Foursquare at Sterling Ranch East Filing No. 1
158single-family attached lots to be served by Central water, and central sewer
- Location
- east of Sandcreek Channel
- Jurisdiction
- El Paso County
- Applicant
- Classic Consulting Engineers & Surveyors, LLC Kyle Campbell
- Land owner (assessor)
- CLASSIC SRJ LAND LLC (state record)
- County project manager
- Kari Parsons
- Filed
- Dec 7, 2022
- Parcels
- 5233000022, 5230000023, 5233000017, 5233100001
- Map
-
Parcel boundaries: Colorado public parcel data · Basemap © OpenStreetMap contributors
- Area map
- See all Tri-Lakes projects on the map
- Source record
- El Paso County EDARP file
Documents (69)
Adjacent Property Owner Notification (Includes letter and certified mailing receipts)reviewDec 8, 2022
private Detention Basin/Stormwater Quality Best Management Practice Maintenance Agreement and Easement - 224073556additionalSep 27, 2024
Neighbor NoticeadditionalSep 19, 2023
PCD mailed 25 notifications to surrounding property owners on 9/19/2023. MB
Agency review comments (102)
PCD Engineering Divisionreview 6Sep 17, 2024
All other engineering comments have been addressed. Documents have been forwarded to engineering manager for approval.
Please set up pre-construction with Brad Walters, Inspections Supervisor, @ bradwalters@elpasoco.com once plans have been approved.
Charlene Durham - 719-520-7951
Colorado Springs Utilities, Dev, Svc.(includes water resources)review 5Sep 13, 2024
Add the following note to the General Notes on the cover sheet: All easements that are dedicated hereon for public utility purposes related to gas and electric shall be subject to those terms and conditions as specified in the instrument recorded at Reception Number 224026331 of the records of El Paso County, Colorado. All other easements or interests of record affecting any of the platted property depicted hereon shall not be affected and shall remain in full force and effect.
PCD Engineering Divisionreview 5Sep 12, 2024
Engineering has the following comments:
- Please provide copy of signed utility plans.
- Provide CAD drawings.
All other engineering comments have been addressed.
Please set up pre-construction with Brad Walters, Inspections Supervisor, @ bradwalters@elpasoco.com once plans have been approved.
Charlene Durham - 719-520-7951
PCD Project Managerreview 5Sep 12, 2024
Please complete the fee section on the Mylar. Add the districts, basin names dollar amounts credits to be used etc. Please complete the PID resolution/reception numbers on mylar.
To record Plat: All contracts must be signed completed w/ exhibits, all Taxes paid and TAX certificate from Treasures office handed in at recording, title work at recording; collateral; fees to paid; PPRBD stamp; letter from Metro District authorizing Credits for drainage and bridge. Any Park Lands agreements should be noted in Fees section with dollar amount to be credited and the reception number /resolution of Parkland agreement.
County Attorney - Development Reviewreview 6Sep 11, 2024
Signatures on SIA and Detention Maintenance Agreement provided by email.
EPC Stormwater Reviewreview 5Sep 10, 2024
Review 4: EPC DPW Stormwater comments have been resolved on the following documents:
- CDs
- Drainage Report
EPC DPW Stormwater has no further comments. Planner: no re-review necessary.
Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer III
GlennReese@elpasoco.com
Colorado Springs Public Worksreview 5Aug 29, 2024
Engineering Development Review has no comments on this item.
Joel Dagnillo, P.E.
Engineer III
Engineering Development Review
City of Colorado Springs
(719)385-5412
Joel.dagnillo@coloradosprings.gov
County Attorney - Development Reviewreview 5Aug 29, 2024
1. Signature to DMA attached.
2. Please confirm that Elite Properties is or will be the property owner at the time of plat recording. They are not listed as the owner on the plat.
3. I will sign the SIA once the FAE amount in paragraph 1 is filled in.
Colorado Springs Public Worksreview 5Aug 27, 2024
Traffic Engineering has no comments on this item.
Brian Shevock
Public Works/Traffic Engineering
Traffic Engineer
City of Colorado Springs
brian.shevock@coloradosprings.gov
(719) 385-7620
Colorado Springs Utilities, Dev, Svc.(includes water resources)review 5Aug 27, 2024
Appears to be missing CSU's Terms and Conditions statement via Rec. No. 224026331
PCD Engineering Divisionreview 4Dec 5, 2023
Engineering has the following comments:
See comment memo (link at left) and redlines.
The following items need to be revised and resubmitted:
- Final Drainage Report
- Construction Drawings including Grading and Erosion Control Plan
- Responses to comment memo
Comments have been addressed on the following documents:
- Letter of Intent
- Final Plat
- Utility CDs
- FAE
- PDB/BMP Agreement (see previous redlines)
- SIA (see previous redlines)
-- Jeff Rice - 719-520-7877
Charlene Durham - 719-520-7951
EPC Stormwater Reviewreview 4Dec 4, 2023
Review 3: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- CDs........................(to be uploaded by others)
- Drainage Report.....(to be uploaded by others)
Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer III
GlennReese@elpasoco.com
PCD Project Managerreview 4Dec 4, 2023
Please sign and stamp all engineering docs for approval.
