - GEC Checklist - PCM O&M Manual - PCM Maintenance Agreement - SWMP - SWMP Checklist Reviewed by: Glenn Reese, P.E. Principal Engineer - Stormwater 719.675.2654 GlennReese@elpasoco.com
PCD Project Managerreview 2Jan 22, 2026
Review 2: PCD Planning Division has completed its review and has provided comments in green on the following documents: - Final Plat (to be uploaded by engineering)
Colorado Geological Surveyreview 2Jan 21, 2026
View attached comment letter
Colorado Geological Surveyreview 2Jan 21, 2026
View attached comment letter
Colorado Geological Surveyreview 2Jan 21, 2026
View attached comment letter
Colorado Geological Surveyreview 2Jan 21, 2026
View attached comment letter
County Attorney - Development Reviewreview 2Jan 15, 2026
Please prepare SIA, DMA and License Agreement for signatures. No additional comments from County Attorney – Development Review at this time. Reviewed by: Erika Keech, Sr. County Attorney, erikakeech2@elpasoco.com
Pikes Peak Regional Building Departmentreview 2Jan 13, 2026
1. Addresses have already been assigned. Please add the addresses to the plat. 2. Standard Final Plat comments: a. Enumerations will review the pre-plat (mylar) prior to plat for address placement, street names, and title block. b. A $10.00 per lot and tract platting fee will be due at the time of the review of the pre-plat, (two addresses per lot and tract). If an address is not needed on a tract then no fee applies. Check should be made out to PIKES PEAK REGIONAL BUILDING DEPARTMENT or PPRBD. As of December 5th 2023, the fee for all credit/debit cards has changed from the flat 2.95% fee to the following: Over the phone Credit/Debit Card payments will be 2.3% and In-Person Debit Card payments will be 1.5% (in-person only). Paid directly to the Enumerations Department. c. Pre-plat reviews can be reviewed via “pdf” or in-person. The pre-plat will be stamped by Enumerations for accuracy and returned to the applicant and the planner. All payments to be mailed to RBD via a check or credit card payment over the phone. Plats should not be recorded prior to Enumerations stamping the pre-plat and receiving payment of plat fees. If any pre-plat changes occur, even if changes do not apply to Enumerations, we still need to re-stamp the pre-plat. The Enumerations stamped pre-plat copy should match the recorded document minus a few signatures. If you would like an in-person review, please make an appointment on our website, https://www.pprbd.org/Home/BookAppt d. A copy of the final recorded plat is required prior to plan submittal for RESIDENTIAL. A copy of the final recorded plat is required prior to approval in the Enumerations department on any COMMERCIAL plan submittal. Please email the Enumerations staff member that reviewed your project. Amy@pprbd.org; Brent@pprbd.org; or BeckyA@pprbd.org Amy Vanderbeek Enumerations Plans Examiner Pikes Peak Regional Building Department O: 719-327-2930 E: Amy@pprbd.org
911 Authority - El Paso/Teller Countyreview 2Jan 12, 2026
No action for E911 on this submittal. Thank you. Justin
Mountain View Electric Association, Inc.review 1Nov 18, 2025
View attached comment letter
Mountain View Electric Association, Inc.review 1Nov 18, 2025
View attached comment letter
Mountain View Electric Association, Inc.review 1Nov 18, 2025
View attached comment letter
Mountain View Electric Association, Inc.review 1Nov 18, 2025
View attached comment letter
EPC Health Departmentreview 1Nov 17, 2025
View attached comment letter
EPC Health Departmentreview 1Nov 17, 2025
View attached comment letter
EPC Health Departmentreview 1Nov 17, 2025
View attached comment letter
EPC Health Departmentreview 1Nov 17, 2025
View attached comment letter
EPC Fire and Wildfire Program Managerreview 1Nov 14, 2025
The Fire Protection Report notes that cisterns will be provided but cisterns are not shown on the Final Plat or the Construction Drawings. Where will the cisterns be located and how will they be constructed? The cisterns' compliance with NFPA 1142 and NFPA 22 can not be determined with the information provided. How will the cisterns be filled? Has the storage of water for fire protection been added to the State Water Finding? Roland Peterson Fire Safety and Wildfire Mitigation Program Manager Planning & Community Development 719.520.6075 rolandpeterson@elpasoco.com
EPC DPW Development Services - Engineeringreview 1Nov 13, 2025
Final Drainage Report comments
