Hancock Subdivsion VR -Final Plat

Vacate / replat VR254 Active

replat of one lot to create 2 lots; Verify Donala water comt is 300 years both lots now Donala; both lots Septic

Location
15220 LEATHER CHAPS DR
Jurisdiction
El Paso County
Applicant
Rocky Mountain Land Services Christpher Thompson
Land owner (assessor)
BILL AND VICKIE HANCOCK LIVING TRUST
County project manager
Jen Uhler
Filed
May 14, 2024
Parcel
7136002071
Map
Parcel boundaries: Colorado public parcel data · Basemap © OpenStreetMap contributors
Area map
See all Tri-Lakes projects on the map
Source record
El Paso County EDARP file

Documents (30)

Water Resources ReportreviewMay 11, 2026
Letter of IntentreviewMay 11, 2026
Final Plat DrawingsreviewMay 11, 2026
Application/Petition FormreviewMay 11, 2026
Drainage Report - FinalreviewMay 11, 2026
Soils & Geology ReportreviewMar 19, 2026
Fire Protection ReportreviewAug 4, 2025
PBMP Applicability FormreviewJul 29, 2025
Donala water resourcesreviewJul 23, 2025
Closures Sheet (Survey)reviewJan 20, 2025
Selected RangeadditionalApr 25, 2025
Selected Range was 500 feet. JM
Mailing LabelsadditionalApr 25, 2025
Mailing Labels for the 14 surrounding property owners that received notices. Cost = $9.66. JM
Neighbor Notice & Vicinity MapadditionalApr 25, 2025
Notice of Application letters were mailed to surrounding property owners on 04/25/2025. JM
v1_Natural Gas Commitment LetteradditionalMay 15, 2024
v1_Soils and Geology ReportadditionalMay 15, 2024
v1_Letter of IntentadditionalMay 15, 2024

Agency review comments (65)

Comments returned by referral agencies during review, from the county's public EDARP file. Some agencies attach a letter instead of (or alongside) written comments.

Colorado Division of Water Resourcesreview 4Jun 25, 2026
View attached comment letter
PCD Project Managerreview 4May 29, 2026
PCD Planning has reviewed the submittal and provided comments on the following documents, which have been uploaded with markups noted (a summary can be found at the end of the document): - Letter of Intent - Final Plat Drawing - Hazard Mitigation Plan - Water Resources Report - Soils and Geology Report * Soils and Geology Report is encrypted and cannot be edited for markup purposes. Comments are as follows: 1. First page lists Hancock Subdivision, please show consistent naming throughout application materials. 2. Report states that lots will be served by well, and letter of intent states water will be provided by Donala water and sanitation district and that wells are prohibited. Please clarify and correct. Jen Uhler PCD Planner 719-520-7952 jenuhler@elpasoco.com
View attached comment letter
PCD Engineering Divisionreview 4May 28, 2026
Engineering Review Ver.4 No further engineer comments. Admin notes below. Jackson Creek (FOMO4400) Drainage basin fees in the amount of $2,177.17 will be due at time of Final Plat Recording Please add the following note on the PLAT prior to final recording. Per ECM section I.7.1.B.5, residential lots impervious area may not exceed 10 percent unless a study is prepared in compliance with the requirements laid out in the above referenced ECM section. Impervious area may not exceed 20 percent. This impervious area for each lot must include the proposed driveway. Road Impact fees are applicable and will be due at time of building permit for new home on new lot. A new driveway access permit will be required for primary access to the new lot Edward Schoenheit, Engineer E.P.C. Dept. of Public Works 2880 International Circle Colorado Springs, CO. 80910 Office: 719.520.6813 Cell: 719.502.9659 edwardschoenheit@elpasoco.com https://planningdevelopment.elpasoco.com/
Colorado Geological Surveyreview 4May 26, 2026
View attached comment letter
County Attorney - Waterreview 4May 22, 2026
Please upload Water Supply Information Summary that lists the total water demand from all categories. If Donala is providing water for both lots, please upload a current water commitment letter from the district. Please upload a Water Resource Report and letter from Colorado Division of Water that shows adequate water for this project.