PCD Project Managerreview 4Dec 4, 2023
Planning Staff has requested the underdrain contract template for DPW staff to be provided. I will email it to you once I have a copy, per the plat note.
PCD Project Managerreview 4Dec 4, 2023
Please schedule the PID inclusion with Lori, and input PID reception number onto Plat.
PCD Project Managerreview 4Dec 4, 2023
Minor Plat comment ( a note was deleted).
County Attorney - Development Reviewreview 4Nov 29, 2023
No further comments.
Pikes Peak Regional Building Departmentreview 4Nov 28, 2023
1. Error on lot 1 address-should be 9693, lot 3 should be 9673. I need to move 4 addresses from lots 139-142. Lot 139-change to 8788, 140-8794, 141-8800, & 142-8806 Maricopa Court. Please add tract H address-9506 Rio Rancho Trail.
2. Platting fees are for 158 lots & 9 tracts, total $1,670.00. Standard final plat fee apply, see prior comments.
No further comments.
Amy Vanderbeek
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2930 E: Amy@pprbd.org
Parks Advisory Boardreview 4Nov 17, 2023
El Paso County Parks and Community Services Department Final Comments, Submittal #3 - Please See Attached Documents (Originally PAB Endorsed 01/11/2023)
Black Forest Fire Protection Districtreview 4Nov 13, 2023
Please see BFFRPD Policy statement below for our standard comments into EDARP. Additionally, I question the authenticity of the Fire Commitment Letter and the Fire Protection Report.
Our position is that if a property owner pays property taxes to BFFRPD we will respond. However, the Fire Commitment Letter appears to be old and revised by a third party.
The Fire Protection Report has such antiquated data, also indicating an old report merely recycled.
Applicants shall demonstrate full compliance and conformance with El Paso County’s adopted Land Development Code (LDC), Engineering Criteria Manual (ECM), adopted International Fire Code (IFC), and all other adopted codes, provisions, or statutes that impact fire safety to include access/egress, water supply, hardening of structures, addressing, fire protection systems, etc. The applicant shall submit a comprehensive fire protection report from a qualified fire protection engineer that is licensed as a Professional Engineer (PE) by the Colorado State Board of Registration for Professional Engineers to demonstrate conformance to all requirements. Furthermore, the District does not support any waivers or variances that negatively impact any fire safety provisions including access/egress, water supply, hardening of structures, addressing, fire protections systems, etc.
PCD Engineering Divisionreview 3Sep 20, 2023
Engineering has the following comments:
See comment memo (link at left) and redlines.
The following items need to be revised and resubmitted:
- Letter of Intent
- Final Plat
- Final Drainage Report
- Construction Drawings including Grading and Erosion Control Plan
- Utility CDs
- FAE
- PDB/BMP Agreement (see previous redlines)
- SIA (see previous redlines)
- Responses to comment memo
- Agreements in Word format (2) (and license agreement if needed)
-- Jeff Rice - 719-520-7877
County Attorney - Development Reviewreview 3Sep 20, 2023
No further comments from County Attorney - Development Review.
PCD Administrative Noticereview 3Sep 19, 2023
PCD mailed 25 notifications to surrounding property owners on 9/19/2023. MB
PCD Project Managerreview 3Sep 19, 2023
Verify Pond amenities (trail-meandering sidewalk and revegetation) Tract I (east of lots) are included in FAE.
PCD Project Managerreview 3Sep 19, 2023
Letter of Intent- PUDSP project is now approved- POND sidewalk and meandering trail openspace is to be developed with this plat.
PCD Project Managerreview 3Sep 19, 2023
FAE w / graphic from PUD to demonstrate sidewalk, meandering trail sidewalk
PCD Project Managerreview 3Sep 19, 2023
NEW Policy- ALL PLATS will be required to identify the utility providers and state that the developer shall install the utilities to the edge of the lot.... (WELL AND SEPTC excluded) . Utilities are not collateralized in most cases. Add utilities installed by developer to edge of lot to the utilities plat note please.
Please schedule PID inclusion application with Lori for the BOCC.
Colorado Springs Public Worksreview 3Sep 13, 2023
Engineering Development Review has no comments on this item.
Joel Dagnillo, P.E.
Engineering Development Review
City of Colorado Springs
(719)385-5412
Joel.dagnillo@coloradosprings.gov
Colorado Springs Public Worksreview 3Aug 29, 2023
Traffic Engineering has no comments on this item.
Zaker Alazzeh, P.E.
Traffic Engineering Manager/Deputy City Traffic Engineer
City of Colorado Springs
(719) 385-5468
Zaker.Alazzeh@coloradosprings.gov
Parks Advisory Boardreview 2May 3, 2023
El Paso County Parks and Community Services Final Comments, 2nd Submittal - Please See Attached Documents (PAB Endorsed 01/11/2023)
PCD Project Managerreview 2Apr 24, 2023
Please verify the Subdivisions summary sheet for the plat matches the PUD, if this is one filing.