View attached comment letter
EPC DPW Development Services - Engineeringreview 1Nov 13, 2025
Construction Drawings comments
View attached comment letter
EPC DPW Development Services - Engineeringreview 1Nov 13, 2025
Financial assurance estimate comments
View attached comment letter
EPC DPW Development Services - Engineeringreview 1Nov 13, 2025
Traffic Study Comments
View attached comment letter
EPC DPW Development Services - Engineeringreview 1Nov 13, 2025
Deviation Request comments
View attached comment letter
EPC DPW Development Services - Engineeringreview 1Nov 13, 2025
GEC Plan comments
View attached comment letter
EPC DPW Development Services - Engineeringreview 1Nov 13, 2025
Letter of Intent comments
View attached comment letter
EPC DPW Development Services - Engineeringreview 1Nov 13, 2025
Final Plat comments
View attached comment letter
PCD Project Managerreview 1Nov 13, 2025
V1: DMA
View attached comment letter
PCD Project Managerreview 1Nov 13, 2025
V1: SWMP Checklist
View attached comment letter
PCD Project Managerreview 1Nov 13, 2025
V1: SWMP
View attached comment letter
PCD Project Managerreview 1Nov 13, 2025
V1: O&M
View attached comment letter
PCD Project Managerreview 1Nov 13, 2025
V1: PCM form
View attached comment letter
PCD Project Managerreview 1Nov 13, 2025
V1: GEC Checklist
View attached comment letter
PCD Project Managerreview 1Nov 13, 2025
V1: ESQCP
View attached comment letter
PCD Project Managerreview 1Nov 13, 2025
V1: WSIS
View attached comment letter
PCD Project Managerreview 1Nov 13, 2025
V1: SEO letter
View attached comment letter
PCD Project Managerreview 1Nov 13, 2025
V1: Soils & Geology report
View attached comment letter
PCD Project Managerreview 1Nov 13, 2025
V1: Noxious weed management plan
View attached comment letter
PCD Project Managerreview 1Nov 13, 2025
V1: Natural gas commitment letter
View attached comment letter
PCD Project Managerreview 1Nov 13, 2025
V1: CAO water finding
View attached comment letter
PCD Project Managerreview 1Nov 13, 2025
Review 1: PCD Planning Division has completed its review and has provided comments in green on the following documents: - CAO Water finding - Natural Gas commitment letter - Noxious Weed Management Plan - Soils & Geology Report - SEO Water Finding - WSIS - LOI (to be uploaded by engineering) - Final Plat (to be uploaded by engineering)
Colorado Geological Surveyreview 1Nov 13, 2025
See attached comments.
View attached comment letter
EPC DPW Stormwaterreview 1Nov 13, 2025
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following document(s) to be uploaded by the PM: - CDs.......................(to be uploaded by Development Services engineer) - Drainage Report....(to be uploaded by Development Services engineer) - ESQCP - FAE........................(to be uploaded by Development Services engineer) - GEC Plan...............(to be uploaded by Development Services engineer) - GEC Checklist - PCM Applicability Form - PCM Maintenance Agreement - PCM O&M Manual - SWMP - SWMP Checklist Please provide the following document(s) upon resubmittal (the planner will need to send an upload request): - PCM - MHFD Detention Calcs or SDI Form Reviewed by: Glenn Reese, P.E. Principal Engineer - Stormwater 719.675.2654 GlennReese@elpasoco.com
Colorado Springs Public Worksreview 1Nov 13, 2025
Traffic Engineering has no comments on this item. Zaker Alazzeh, P.E. Traffic Engineering Manager/Deputy City Traffic Engineer City of Colorado Springs (719) 385-5468 Zaker.Alazzeh@coloradosprings.gov
Parks Advisory Boardreview 1Nov 13, 2025
El Paso County Parks Department, Final Comments - Please See Attached Documentation (Endorsed by the El Paso County Park Advisory Board on November 12, 2025)
View attached comment letter
Colorado Springs Public Worksreview 1Nov 10, 2025
EDRD has no comments on this item. Reviewed by Hao Vo, P.E. hao.vo@coloradosprings.gov
EPC DPW Development Services - Engineeringreview 1Nov 10, 2025
DPW Engineering review 1 has comments on the following documents - Final Plat Drawings - Deviation Request - Traffic Impact Study - Drainage Report - Final - Construction Drawings - Financial Assurance Form Review by Bret Dilts, PE bretdilts@elpasoco.com 719-520-6864
County Attorney - Development Reviewreview 1Nov 10, 2025
See edits to DMA. No comments with respect to SIA, License Agreement, Articles of Incorporation or HOA Bylaws. Reviewed by: Erika Keech, Senior County Attorney, erikakeech2@elpasoco.com.