Pikes Peak Regional Building Departmentreview 4May 19, 2026
1. The garage (under permit O83386) on the west lot needs an address change to the new address assigned. Here is the link to the address change request form. I will sign off on this project once I receive this information. https://www.pprbd.org/File/Resources/Downloads/Addressing/Request%20for%20change%20of%20address%20ACCESS.pdf 2. Standard Final Plat comments: a. Enumerations will review the pre-plat (mylar) prior to plat for address placement, street names, and title block. b. A $10.00 per lot and tract platting fee will be due at the time of the review of the pre-plat, (two addresses per lot and tract). If an address is not needed on a tract then no fee applies. Check should be made out to PIKES PEAK REGIONAL BUILDING DEPARTMENT or PPRBD. As of December 5th 2023, the fee for all credit/debit cards has changed from the flat 2.95% fee to the following: Over the phone Credit/Debit Card payments will be 2.3% and In-Person Debit Card payments will be 1.5% (in-person only). Paid directly to the Enumerations Department. c. Pre-plat reviews can be reviewed via “pdf” or in-person. The pre-plat will be stamped by Enumerations for accuracy and returned to the applicant and the planner. All payments to be mailed to RBD via a check or credit card payment over the phone. Plats should not be recorded prior to Enumerations stamping the pre-plat and receiving payment of plat fees. If any pre-plat changes occur, even if changes do not apply to Enumerations, we still need to re-stamp the pre-plat. The Enumerations stamped pre-plat copy should match the recorded document minus a few signatures. If you would like an in-person review, please make an appointment on our website, https://www.pprbd.org/Home/BookAppt d. A copy of the final recorded plat is required prior to plan submittal for RESIDENTIAL. A copy of the final recorded plat is required prior to approval in the Enumerations department on any COMMERCIAL plan submittal. Please email the Enumerations staff member that reviewed your project. Amy@pprbd.org; Brent@pprbd.org; or BeckyA@pprbd.org Amy Vanderbeek Enumerations Plans Examiner Pikes Peak Regional Building Department O: 719-327-2930 E: Amy@pprbd.org
PCD Project Managerreview 3Jan 14, 2026
Please pay attention to the comments made by Pikes Peak Regional Building Department as they will not sign off on your mylar if their comments are not addressed. El Paso County Attorney's Office will not be reviewing your submittal again until after the State Engineer's Office has recommended approval of the project. No more incomplete submittals will be accepted. Address all comments before resubmitting.
PCD Project Managerreview 3Jan 14, 2026
Please see comments on Soils and Geology Report.
View attached comment letter
PCD Project Managerreview 3Jan 14, 2026
Please see comments on Letter of Intent.
View attached comment letter
PCD Project Managerreview 3Jan 14, 2026
Please see comments on Final Plat Drawings.
View attached comment letter
PCD Project Managerreview 3Jan 14, 2026
Please see comments on Drainage Report.
View attached comment letter
PCD Project Managerreview 3Jan 14, 2026
Please see comment on the Water Supply Information Summary.
View attached comment letter
PCD Project Managerreview 3Jan 14, 2026
Please see comments on the Water Resources Report.
View attached comment letter
PCD Project Managerreview 3Jan 14, 2026
Please see comments on Application.
View attached comment letter
Colorado Division of Water Resourcesreview 3Jan 7, 2026
Please refer to our prior letter dated September 26, 2025. No action appears to have been taken in regards to existing permit no. 150286.
Colorado Division of Water Resourcesreview 3Jan 7, 2026
View attached comment letter
Colorado Geological Surveyreview 3Jan 6, 2026
View attached comment letter
Colorado Geological Surveyreview 3Jan 6, 2026
CGS has reviewed the resubmittal for the Hancock Subdivision Final Plat (dated September 18, 2025) and finds that comments identified in CGS review letters dated May 14, 2025 and August 18, 2025 remain unresolved, including the requirement for a geologic hazard evaluation; CGS does not recommend approval at this time.
