High Forest Estates Subdivision Filing No. 1
Plat amendment to split one platted lot into two. Project replaces expired VR2311
- Jurisdiction
- El Paso County
- Applicant
- M.V.E., Inc. David Gorman
- County project manager
- Lacey Dean
- Filed
- Apr 11, 2025
- Parcel
- 5110001009
- Map
-
Parcel boundaries: Colorado public parcel data · Basemap © OpenStreetMap contributors
- Area map
- See all Tri-Lakes projects on the map
- Source record
- El Paso County EDARP file
Documents (22)
Agency review comments (21)
County Attorney - Waterreview 2Jun 11, 2026
See attached Water Supply Review and Recommendations.
PCD Project Managerreview 2Jun 2, 2026
Please submit a revised water resources report for re-review by Public Health. Water finding by County Attorney's Office is pending review of the DWR report (comments due by 6/16/2026).
Reviewed by:
Lacey Dean, Associate Planner
laceydean2@elpasoco.com
County Attorney - Development Reviewreview 2May 20, 2026
No additional comments from County Attorney - Development Review at this time.
Reviewed by: Erika Keech, Sr. County Attorney, erikakeech2@elpasoco.com.
Elbert Fire Protection Districtreview 2May 18, 2026
Review 2: EFPD - As is outlined in the Wildland Fire & Mitigation Plan + Water Supply Analysis, the fire district will not require a cistern for this subdivision as the water supply requirements can be effectively supported through mobile water operations supported by EFPD and its mutual aid partners. All future site and building construction shall be reviewed by EFPD and meet the Codes and Standards adopted by the District at the time of submittal, including the driveway and fire apparatus access design requirements outlined in the District's Driveway Design Manual.
Reviewed by:
Chris Brunette, MS,FM
Fire Marshal
303.882.3746
cbrunette@elbertfire.org
Mountain View Electric Association, Inc.review 1May 12, 2025
Please see attached comments
PCD Project Managerreview 1May 8, 2025
V1_Fire Protection Report_comments
PCD Project Managerreview 1May 8, 2025
Review 1: EPC Planning Division has minor comments on the following documents.
- Final Plat Drawings
Reviewed by:
Lacey Dean, Associate Planner
laceydean2@elpasoco.com
EPC DPW Stormwaterreview 1May 8, 2025
Review 1: EPC DPW Stormwater has no comments. Planner: no re-review necessary.
Reviewed by:
Mikayla Hartford, P.E.
Engineer - Stormwater
719.339.5053
MikaylaHartford@elpasoco.com
EPC DPW Development Services - Engineeringreview 1May 8, 2025
No additional engineering comments. The final drainage report will be routed for approval by the ECM administrator.
reviewed by:
Daniel Torres
danieltorres@elpasoco.com
Colorado Geological Surveyreview 1May 8, 2025
The available referral documents include the Request for CGS review (Email, April 17, 2025), Final Plat (MVE, Inc., September 12, 2024), Letter of Intent (MVE, Inc., January 17, 2024), and Soil, Geology, and Geologic Hazard Study and OWTS Wastewater Study (Entech Engineering, Inc., November 2, 2022). The site does not contain any unusual geologic hazards or geotechnical constraints that preclude the proposed two-lot minor subdivision. As noted on page 5 of Entech’s report, “The engineering geologic constraints identified on this site include artificial fill, potentially expansive soils, and potentially seasonal shallow groundwater….”. Potentially unstable slopes are also identified in Entech’s report and included in Figure 6 in the southern portion of the site. The final plat indicates the steep drainage easements traversing the lots are “No Build and No Storage of Materials.” Entech also notes (page 5) that construction is not proposed within these steeply sloping drainage areas/easements. Entech’s characterization of the geologic hazards and constraints associated with the site is valid. Provided Entech’s recommendations are strictly adhered to, CGS has no objection to approval of the minor subdivision as proposed.