PCD Engineering Divisionreview 2Apr 21, 2023
(PDB/BMP Agreement redlines)
PCD Engineering Divisionreview 2Apr 21, 2023
Engineering has the following comments:
See comment memo (link at left) and redlines.
The following items need to be revised and resubmitted:
- Letter of Intent
- Legal Description (if Sterling Ranch Road ROW and Tract I change)
- Final Plat
- TIS
- Final Drainage Report
- Construction Drawings including Grading and Erosion Control Plan
- Utility CDs (see previous redlines)
- FAE
- PDB/BMP Agreement
- SIA
- Responses to comment memo
- Agreements in Word format (2) (and license agreement if needed)
-- Jeff Rice - 719-520-7877
EPC Stormwater Reviewreview 2Apr 18, 2023
Review 2: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- CDs........................(to be uploaded by Charlene with both of our comments)
- Drainage Report....(to be uploaded by Charlene with both of our comments)
Please provide the following documents upon resubmittal (ask the planner to send an upload request). This was also requested with Review 1.
- MS4 Post Construction Form
EPC DPW Stormwater comments have been resolved on the following documents:
- FAE
- GEC Checklist
- O&M Manual
- PBMP Applicability Form
- Private Detention Basin / Stormwater Quality BMP Maintenance Agreement
- SWMP
Please submit the following signed document for approval:
- PBMP Applicability Form
Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer III
GlennReese@elpasoco.com
County Attorney - Waterreview 2Apr 18, 2023
Finding of water supply sufficiency requested with preliminary plan and will not be reviewed with this application.
County Attorney - Development Reviewreview 2Apr 18, 2023
Comments to Detention Maintenance Agreement from 1/12/23 remain unaddressed.
Mountain View Electric Association, Inc.review 2Apr 13, 2023
See comment letter dated December 19, 2022. No additional comments at this time.
Colorado Springs Public Worksreview 2Apr 13, 2023
Engineering Development Review has no comments on this item.
Joel Dagnillo, P.E.
Engineering Development Review
City of Colorado Springs
(719)385-5412
Joel.dagnillo@coloradosprings.gov
Pikes Peak Regional Building Departmentreview 2Apr 11, 2023
1. The addresses will need to be added to the plat once received.
2. Standard Final Plat comments:
a. Enumerations will review the mylar prior to plat for address placement, street names, and title block.
b. A $10.00 per lot and tract platting fee will be due at the time of the review of the mylar, (two addresses per lot and tract). If an address is not needed on a tract then no fee applies. Check should be made out to PIKES PEAK REGIONAL BUILDING DEPARTMENT or PPRBD. Paid directly to the Enumerations Department. As of September 28th, 2022, an additional over the phone transaction fee of 2.95% of the total transaction will apply for any credit card payment.
c. A copy of the final recorded plat is required prior to plan submittal for RESIDENTIAL. A copy of the final recorded plat is required prior to approval in the Enumerations department on any COMMERCIAL plan submittal. Amy@pprbd.org (Please email the Enumerations staff that reviewed your project).
d. Mylar reviews can be reviewed via “pdf”. The mylar will be stamped by Enumerations for accuracy and returned to the applicant and the planner. All payments to be mailed to RBD via a check or credit card payment over the phone. Plats should not be recorded prior to Enumerations receiving payment. If you would like an in-person review, please make an appointment on our website, https://www.pprbd.org/Home/BookAppt
Amy Vanderbeek
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2930 E: Amy@pprbd.org
Pikes Peak Regional Building Departmentreview 2Apr 11, 2023
1. The addresses will need to be added to the plat once received.
2. Standard Final Plat comments:
a. Enumerations will review the mylar prior to plat for address placement, street names, and title block.
b. A $10.00 per lot and tract platting fee will be due at the time of the review of the mylar, (two addresses per lot and tract). If an address is not needed on a tract then no fee applies. Check should be made out to PIKES PEAK REGIONAL BUILDING DEPARTMENT or PPRBD. Paid directly to the Enumerations Department. As of September 28th, 2022, an additional over the phone transaction fee of 2.95% of the total transaction will apply for any credit card payment.
c. A copy of the final recorded plat is required prior to plan submittal for RESIDENTIAL. A copy of the final recorded plat is required prior to approval in the Enumerations department on any COMMERCIAL plan submittal. Amy@pprbd.org (Please email the Enumerations staff that reviewed your project).
d. Mylar reviews can be reviewed via “pdf”. The mylar will be stamped by Enumerations for accuracy and returned to the applicant and the planner. All payments to be mailed to RBD via a check or credit card payment over the phone. Plats should not be recorded prior to Enumerations receiving payment. If you would like an in-person review, please make an appointment on our website, https://www.pprbd.org/Home/BookAppt
Amy Vanderbeek
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2930 E: Amy@pprbd.org
Colorado Geological Surveyreview 2Apr 10, 2023
CGS acknowledges Note 30 of the Final Plat (revised 3/22/2023): Soil and Geology Conditions: Geologic hazard note – Final Plat: No Basements are allowed in the Foursquare at Sterling Ranch Development. CGS has no further comments or objection.