View attached comment letter
PCD Engineering Divisionreview 3Jan 5, 2026
Engineering Review Ver.3 Final Plat_V3. Plat notes still need correction. GEOTECH Report_V3 Document submitted does not meet ECM Standards or provide necessary information for Geological hazards and constraints. See all CGS comments. The V3 is still the soils and foundation report not a complete GEOTECH report. FDR_V3 Comments from V2 not addressed. Owner signature missing, Drainage map is not readable. Road Impact fees are applicable and will be due at time of building permit for new home on new lot. A new driveway access permit will be required for primary access to the new lot Edward Schoenheit, Engineer E.P.C. Dept. of Public Works 2880 International Circle Colorado Springs, CO. 80910 Office: 719.520.6813 Cell: 719.502.9659 edwardschoenheit@elpasoco.com https://planningdevelopment.elpasoco.com/
Pikes Peak Regional Building Departmentreview 3Dec 30, 2025
1. The garage (under permit O83386) on the west lot needs an address change to the new address assigned. Here is the link to the address change request form. I will sign off on this project once I receive this information. https://www.pprbd.org/File/Resources/Downloads/Addressing/Request%20for%20change%20of%20address%20ACCESS.pdf 2. Standard Final Plat comments: a. Enumerations will review the pre-plat (mylar) prior to plat for address placement, street names, and title block. b. A $10.00 per lot and tract platting fee will be due at the time of the review of the pre-plat, (two addresses per lot and tract). If an address is not needed on a tract then no fee applies. Check should be made out to PIKES PEAK REGIONAL BUILDING DEPARTMENT or PPRBD. As of December 5th 2023, the fee for all credit/debit cards has changed from the flat 2.95% fee to the following: Over the phone Credit/Debit Card payments will be 2.3% and In-Person Debit Card payments will be 1.5% (in-person only). Paid directly to the Enumerations Department. c. Pre-plat reviews can be reviewed via “pdf” or in-person. The pre-plat will be stamped by Enumerations for accuracy and returned to the applicant and the planner. All payments to be mailed to RBD via a check or credit card payment over the phone. Plats should not be recorded prior to Enumerations stamping the pre-plat and receiving payment of plat fees. If any pre-plat changes occur, even if changes do not apply to Enumerations, we still need to re-stamp the pre-plat. The Enumerations stamped pre-plat copy should match the recorded document minus a few signatures. If you would like an in-person review, please make an appointment on our website, https://www.pprbd.org/Home/BookAppt d. A copy of the final recorded plat is required prior to plan submittal for RESIDENTIAL. A copy of the final recorded plat is required prior to approval in the Enumerations department on any COMMERCIAL plan submittal. Please email the Enumerations staff member that reviewed your project. Amy@pprbd.org; Brent@pprbd.org; or BeckyA@pprbd.org
Colorado Division of Water Resourcesreview 2Sep 16, 2025
View attached comment letter
County Attorney - Waterreview 2Aug 20, 2025
We await an updated commitment letter from the District. The letter states “This commitment to serve shall exist for a period of one (1) year from the above date….” Please review the requirements listed in the letter from the Colorado Division of Water Resources dated May 16, 2025, as there are recommendations therein. Please upload a new letter that shows adequate supply after compliance with their requests. Thank you.
PCD Project Managerreview 2Aug 19, 2025
As there are numerous outside agencies still reviewing errors and omissions, there were several issues with the first review including formatting and legibility, and the project manager was reassigned, please take note that once the outside agencies have completed their reviews as well as the omissions and formats are corrected a full review will be conducted by the new project manager which may result in further comments.
PCD Project Managerreview 2Aug 19, 2025
Please see comments on Soils and Geology Report.
View attached comment letter
PCD Project Managerreview 2Aug 19, 2025
Please see comments on Plat. As mentioned on a previous comment. The plat was uploaded and submitted twice. Please be careful to make certain the right documents are being uploaded in the correct link.
View attached comment letter
PCD Project Managerreview 2Aug 19, 2025
Please see comments on Letter of Intent.
View attached comment letter
PCD Project Managerreview 2Aug 19, 2025
See comments on Final Plat Drawings. Somehow there were two plats uploaded and submitted. There are comments on both versions.
View attached comment letter
PCD Project Managerreview 2Aug 19, 2025
See comments on Final Drainage Report.