Submitted 5/8/2025 by Amy Crandall, Engineering Geologist, Colorado Geological Survey (303-384-2632 or acrandall@mines.edu)
County Attorney - Development Reviewreview 1May 6, 2025
Regarding the Access and Maintenance Agreement, consider providing more clarity with respect to the maintenance of the shared driveway.
Consider adding an example of how maintenance costs will be allocated, such as: "If one Lot Owner uses only 25% of the Shared Access to get to their driveway, and the other uses 100%, then they are equally responsible for the first 25% and the 2nd owner is 100% responsible for the remaining 75%)."
Reviewed by: Erika Keech, Senior County Attorney, erikakeech2@elpasoco.com.
County Attorney - Waterreview 1May 2, 2025
County Attorney’s Office will review for water sufficiency following receipt of findings from the Colorado Division of Water Resources. Thank you.
EPC Fire and Wildfire Program Managerreview 1Apr 28, 2025
Fire review comments added to the following documents:
-Final Plat Drawings
-Fire Protection Report
Pikes Peak Regional Building Departmentreview 1Apr 28, 2025
Standard final plat comments still apply. See prior comments for details.
Enumerations has no further comment.
Amy Vanderbeek
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2930 E: Amy@pprbd.org
EPC Parks Departmentreview 1Apr 18, 2025
El Paso County Parks and Community Services Department, Final Administrative Comments - Please See Attached Documentation (No Park Advisory Board endorsement necessary for minor subdivision development applications)
Colorado Department of Transportation - Pueblo Officereview 1Apr 18, 2025
CDOT has no comments regarding this development.
Timeline
- Sep 16, 2026Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Catherine McGarvy on behalf of EPC Health Department
- Sep 16, 2026Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by HEAEH LandUse on behalf of EPC Health Department
- Sep 16, 2026Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Lori Seago on behalf of County Attorney - Water
- Sep 16, 2026Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Erika Keech on behalf of County Attorney - Water
- Sep 16, 2026Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by April Willie on behalf of County Attorney - Water
- Sep 16, 2026Submission Triaged
- Sep 15, 2026Submission received from Applicant
- Sep 11, 2026First appeared on the EDARP active list
- Jun 11, 2026Request for Review Comments returned by County Attorney - Water
- Jun 2, 2026Submission request sent to Applicant
- Jun 2, 2026Request for Review Comments returned by PCD Project Manager
- Jun 2, 2026Request for Review Comments email resent for Project High Forest Estates Subdivision Filing No. 1 for review by Justin Kilgore on behalf of PCD Project Manager
- Jun 2, 2026Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Lori Seago on behalf of County Attorney - Water
- Jun 2, 2026Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Erika Keech on behalf of County Attorney - Water
- Jun 2, 2026Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by April Willie on behalf of County Attorney - Water
- May 21, 2026Request for Review Comments returned by PCD Project Manager
- May 20, 2026Request for Review Comments returned by County Attorney - Development Review
- May 18, 2026Request for Review Comments returned by Elbert Fire Protection District
- May 14, 2026Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Chris Brunette on behalf of Elbert Fire Protection District
- May 12, 2026Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Lori Seago on behalf of County Attorney - Development Review
- May 12, 2026Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Erika Keech on behalf of County Attorney - Development Review
- May 12, 2026Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by April Willie on behalf of County Attorney - Development Review
- May 12, 2026Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Justin Kilgore on behalf of PCD Project Manager
- May 12, 2026Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Bill Crimmel on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)(to also include the TLLU areas)
- May 12, 2026Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Vicki Wood on behalf of Lewis Palmer 38