View attached comment letter
Colorado Division of Water Resourcesreview 1Nov 5, 2025
View attached comment letter
Colorado Division of Water Resourcesreview 1Nov 5, 2025
View attached comment letter
Colorado Division of Water Resourcesreview 1Nov 5, 2025
View attached comment letter
Colorado Division of Water Resourcesreview 1Nov 5, 2025
View attached comment letter
EPC Parks Departmentreview 1Nov 5, 2025
El Paso County Parks Department, Preliminary Comments - Please See Attached Documentation (To be presented to the El Paso County Park Advisory Board for their consideration and endorsement on Wednesday, November 12th, 2025)
View attached comment letter
PCD Administrative Noticereview 1Nov 3, 2025
On 11/03/2025, PCD mailed "Notice of Application" letters to surrounding property owners within a 500-foot range (16 addresses). Copies of the notice, mailing labels, and selected range have been uploaded to the EDARP file. Cost of postage to be billed to the applicant = $11.84. JM
Colorado Springs Utilities, Dev, Svc.(includes water resources)review 1Nov 3, 2025
Based on Note # 22, Colorado Springs Utilities has no comment on this application.
Black Forest Fire Protection Districtreview 1Oct 30, 2025
Black Forest Fire is currently working with our Fire Protection Engineer and Peregrine Fire on cistern sizes, location and type to sign off on what will work best for water supply in this area. Herdt
EPC Environmental Servicesreview 1Oct 30, 2025
View attached comment letter
EPC Environmental Servicesreview 1Oct 30, 2025
View attached comment letter
EPC Environmental Servicesreview 1Oct 30, 2025
View attached comment letter
EPC Environmental Servicesreview 1Oct 30, 2025
View attached comment letter
Colorado Springs Planning & Community Developmentreview 1Oct 29, 2025
City Planning has no comment.
Pikes Peak Regional Building Departmentreview 1Oct 28, 2025
1. Moving forward with addressing for this project, please clarify if Dogleg Court is being reconfigured, that was previously shown. 2. For lots 31-37 add the street name on sheets 4-5. Do you need addresses for tracts B & C, that were not seen prior. 3. After clarifying the question regarding Dogleg Court, the addresses should be add to the plat. Amy Vanderbeek Enumerations Plans Examiner Pikes Peak Regional Building Department O: 719-327-2930 E: Amy@pprbd.org
911 Authority - El Paso/Teller Countyreview 1Oct 28, 2025
Comments for E911 as follows: Streetnames previously approved. Wedge Trl is not depicted on plan drawings, please notate the streetname on applicable pages. Thank you Justin
Colorado Department of Transportation - Pueblo Officereview 1Oct 27, 2025
Please see the attached letter for CDOT's comments regarding this development.
View attached comment letter
Academy SD 20 Building Fundreview 1Oct 27, 2025
Academy District 20 is in receipt of File # SF2531 for approval of the Flying Horse North Filing No. 8 Final Plat. The District is requesting fees in lieu of land dedication per the existing County Code for all residential units within this development. The District is experiencing ongoing residential development. The District gained approximately 13,650 new residential units between 2018 and 2025 which included 5,650 Single Family, 1,225 Single Family Attached, and 6,800 Apartments as reported to the District by local developers. During that same timeframe, the District only experienced a total membership increase of 23 students. This information is updated annually in October. A drop in the birth rate plus the significant increase in the cost of housing has slowed student growth in the District. The District is able to serve each student who is a resident of District 20. If you need additional information, please contact me. Don Smith Planning Consultant
Black Forest Land Use Committeereview 1Oct 27, 2025
The Black Forest Land Use Committee has reviewed this proposal and recommends approval.
Colorado Parks and Wildlifereview 1Oct 24, 2025
Colorado Parks and Wildlife (CPW) has reviewed the plans for Flying Horse North Filing No. 8 in El Paso County. Colorado Parks and Wildlife (CPW) is familiar with the site and has commented on the overall Flying Horse project area in the past. CPW recommends referring to those previous comments. Based on the location and proposed actions, CPW anticipates that this project's impacts on the wildlife resource would be negligible if our previous comments are taken into consideration. We appreciate being allowed to comment. Please feel free to contact District Wildlife Manager, Aaron Berscheid, should you have any questions or require additional information at 719-439-9601 or via email at aaron.berscheid@state.co.us
RBD Floodplainreview 1Oct 23, 2025
site is not in the floodplain , no comment
County Attorney - Waterreview 1Oct 23, 2025
Water sufficiency is being reviewed with the PUDSP amendment.

Timeline