View attached comment letter
PCD Engineering Divisionreview 2Aug 18, 2025
GEOTECH V2
View attached comment letter
PCD Engineering Divisionreview 2Aug 18, 2025
FDR_V2
View attached comment letter
PCD Engineering Divisionreview 2Aug 18, 2025
Engineering Review Ver.2 Final Plat_V2. Please see comments on PLAT_V1 Comments not addressed on V2. GEOTECH Report_V2 Document submitted does not meet ECM Standards or provide necessary information for Geological hazards and constraints. See all CGS comments. FDR_V2 See comments Road Impact fees are applicable and will be due at time of building permit for new home on new lot. A new driveway access permit will be required for primary access to the new lot Edward Schoenheit, Engineer E.P.C. Dept. of Public Works 2880 International Circle Colorado Springs, CO. 80910 Office: 719.520.6813 Cell: 719.502.9659 edwardschoenheit@elpasoco.com https://planningdevelopment.elpasoco.com/
Colorado Geological Surveyreview 2Aug 18, 2025
View attached comment letter
Mountain View Electric Association, Inc.review 2Aug 14, 2025
see previous comment May 2025.
EPC Fire and Wildfire Program Managerreview 2Aug 11, 2025
The existing fire hydrant has been verified. Provide plat notes as stated on the final plat drawings. Fire flow and access will be required at site development plan. Roland Peterson Fire Safety and Wildfire Mitigation Program Manager Planning & Community Development 719.520.6075 Rolandpeterson@elpasoco.com
Pikes Peak Regional Building Departmentreview 2Aug 5, 2025
1. Note: Home to remain on proposed lot 2 under 15220 Leather Chaps Drive. 2. Will the accessory structure on proposed lot 1 remain or be removed? If it is to remain then an address change to keep it on the new lot will need to be completed. Is link to address change: Not finding this information in the intent letter. https://www.pprbd.org/File/Resources/Downloads/Addressing/Request%20for%20change%20of%20address%20ACCESS.pdf 3. Standard final plat comments still apply. See prior comments for details. Amy Vanderbeek Enumerations Plans Examiner Pikes Peak Regional Building Department O: 719-327-2930 E: Amy@pprbd.org
EPC Health Departmentreview 1Jun 13, 2025
View attached comment letter
Mountain View Electric Association, Inc.review 1May 22, 2025
See attached comments
View attached comment letter
Colorado Division of Water Resourcesreview 1May 16, 2025
View attached comment letter
PCD Project Managerreview 1May 15, 2025
v1_Colorado Geological Survey Receipt comment.
View attached comment letter
PCD Project Managerreview 1May 15, 2025
v1_Water Supply Information Summary comments
View attached comment letter
PCD Project Managerreview 1May 15, 2025
v1_Water Resources Report comments
View attached comment letter
PCD Project Managerreview 1May 15, 2025
v1_Title Commitment (Current within 30 days of submittal) comment
View attached comment letter
PCD Project Managerreview 1May 15, 2025
v1_Soils & Geology Report comments
View attached comment letter
PCD Project Managerreview 1May 15, 2025
v1_PBMP Applicability Form comments
View attached comment letter
PCD Project Managerreview 1May 15, 2025
v1_Letter of Intent comments
View attached comment letter
PCD Project Managerreview 1May 15, 2025
v1_Fire Protection Report comments
View attached comment letter
PCD Project Managerreview 1May 15, 2025
v1_Final Plat Drawings comments
View attached comment letter
PCD Project Managerreview 1May 15, 2025
v1_Drainage Report - Final comments
View attached comment letter
PCD Project Managerreview 1May 15, 2025
v1_Commitment letter from water service provider comments
View attached comment letter
PCD Project Managerreview 1May 15, 2025
v1_Commitment letter from waste water service provider comments
View attached comment letter
PCD Project Managerreview 1May 15, 2025
Staff will require a more legible submittal for all documents associated with this project. Many of the documents are not to scale and are difficult to read. Due to the volume of comments , subsequent reviews will have additional comments and requested revisions. For most of these documents, the next review will be the first review due to lack of information or not the correct documents staff needs to conduct a thorough review. -Ashlyn Mathy
PCD Engineering Divisionreview 1May 14, 2025