Reviewed on 4/10/2023 by Amy Crandall, Engineering Geologist (acrandall@mines.edu, 303-384-2632)
Colorado Division of Water Resourcesreview 2Apr 5, 2023
The water supply demand and source does not appear to have changed. Please refer to our comments dated December 19, 2022 (attached).
911 Authority - El Paso/Teller Countyreview 2Apr 3, 2023
Comments for E911 as follows:
Idaho Falls Dr – Acceptable and reserved for this project.
Salt Lake Way – Acceptable and reserved for this project.
Estes Park Path – Acceptable and reserved for this project.
Pagosa Springs Pl – Acceptable and reserved for this project.
Rio Rancho Trl – Acceptable and reserved for this project.
Maricopa Ct – Acceptable and reserved for this project.
Thank you
Justin
Colorado Parks and Wildlifereview 2Mar 30, 2023
CPW appreciates the opportunity to comment. CPW has previously commented on the entirety of the Sterling Ranch Development area and would refer this project to those previous comments. Reading the specifics about Foursquare at Sterling Ranch East Filing No. 1, CPW believes that the impacts to wildlife will be negligible.
For any questions or concerns please contact Aaron Berscheid at 719-439-9601 or at aaron.berscheid@state.co.us
EPC Parks Departmentreview 2Mar 27, 2023
El Paso County Parks and Community Services Final Comments, 2nd Submittal - Please See Attached Documents (PAB Endorsed 01/11/2023)
Academy SD 20 Building Fundreview 2Mar 27, 2023
Academy District 20 is in receipt of File# SF2236 for approval of the FourSquare at Sterling Ranch East Filing No. 1.
Academy District 20 is requesting land dedication in lieu of fees per the existing El Paso County Code for all residential development within the Sterling Ranch Sketch Plan located within District boundaries as previously requested for all residential development within Sterling Ranch. The District is requesting that fees NOT BE collected as per previous responses regarding Sterling Ranch. The District is aware that Classic Homes is assuming the development of Sterling Ranch and that 2 school sites will be reserved within the Revised Sketch Plan. The District has been in discussions with Classic Homes regarding this filing; however, an agreement regarding the school sites between Classic Homes, El Paso County, and District 20 has not been finalized for the District 20 Board of Education to consider. Any agreement that District 20 would enter into must first be approved by the Board of Education. The District intends to utilize the land credits for ALL of Sterling Ranch in the future to pay for the sites being proposed by Classic Homes.
If you need additional information or clarification, please contact me.
Don Smith
Planning Consultant
Colorado Springs Public Worksreview 2Mar 23, 2023
Traffic Engineering has no comments on this item.
Zaker Alazzeh, P.E.
Traffic Engineering Manager/Deputy City Traffic Engineer
City of Colorado Springs
(719) 385-5468
Zaker.Alazzeh@coloradosprings.gov
PCD Engineering Divisionreview 1Jan 26, 2023
(Utility CD redlines summary)
PCD Project Managerreview 1Jan 26, 2023
Engineering will upload the redlines. Please add the administrative plat approval request to the LOI
PCD Engineering Divisionreview 1Jan 26, 2023
PCD-Engineering has the following comments:
See comment memo (link at left) and redlines.
The following items need to be revised and resubmitted:
- Letter of Intent
- Legal Description (if Sterling Ranch Road ROW and Tract I change)
- Final Plat
- TIS
- Final Drainage Report
- Construction Drawings including Grading and Erosion Control Plan
- Utility CDs
- FAE
- ESQCP
- PDB/BMP Agreement
- PBMP O&M Manual
- SIA
- Other Stormwater items
Also provide the following:
- Responses to redlines and comment memo
- Agreements in Word format
-- Jeff Rice - 719-520-7877
PCD Project Managerreview 1Jan 26, 2023
Please re-evaluate the letter of intent in regard to useable open space; the Parks department has provided additional comments on the subject. Consistency with the PUD is required.
PCD Project Managerreview 1Jan 26, 2023
Please upload the version 2 noise study from the corresponding Four Square PUDSP for the noise study. Please see LOI and modify.
EPC Stormwater Reviewreview 1Jan 24, 2023
Detention Maintenance Agreement
EPC Stormwater Reviewreview 1Jan 24, 2023
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- CDs........................(to be uploaded by PM with PCD comments)
- Drainage Report...(to be uploaded by PM with PCD comments)
- FAE.......................(to be uploaded by PM with PCD comments)
- GEC Checklist
- O&M Manual
- PBMP Applicability Form
- Private Detention Basin / Stormwater Quality BMP Maintenance Agreement
- SWMP
Please provide the following documents upon resubmittal (ask the planner to send an upload request):
- MS4 Post Construction Form
Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer III
GlennReese@elpasoco.com
County Attorney - Development Reviewreview 1Jan 12, 2023
1. Proposed edits to Detention Maintenance Agreement attached.
2. Please submit directly to County Attorney's office a Word version of the subdivision legal description for processing of the PID petition.