- May 12, 2026Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Melissa Andrews on behalf of Lewis Palmer 38
- May 12, 2026Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Brett Ridgway on behalf of Lewis Palmer 38
- May 12, 2026Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Mike Harrower on behalf of Elbert Fire Protection District
- May 12, 2026Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by William Vogl on behalf of El Paso County Conservation Dist
- May 12, 2026Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Katie Miller on behalf of El Paso County Conservation Dist
- May 12, 2026Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Harry Thomas on behalf of El Paso County Conservation Dist
- May 12, 2026Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by on behalf of El Paso County Conservation Dist
- May 12, 2026Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Mariah Hudson on behalf of El Paso County Conservation Dist
- May 12, 2026Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Dave Munger on behalf of Council of Neighborhood Organizations (CONO)
- May 12, 2026Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Steve Rodriguez on behalf of Fountain Creek Watershed Flood Control & Greenway Dist
- May 12, 2026Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Allison Schuch on behalf of Fountain Creek Watershed Flood Control & Greenway Dist
- May 12, 2026Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by george san miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
- May 12, 2026Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Julie Reeves on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
- May 12, 2026Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
- May 12, 2026Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Daniel Delgado on behalf of US Army Corps of Engineers-Pueblo
- May 12, 2026Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Erika Keech on behalf of County Attorney - Development Review
- May 12, 2026Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Lori Seago on behalf of County Attorney - Development Review
- May 12, 2026Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by April Willie on behalf of County Attorney - Development Review
- May 12, 2026Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Justin Kilgore on behalf of PCD Project Manager
- May 12, 2026Submission Triaged
- May 12, 2026Submission received from Applicant
- Jun 6, 2025Request for Review Comments returned by EPC Health Department
- May 23, 2025Request for Review Comments returned by Colorado Parks and Wildlife
- May 12, 2025Request for Review Comments returned by Mountain View Electric Association, Inc.
- May 8, 2025Submission request sent to Applicant
- May 8, 2025Request for Review Comments returned by PCD Project Manager
- May 8, 2025Request for Review Comments returned by Colorado Division of Water Resources
- May 8, 2025Request for Review Comments email resent for Project High Forest Estates Subdivision Filing No. 1 for review by Justin Kilgore on behalf of PCD Project Manager
- May 8, 2025Request for Review Comments returned by PCD Project Manager
- May 8, 2025Request for Review Comments returned by EPC DPW Stormwater
- May 8, 2025Request for Review Comments returned by EPC DPW Development Services - Engineering
- May 8, 2025Request for Review Comments returned by Colorado Geological Survey
- May 6, 2025Request for Review Comments returned by County Attorney - Development Review
- May 2, 2025Request for Review Comments returned by County Attorney - Water
- Apr 28, 2025Request for Review Comments returned by EPC Fire and Wildfire Program Manager
- Apr 28, 2025Request for Review Comments returned by Pikes Peak Regional Building Department
- Apr 18, 2025Request for Review Comments returned by EPC Environmental Services
- Apr 18, 2025Request for Review Comments returned by EPC Parks Department
- Apr 18, 2025Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
- Apr 17, 2025Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Bill Crimmel on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)(to also include the TLLU areas)
- Apr 17, 2025Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by General Email on behalf of Mountain View Electric Association, Inc.