Engineering Review Ver.1 Please see engineering comments on the following documents Note due to the nature and extent of comments a detailed review could not be completed on all documents within this submittal. Final Plat_V1 GEOTECH Report_V1 Document submitted does not meet ECM Standards or provide necessary information. See attached document for what a GEOTECH report must consist of. See comments on review document. High ground water is evident. FDR_V1 LOI_V1 PBMP Form_V1 Please complete form with engineer stamp. Fire Protection Report_V1 Please check if the USGS Review fee was submitted correctly as the form says City of Colorado Springs not El Paso County. Road Impact fees are applicable and will be due at time of building permit for new home on new lot. Drainage basin fees are applicable to be paid at time of Final Plat Recording. Drainage Report to update and correct drainage basin fee amount A Traffic Impact Study (TIS) is not required. A new driveway access permit will be required for primary access to the new lot Edward Schoenheit, Engineer E.P.C. Dept. of Public Works 2880 International Circle Colorado Springs, CO. 80910 Office: 719.520.6813 Cell: 719.502.9659 edwardschoenheit@elpasoco.com https://planningdevelopment.elpasoco.com/
View attached comment letter
Colorado Geological Surveyreview 1May 14, 2025
View attached comment letter
EPC DPW Stormwaterreview 1May 14, 2025
Review 1: There is not any needed for a EPC SW Permit (ie: ESQCP) or water quality treatment facility at this stage since no soil disturbances are being proposed. Therefore, EPC DPW Stormwater does not have any comments on this VR application. If/when a single family home is built on the 2nd lot, a Builder's ESQCP (BESQCP) will be necessary. Reviewed by: Glenn Reese, P.E. Principal Engineer - Stormwater 719.675.2654 GlennReese@elpasoco.com
EPC Fire and Wildfire Program Managerreview 1May 13, 2025
Final Plat Notes; Plans are not to scale 6.3.3 (B) (4) Plat Notes Required. Notice of any wildfire mitigation issues or obligations may be required by the County through conditions of approval or notes placed on the face of the plat. 6.3.4 (B) (4) (d) Plat Notes Required. Notice of any forest health issues may be required by the County through conditions of approval or notes placed on the face of the plat. This area is a light hazard wildfire urban interface area requiring the following: 9.14 m (30 ft) clearance. Class A roof. No portion of trees or other vegetation within 3.048 m (10 ft) of chimney outlets. Trees within defensible space shall be pruned to minimize ladder fuels. Fire Protection Notes How will water for fire protection be provided? Monument fire does not adopt Appendixes B and C of the International Fire Code requiring water. The Land Development Code does require water which may be provided for either with a cistern or with a central water supply. Please detail which will be provided with the necessary calculations. This site is in a WUI area per the CSFS map. This requires that mitigation and Class A roofing be in place. These notes must be added to the plat. The access to the structures cannot be determined from the plans provided. It is unclear what the slop of the access is and if the 150’ requirement will be met per 6.3.3 C 3. Risk Assessment Required. A wildland fire risk and hazard severity assessment shall be performed for all structures and groups of structures adjacent to wildland fuels. Note what areas are low and high risk When a subject lot, parcel, or tract falls within a wildland fire area, a wildland fire risk and hazard mitigation plan shall be prepared by a qualified professional. The water supply cannot be evaluated as no information has been provided on this topic. There are no exceptions listed in the LDC for not providing a water supply for fire protection. Wildland Fire and Hazard Mitigation Plan Required. Not provided as required. This plan must be prepared by a qualified professional as defined in chapter 1.15 of the LDC. There is not enough information to conduct a full review. The next review will be considered a first review.
County Attorney - Waterreview 1May 12, 2025
The documents provided for water review must cover both the proposed new lot and the existing. 1. Please update the Water Supply Information Summary to provide the estimated demand for the subdivision as a whole, which includes both lots and all existing and anticipated use. Make sure to include the well permit number in section 10, as well as which aquifer the existing well draws from and any water court decree case numbers associated. 2. If one lot proposes use of an existing well, please upload information regarding well permits/water rights/Determinations or Decrees. 3. Please provide an updated Commitment Letter from the District. The commitment to serve exists for a period of one year from the date of the letter (May 8, 2024). 4. Pursuant to the El Paso County Land Development Code 8.4.7 (B) please upload a Water Resource Report for this subdivision. What is currently uploaded seems to the District’s Report. 5. Please upload a letter from the Colorado Division of Water Resources with a finding sufficient water.