County Attorney - Development Reviewreview 1Jan 12, 2023
Proposed edits to SIA attached.
Parks Advisory Boardreview 1Jan 12, 2023
El Paso County Community Services / Parks Final Comments - Please See Attached Documents (PAB Endorsed on 01/11/2023)
Black Forest Fire Protection Districtreview 1Jan 4, 2023
No additional comments.
Academy SD 20 Building Fundreview 1Jan 4, 2023
Academy District 20 is requesting land dedication in lieu of fees per the existing El Paso County Code for all residential development within the Sterling Ranch Sketch Plan located within District boundaries as previously requested for all residential development within Sterling Ranch. The District is requesting that fees NOT BE collected as per previous responses regarding Sterling Ranch. The District is aware that Classic Homes is assuming the development of Sterling Ranch and that 2 school sites will be reserved within the Revised Sketch Plan. The District has been in discussions with Classic Homes regarding this filing; however, an agreement regarding the school sites between Classic Homes, El Paso County, and District 20 has not been finalized for the District 20 Board of Education to consider. Any agreement that District 20 would enter into must first be approved by the Board of Education. The District intends to utilize the land credits for ALL of Sterling Ranch in the future to pay for the sites being proposed by Classic Homes.
If you need additional information or clarification, please contact me.
Don Smith
Planning Consultant
Colorado Geological Surveyreview 1Dec 29, 2022
Entech Engineering’s revised September 15, 2022 soil and geology report makes appropriate preliminary recommendations for mitigating the site’s hazards. The Construction Drawings (Classic Consulting, 9/19/2022) shows that the area of potentially unstable slopes will be regraded, and most of the site will be filled. Provided Entech’s recommendations are strictly adhered to, CGS has no objection to approval. We offer the following comments and recommendations.
1. Entech states (page 4), “The proposed housing will be constructed with crawlspaces; no basements are proposed.” CGS agrees with Entech (page 11), “A minimum separation of 3 feet between foundation components and groundwater levels are recommended.” CGS recommends adding a note to the plans stating that no basements are permitted in the Foursquare at Sterling Ranch East development, similar to other Sterling Ranch developments.
Reviewed on 12/29/2022 by Amy Crandall, Engineering Geologist (acrandall@mines.edu, 303-384-2632)
Colorado Springs Public Worksreview 1Dec 29, 2022
Engineering Development Review has no comment on this item.
Joel Dagnillo, P.E.
Engineer III
Engineering Development Review
City of Colorado Springs
(719)385-5412
Joel.dagnillo@coloradosprings.gov
Colorado Springs Utilities, Dev, Svc.(includes water resources)review 1Dec 21, 2022
Utilities Development Services has no comments on this application.
Colorado Parks and Wildlifereview 1Dec 21, 2022
Colorado Parks and Wildlife (CPW) has reviewed the plans for Foursquare at Sterling Ranch East Filing No. 1 in El Paso County, Colorado. CPW is in receipt of the above referenced permit application and is familiar with the site. CPW has commented on the plans for the entire Sterling Ranch Area and comments for that project can be referenced in previous land use comments.
We appreciate being given the opportunity to comment. Please feel free to contact District Wildlife Manager, Aaron Berscheid, should you have any questions or require additional information at 719-439-9601 or via email at aaron.berscheid@state.co.us
Mountain View Electric Association, Inc.review 1Dec 19, 2022
See attached comments
EPC Parks Departmentreview 1Dec 16, 2022
El Paso County Community Services / Parks Preliminary Comments - Please See Attached Documents (To be presented to the PAB for endorsement 01/11/2023)
County Attorney - Waterreview 1Dec 16, 2022
County Attorney’s Office will review for water sufficiency following receipt of findings from the Colorado Division of Water Resources. Thank you.
Colorado Springs Public Worksreview 1Dec 14, 2022
Traffic Engineering has no comments on this item.
Zaker Alazzeh, P.E.
Traffic Engineering Manager/Deputy City Traffic Engineer
City of Colorado Springs
(719) 385-5468
Zaker.Alazzeh@coloradosprings.gov
Pikes Peak Regional Building Departmentreview 1Dec 14, 2022
1. Street names pending replacements; Catalina Dr. & Catalina Foothills Dr.. All street suffixes must change per El Paso /Teller County E-9-1-1 Authority.
2. Standard Final Plat comments apply. New comment- As of September 28th, 2022, an additional over the phone transaction fee of 2.95% of the total transaction will apply for any credit card payment.
3. Is this project within Colorado Springs Utilities area for gas?
Amy Vanderbeek
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2930 E: Amy@pprbd.org
911 Authority - El Paso/Teller Countyreview 1Dec 13, 2022
Comments for E911 as follows:
Multiple adjustments needed for suffixes.
New streetname needed to replace Catalina Dr/Catalina Foothills Dr.