- Apr 17, 2025Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Vicki Wood on behalf of Lewis Palmer 38
- Apr 17, 2025Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Melissa Andrews on behalf of Lewis Palmer 38
- Apr 17, 2025Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Brett Ridgway on behalf of Lewis Palmer 38
- Apr 17, 2025Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Mike Harrower on behalf of Elbert Fire Protection District
- Apr 17, 2025Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Harry Thomas on behalf of El Paso County Conservation Dist
- Apr 17, 2025Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Oliver Watkins on behalf of El Paso County Conservation Dist
- Apr 17, 2025Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Katie Miller on behalf of El Paso County Conservation Dist
- Apr 17, 2025Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Erica Carter on behalf of El Paso County Conservation Dist
- Apr 17, 2025Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by on behalf of El Paso County Conservation Dist
- Apr 17, 2025Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Mariah Hudson on behalf of El Paso County Conservation Dist
- Apr 17, 2025Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Cassie Olgren on behalf of El Paso County Conservation Dist
- Apr 17, 2025Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Billy Richard on behalf of El Paso County Conservation Dist
- Apr 17, 2025Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Dave Munger on behalf of Council of Neighborhood Organizations (CONO)
- Apr 17, 2025Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by on behalf of Pikes Peak Regional Building Department
- Apr 17, 2025Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Larry Small on behalf of Fountain Creek Watershed Flood Control & Greenway Dist
- Apr 17, 2025Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Julie Reeves on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
- Apr 17, 2025Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by george san miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
- Apr 17, 2025Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
- Apr 17, 2025Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Daniel Delgado on behalf of US Army Corps of Engineers-Pueblo
- Apr 17, 2025Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Travis Sauder on behalf of Colorado Parks and Wildlife
- Apr 17, 2025Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Tim Kroening on behalf of Colorado Parks and Wildlife
- Apr 17, 2025Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Karen Voltura on behalf of Colorado Parks and Wildlife
- Apr 17, 2025Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Carolyn Craveiro de Sa on behalf of Colorado Parks and Wildlife
- Apr 17, 2025Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Colorado Geological Survey on behalf of Colorado Geological Survey
- Apr 17, 2025Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Melissa Van Der Poel on behalf of Colorado Division of Water Resources
- Apr 17, 2025Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Joanna Williams on behalf of Colorado Division of Water Resources
- Apr 17, 2025Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
- Apr 17, 2025Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
- Apr 17, 2025Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
- Apr 17, 2025Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Jeff Kramer on behalf of EPC Sheriff's Department
- Apr 17, 2025Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Christopher Gonzalez on behalf of EPC Sheriff's Department
- Apr 17, 2025Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Andrew Prehm on behalf of EPC Sheriff's Department
- Apr 17, 2025Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by on behalf of EPC Public Works, County Engineer
- Apr 17, 2025Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by on behalf of EPC Public Works, County Engineer
- Apr 17, 2025Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by on behalf of EPC Parks Department
- Apr 17, 2025Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Mike McCarthy on behalf of EPC Health Department
- Apr 17, 2025Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Catherine McGarvy on behalf of EPC Health Department
- Apr 17, 2025Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by HEAEH LandUse on behalf of EPC Health Department
- Apr 17, 2025Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Kathy Andrew on behalf of EPC Environmental Services
- Apr 17, 2025Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Zachary Jannusch on behalf of EPC DPW Stormwater
- Apr 17, 2025Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Mikayla Hartford on behalf of EPC DPW Stormwater
- Apr 17, 2025Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Glenn Reese on behalf of EPC DPW Stormwater
- Apr 17, 2025Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Christina Prete on behalf of EPC DPW Stormwater
- Apr 17, 2025Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Gilbert LaForce on behalf of EPC DPW Development Services - Engineering
- Apr 17, 2025Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Engineering Manager on behalf of EPC DPW Development Services - Engineering
- Apr 17, 2025Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Lori Seago on behalf of County Attorney - Water
- Apr 17, 2025Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Erika Keech on behalf of County Attorney - Water
- Apr 17, 2025Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by April Willie on behalf of County Attorney - Water
- Apr 17, 2025Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Lori Seago on behalf of County Attorney - Development Review
- Apr 17, 2025Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Erika Keech on behalf of County Attorney - Development Review
- Apr 17, 2025Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by April Willie on behalf of County Attorney - Development Review
- Apr 17, 2025Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Justin Kilgore on behalf of PCD Project Manager
- Apr 17, 2025Request for Review Comments email sent for Project High Forest Estates Subdivision Filing No. 1 for review by Roland Peterson on behalf of EPC Fire and Wildfire Program Manager
- Apr 15, 2025Project Manager Assigned: Lacey Dean
- Apr 14, 2025Project Manager Assigned: Ryan Howser
- Apr 11, 2025Fees paid: 4/11/2025 (Receipt: 1010410)
- Apr 11, 2025File # Assigned: SF2512
- Apr 11, 2025Payment Request sent: 4/11/2025
- Apr 11, 2025Submission Triaged
- Apr 11, 2025Submission received from Applicant
- Apr 11, 2025Submission request sent to Applicant
- Apr 11, 2025Project Created
- Apr 11, 2025EA Assigned: EA2050