Colorado Parks and Wildlifereview 1May 11, 2025
View attached comment letter
Tri-Lakes-Monument Fire Protection Districtreview 1Apr 29, 2025
FD has no comment on replat
Pikes Peak Regional Building Departmentreview 1Apr 28, 2025
1. Existing home address is 15220 Leather Chaps Drive & 495 Struthers Loop. Corner lots receive two addresses. This existing lot will still be replatted with two addresses. The new address for proposed lot 1 will be 505 Struthers Loop. Add all 3 addresses to the plat. 2.Will the access driveway running across lot 1 to lot 2 be removed? Please clarify the access to both lots. 3. In the intent letter the legal description is incorrect. The section is 36 not 365. 4. Will the accessory structure on proposed lot 1 remain or be removed? If it is to remain then an address change to keep it on the new lot will need to be completed. Is link to address change: https://www.pprbd.org/File/Resources/Downloads/Addressing/Request%20for%20change%20of%20address%20ACCESS.pdf 5. Standard Final Plat comments: a. Enumerations will review the pre-plat (mylar) prior to plat for address placement, street names, and title block. b. A $10.00 per lot and tract platting fee will be due at the time of the review of the pre-plat, (two addresses per lot and tract). If an address is not needed on a tract then no fee applies. Check should be made out to PIKES PEAK REGIONAL BUILDING DEPARTMENT or PPRBD. Paid directly to the Enumerations Department. As of December 5th 2023, the fee for all credit/debit cards has changed from the flat 2.95% fee to the following: Over the phone Credit/Debit Card payments will be 2.3% and In-Person Debit Card payments will be 1.5% (in-person only). c. Pre-plat reviews can be reviewed via “pdf” or in-person. The pre-plat will be stamped by Enumerations for accuracy and returned to the applicant and the planner. All payments to be mailed to RBD via a check or credit card payment over the phone. Plats should not be recorded prior to Enumerations stamping the pre-plat and receiving payment of plat fees. If any pre-plat changes occur, even if changes do not apply to Enumerations, we still need to re-stamp the pre-plat. The Enumerations stamped pre-plat copy should match the recorded document minus a few signatures. If you would like an in-person review, please make an appointment on our website, https://www.pprbd.org/Home/BookAppt d. A copy of the final recorded plat is required prior to plan submittal for RESIDENTIAL. A copy of the final recorded plat is required prior to approval in the Enumerations department on any COMMERCIAL plan submittal. Please email the Enumerations staff member that reviewed your project. Amy@pprbd.org; Brent@pprbd.org; or BeckyA@pprbd.org Amy Vanderbeek Enumerations Plans Examiner Pikes Peak Regional Building Department O: 719-327-2930 E: Amy@pprbd.org
EPC Environmental Servicesreview 1Apr 28, 2025
View attached comment letter
Academy SD 20 Building Fundreview 1Apr 28, 2025
Academy District 20 is in receipt of File # VR254 for approval of the Hancock Subdivision VR -Final Plat. The District is requesting fees in lieu of land dedication per the existing County Code for all residential units within this development. The Letter of Intent incorrectly stated that this property was served by Lewis Palmer school district. The property is actually within the boundaries of Academy School District 20. The District is experiencing ongoing residential development. The District gained approximately 12,000 new residential units between 2018 and 2024 which included 5,278 Single Family, 1,156 Single Family Attached, and 5,576 Apartments as reported to the District by local developers. During that same timeframe, the District only experienced a total membership increase of 138 students. This information is updated annually in October. A drop in the birth rate plus the significant increase in the cost of housing has slowed student growth in the District. The District is able to serve each student who is a resident of District 20. If you need additional information, please contact me. Don Smith Planning Consultant
EPC Parks Departmentreview 1Apr 25, 2025
El Paso County Parks and Community Services Department, Final Administrative Comments - Please See Attached Documentation (No Park Advisory Board endorsement necessary for minor subdivision applications)
View attached comment letter
PCD Administrative Noticereview 1Apr 25, 2025
On 04/25/2025, PCD mailed "Notice of Application" letters to surrounding property owners within a 500-foot range (14 addresses). Copies of the notice, mailing labels, and selected range have been uploaded to the EDARP file. Cost of postage to be billed to the applicant = $9.66. JM
Colorado Department of Transportation - Pueblo Officereview 1Apr 23, 2025
CDOT has no comments regarding this development.
911 Authority - El Paso/Teller Countyreview 1Apr 23, 2025
No action for E911 on this submittal. Thank you. Justin

Timeline