Idaho Falls Dr - Available
Boulder City Pl – Available – Suffix should be St or Dr
Estes Park Rd – Available – Suffix should be Court, Place, Circle, Way, Terrace, Lane, Loop, Trail, or Path
Salt Lake Dr – Available – Suffix should be Court, Place, Circle, Way, Terrace, Lane, Loop, Trail, or Path
Pagosa Springs Dr - Available – Suffix should be Court, Place, Circle, Way, Terrace, Lane, Loop, Trail, or Path
Rio Rancho Rd - Available – Suffix should be Court, Place, Circle, Way, Terrace, Lane, Loop, Trail, or Path
Catalina Dr – Not available - Existing road name
Catalina Foothills Dr - Not acceptable - exceeds character limit
Thank you
Justin
Timeline
- Sep 18, 2024Project Ready for Approval requests. Review Comment period is complete.
- Sep 17, 2024Request for Review Comments returned by PCD Engineering Division
- Sep 17, 2024Submission Triaged
- Sep 16, 2024Submission received from Applicant
- Sep 16, 2024Submission request sent to Applicant
- Sep 13, 2024Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
- Sep 12, 2024Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Gilbert LaForce on behalf of PCD Engineering Division
- Sep 12, 2024Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Engineering Manager on behalf of PCD Engineering Division
- Sep 12, 2024Submission Triaged
- Sep 12, 2024Submission received from Applicant
- Sep 12, 2024Submission request sent to Applicant
- Sep 12, 2024Submission request sent to Applicant
- Sep 12, 2024Request for Review Comments returned by PCD Engineering Division
- Sep 12, 2024Request for Review Comments returned by PCD Project Manager
- Sep 11, 2024Submission Triaged
- Sep 11, 2024Submission received from Applicant
- Sep 11, 2024Submission request sent to Applicant
- Sep 11, 2024Request for Review Comments returned by County Attorney - Development Review
- Sep 10, 2024Request for Review Comments returned by EPC Stormwater Review
- Sep 3, 2024Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Lori Seago on behalf of County Attorney - Development Review
- Sep 3, 2024Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Erika Keech on behalf of County Attorney - Development Review
- Sep 3, 2024Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by April Willie on behalf of County Attorney - Development Review
- Sep 3, 2024Submission Triaged
- Aug 30, 2024Submission received from Applicant
- Aug 30, 2024Request for Review Comments returned by Colorado Springs Public Works
- Aug 29, 2024Submission request sent to Applicant
- Aug 29, 2024Request for Review Comments returned by County Attorney - Development Review
- Aug 26, 2024Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Lori Seago on behalf of County Attorney - Development Review
- Aug 26, 2024Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Erika Keech on behalf of County Attorney - Development Review
- Aug 26, 2024Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by April Willie on behalf of County Attorney - Development Review
- Aug 26, 2024Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by LBS Review on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
- Aug 26, 2024Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
- Aug 26, 2024Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Zaker Alazzeh on behalf of Colorado Springs Public Works
- Aug 26, 2024Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Rae Carlson on behalf of Colorado Springs Public Works
- Aug 26, 2024Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Patrick Morris on behalf of Colorado Springs Public Works
- Aug 26, 2024Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by LaShunda Simpson on behalf of Colorado Springs Public Works
- Aug 26, 2024Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Jonathan Scherer on behalf of Colorado Springs Public Works
- Aug 26, 2024Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Joel Metzker on behalf of Colorado Springs Public Works
- Aug 26, 2024Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Joel Dagnillo on behalf of Colorado Springs Public Works
- Aug 26, 2024Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Jeff Bailey on behalf of Colorado Springs Public Works
- Aug 26, 2024Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Erin Powers on behalf of Colorado Springs Public Works
- Aug 26, 2024Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by General Email on behalf of Colorado Springs Public Works
- Aug 26, 2024Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Dana Davison on behalf of Colorado Springs Public Works
- Aug 26, 2024Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Brian Shevock on behalf of Colorado Springs Public Works
- Aug 26, 2024Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Mikayla Hartford on behalf of EPC Stormwater Review
- Aug 26, 2024Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Glenn Reese on behalf of EPC Stormwater Review
- Aug 26, 2024Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Christina Prete on behalf of EPC Stormwater Review
- Aug 26, 2024Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Kari Parsons on behalf of PCD Project Manager
- Aug 26, 2024Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Gilbert LaForce on behalf of PCD Engineering Division
- Aug 26, 2024Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Engineering Manager on behalf of PCD Engineering Division
- Aug 26, 2024Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by on behalf of PCD Administrative Notice
- Aug 26, 2024Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Miranda Benson on behalf of PCD Administrative Notice
- Aug 26, 2024Submission Triaged
- Aug 26, 2024Submission received from Applicant
- Aug 19, 2024Submission request sent to Applicant
- Jul 9, 2024Submission request sent to Applicant
- Jan 12, 2024Request for Review Comments returned by EPC Health Department
- Dec 5, 2023Request for Review Comments returned by PCD Engineering Division
- Dec 4, 2023Request for Review Comments returned by EPC Stormwater Review
- Dec 4, 2023Submission request sent to Applicant
- Dec 4, 2023Request for Review Comments returned by PCD Project Manager
- Nov 29, 2023Request for Review Comments returned by County Attorney - Development Review
- Nov 28, 2023Request for Review Comments returned by Pikes Peak Regional Building Department
- Nov 17, 2023Request for Review Comments returned by Parks Advisory Board
- Nov 13, 2023Request for Review Comments returned by Black Forest Fire Protection District
- Nov 13, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by PJ Langmaid on behalf of Black Forest Fire Protection District
- Nov 13, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Black Forest Fire Chief on behalf of Black Forest Fire Protection District
- Nov 13, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
- Nov 13, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by on behalf of Pikes Peak Regional Building Department
- Nov 13, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Victoria Chavez on behalf of Road Impact Fee Administrator
- Nov 13, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Jennifer Irvine on behalf of Road Impact Fee Administrator
- Nov 13, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by on behalf of Parks Advisory Board
- Nov 13, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Mikayla Hartford on behalf of EPC Stormwater Review
- Nov 13, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Glenn Reese on behalf of EPC Stormwater Review
- Nov 13, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Christina Prete on behalf of EPC Stormwater Review
- Nov 13, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Mike McCarthy on behalf of EPC Health Department
- Nov 13, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Catherine McGarvy on behalf of EPC Health Department
- Nov 13, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by HEAEH LandUse on behalf of EPC Health Department
- Nov 13, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Lori Seago on behalf of County Attorney - Development Review
- Nov 13, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by April Willie on behalf of County Attorney - Development Review
- Nov 13, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Lupe Packman on behalf of PCD Engineering Division
- Nov 13, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Gilbert LaForce on behalf of PCD Engineering Division
- Nov 13, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
- Nov 13, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Edward Schoenheit on behalf of PCD Engineering Division
- Nov 13, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Engineering Manager on behalf of PCD Engineering Division
- Nov 13, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Charlene Durham on behalf of PCD Engineering Division
- Nov 13, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Carlos Hernandez Martinez on behalf of PCD Engineering Division
- Nov 13, 2023Submission Triaged
- Nov 12, 2023Submission received from Applicant
- Sep 21, 2023Submission request sent to Applicant
- Sep 20, 2023Request for Review Comments returned by PCD Engineering Division
- Sep 20, 2023Request for Review Comments returned by County Attorney - Development Review
- Sep 19, 2023Request for Review Comments returned by PCD Administrative Notice
- Sep 19, 2023Submission request sent to Applicant
- Sep 19, 2023Request for Review Comments returned by PCD Project Manager
- Sep 19, 2023Request for Review Comments email resent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Kari Parsons on behalf of PCD Project Manager
- Sep 19, 2023Request for Review Comments returned by PCD Project Manager
- Sep 19, 2023Request for Review Comments email resent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Kari Parsons on behalf of PCD Project Manager
- Sep 19, 2023Request for Review Comments returned by PCD Project Manager
- Sep 19, 2023Request for Review Comments email resent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Kari Parsons on behalf of PCD Project Manager
- Sep 19, 2023Request for Review Comments returned by PCD Project Manager
- Sep 18, 2023Request for Review Comments returned by Colorado Springs Public Works
- Aug 29, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by on behalf of PCD Administrative Notice
- Aug 29, 2023Submission Triaged
- Aug 28, 2023Submission received from Applicant
- Aug 28, 2023Submission request sent to Applicant
- Aug 28, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Records Management Lead LaShunda Simpson on behalf of Colorado Springs Public Works
- Aug 28, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Lori Seago on behalf of County Attorney - Development Review
- Aug 28, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Kari Parsons on behalf of PCD Project Manager
- Aug 28, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Engineering Manager on behalf of PCD Engineering Division
- Aug 28, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Engineering Manager on behalf of PCD Engineering Division
- Aug 28, 2023Submission Triaged
- Aug 28, 2023Submission received from Applicant
- May 3, 2023Request for Review Comments returned by Parks Advisory Board
- Apr 24, 2023Submission request sent to Applicant
- Apr 24, 2023Request for Review Comments returned by PCD Project Manager
- Apr 21, 2023Request for Review Comments returned by PCD Engineering Division
- Apr 18, 2023Request for Review Comments returned by EPC Stormwater Review
- Apr 18, 2023Request for Review Comments returned by County Attorney - Water
- Apr 18, 2023Request for Review Comments returned by County Attorney - Development Review
- Apr 13, 2023Request for Review Comments returned by Mountain View Electric Association, Inc.
- Apr 13, 2023Request for Review Comments returned by Colorado Springs Public Works
- Apr 11, 2023Request for Review Comments returned by Pikes Peak Regional Building Department
- Apr 10, 2023Request for Review Comments returned by Colorado Geological Survey
- Apr 5, 2023Request for Review Comments returned by Colorado Division of Water Resources
- Apr 3, 2023Request for Review Comments returned by 911 Authority - El Paso/Teller County
- Mar 30, 2023Request for Review Comments returned by Colorado Parks and Wildlife
- Mar 29, 2023Request for Review Comments returned by EPC Environmental Services
- Mar 28, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Lori Seago on behalf of County Attorney - Development Review
- Mar 28, 2023Submission Triaged
- Mar 28, 2023Submission received from Applicant
- Mar 28, 2023Submission request sent to Applicant
- Mar 27, 2023Request for Review Comments returned by EPC Parks Department
- Mar 27, 2023Request for Review Comments returned by Academy SD 20 Building Fund
- Mar 22, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Tabitha Barile on behalf of Sterling Ranch Metropolitan District 1-3
- Mar 22, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by General Email on behalf of Mountain View Electric Association, Inc.
- Mar 22, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Roger Austin on behalf of Mountain Metro Transit (City of COS)
- Mar 22, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
- Mar 22, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Records Management Lead LaShunda Simpson on behalf of Colorado Springs Public Works
- Mar 22, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Santiago Tijerina on behalf of Black Hills Energy-Aquila
- Mar 22, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Deputy Chief James Rebitski on behalf of Black Forest Fire Protection District
- Mar 22, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Plannig Consultant Donald Smith on behalf of Academy SD 20 Building Fund
- Mar 22, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
- Mar 22, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
- Mar 22, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
- Mar 22, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Tim Kroening on behalf of Colorado Parks and Wildlife
- Mar 22, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Colorado Geological Survey on behalf of Colorado Geological Survey
- Mar 22, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Joanna Williams on behalf of Colorado Division of Water Resources
- Mar 22, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Victoria Chavez on behalf of Road Impact Fee Administrator
- Mar 22, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by on behalf of Parks Advisory Board
- Mar 22, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
- Mar 22, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Bill Elder on behalf of EPC Sheriff's Department
- Mar 22, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Bill Elder on behalf of EPC Sheriff's Department
- Mar 22, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Joshua Palmer on behalf of EPC Public Works, County Engineer
- Mar 22, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by on behalf of EPC Parks Department
- Mar 22, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Catherine McGarvy on behalf of EPC Health Department
- Mar 22, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Kathy Andrew on behalf of EPC Environmental Services
- Mar 22, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by April Willie on behalf of County Attorney - Water
- Mar 22, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Lori Seago on behalf of County Attorney - Development Review
- Mar 22, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Kari Parsons on behalf of PCD Project Manager
- Mar 22, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
- Mar 22, 2023Submission Triaged
- Mar 22, 2023Submission received from Applicant
- Jan 27, 2023Request for Review Comments returned by EPC Health Department
- Jan 26, 2023Submission request sent to Applicant
- Jan 26, 2023Submission request sent to Applicant
- Jan 26, 2023Request for Review Comments returned by PCD Engineering Division
- Jan 26, 2023Request for Review Comments returned by PCD Project Manager
- Jan 26, 2023Request for Review Comments email resent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Kari Parsons on behalf of PCD Project Manager
- Jan 26, 2023Request for Review Comments returned by PCD Project Manager
- Jan 25, 2023Request for Review Comments returned by EPC Stormwater Review
- Jan 19, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
- Jan 19, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Kari Parsons on behalf of PCD Project Manager
- Jan 19, 2023Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
- Jan 12, 2023Request for Review Comments returned by County Attorney - Development Review
- Jan 12, 2023Request for Review Comments returned by Parks Advisory Board
- Jan 4, 2023Request for Review Comments returned by Colorado Springs Public Works
- Jan 4, 2023Request for Review Comments returned by Black Forest Fire Protection District
- Jan 4, 2023Request for Review Comments returned by Academy SD 20 Building Fund
- Dec 29, 2022Request for Review Comments returned by Colorado Geological Survey
- Dec 21, 2022Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
- Dec 21, 2022Request for Review Comments returned by Colorado Parks and Wildlife
- Dec 20, 2022Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
- Dec 20, 2022Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Kari Parsons on behalf of PCD Project Manager
- Dec 20, 2022Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
- Dec 19, 2022Request for Review Comments returned by Mountain View Electric Association, Inc.
- Dec 16, 2022Request for Review Comments returned by EPC Parks Department
- Dec 16, 2022Request for Review Comments returned by County Attorney - Water
- Dec 14, 2022Request for Review Comments returned by Pikes Peak Regional Building Department
- Dec 13, 2022Request for Review Comments returned by EPC Environmental Services
- Dec 13, 2022Request for Review Comments returned by 911 Authority - El Paso/Teller County
- Dec 12, 2022Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
- Dec 12, 2022Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by April Willie on behalf of County Attorney - Water
- Dec 12, 2022Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Lori Seago on behalf of County Attorney - Development Review
- Dec 12, 2022Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Kari Parsons on behalf of PCD Project Manager
- Dec 12, 2022Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
- Dec 12, 2022Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Tabitha Barile on behalf of Sterling Ranch Metropolitan District 1-3
- Dec 12, 2022Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by General Email on behalf of Mountain View Electric Association, Inc.
- Dec 12, 2022Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Roger Austin on behalf of Mountain Metro Transit (City of COS)
- Dec 12, 2022Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)