Iron Ridge Final Plat Filing No. 1
This is an application for a Final Plat for the southern portion of the Iron Ridge Development.
- Location
- WALKER RD, 80908
- Jurisdiction
- El Paso County
- Applicant
- Vertex Consulting Services Nina Ruiz
- Land owner (assessor)
- ATTICUS LAND LLC (state record)
- County project manager
- Joe Letke
- Filed
- May 1, 2025
- Parcels
- 6100000439, 6100000457
- Map
-
Parcel boundaries: Colorado public parcel data · Basemap © OpenStreetMap contributors
- Area map
- See all Tri-Lakes projects on the map
- Source record
- El Paso County EDARP file
Documents (69)
PCM - Notice of Intent to Construct a Non-Juris. Water Impoundment Structure (proof of submittal)reviewSep 10, 2026
PCM - Notice of Intent to Construct a Non-Juris. Water Impoundment Structure (proof of submittal)reviewJun 5, 2026
Neighbor Notice & Vicinity MapadditionalJun 30, 2026
"Notice of Administrative Decision" letters were mailed by PCD on 06/29/2026. The potential decision can be made after 07/13/2026. JM
Mailing LabelsadditionalJun 30, 2026
Mailing Labels for the 17 surrounding property owners. The cost to be billed to the applicant = $12.58 JM
Agency review comments (51)
County Attorney - Waterreview 2Sep 23, 2026
Please comply with all requirements in the Water Supply Review dated May 14, 2026 in File No. SP253. The plat cannot be recorded until the requirements are met.
County Attorney - Development Reviewreview 2Sep 23, 2026
No additional comments regarding 9/8/26 version of SIA. Will review again after DPW confirms collateral information.
No additional comments from County Attorney - Development Review at this time.
Erika Keech, Sr. County Attorney, erikakeech2@elpasoco.com.
Pikes Peak Regional Building Departmentreview 2Sep 23, 2026
Enumerations has no further comment.
Becky Allen
PPRBD-Enumerations
beckya@pprbd.
EPC Parks Departmentreview 2Sep 22, 2026
El Paso County Parks staff have reviewed the second submittal and have attached the second review packet.
Thank you.
Ashlyn Mathy
Parks Planner
Park Planning Division
El Paso County Parks Department
Office 719.520.6978
Mountain View Electric Association, Inc.review 2Sep 22, 2026
See attached comment letter
US Army Corps of Engineers-Puebloreview 2Sep 22, 2026
The Corps has no concerns at this time. However, the applicant should highly consider contacting the Colorado Department of Public Health and Environment, Dredge and Fill Division, to discuss impacts the drainage areas.
El Paso County Conservation Distreview 2Sep 22, 2026
The El Paso County Conservation District has reviewed the updated documents, and we appreciate the additional information with detailed topo-maps and adjustments to no build areas as needed.
As long as the relevant EPC PW and Stormwater teams are content that the added drainage infrastructure from this project are allowed, adequate, and produces no unreasonable additional loading to the Franktown Parker FPE-5 Reservoir during a major rainfall event, then EPCCD is has no further conservation related comments on this application. Thank you!
911 Authority - El Paso/Teller Countyreview 2Sep 18, 2026
Comments for E911 as follows:
Brown Rd – Acceptable logical continuation of existing.
No action for E911 on this submittal.
Thank you.
Justin
Colorado Division of Water Resourcesreview 2Sep 17, 2026
Please refer to our July 9th letter. No additional comments.
PCD Administrative Noticereview 2Sep 16, 2026
Notices already sent for this project on 6/29/2026.
EPC Health Departmentreview 1Aug 8, 2026
EPCPH comments regarding wastewater and sater suffciency.
Tri-Lakes-Monument Fire Protection Districtreview 1Jul 16, 2026
Provide a fire apparatus access exhibit showing compliance with the 2021 IFC and Monument Fire District access standards.
Submit a water distribution plan identifying hydrants, main sizes, hydrant spacing, and available fire flow or cistern placement for fire water supply
Provide an AutoTURN analysis for all cul-de-sacs and applicable intersections using the Monument Fire design vehicle.
Identify temporary fire department access during construction.
Verify all roads meet Monument Fire minimum unobstructed width, vertical clearance, grade, and turning requirements.
Provide addressing and street sign plans prior to final approval.
Coordinate future lot driveway designs with Monument Fire access requirements at the building permit stage.
Note that driveways may require vehicle turnarounds if they exceed 150 feet.
PCD Project Managerreview 1Jul 13, 2026
Planning has comments on the following version one documents:
-Application Form
-Fire Protection Report
-Letter of Intent
-Plat Drawings
-OWTS Report (please upload an unlocked version of this document)
Joe Letke
Planner
JoeLetke@elpasoco.com
PCD Project Managerreview 1Jul 13, 2026
-V1_Storm Water Management Plan (SWMP) Checklist Comments
PCD Project Managerreview 1Jul 13, 2026
-V1_Storm Water Management Plan (SWMP) Comments
PCD Project Managerreview 1Jul 13, 2026
-V1_PCM Operations & Maintenance (O&M) Manual Comments
PCD Project Managerreview 1Jul 13, 2026
-V1_PCM - Notice of Intent to Construct a Non-Juris. Water Impoundment Structure (proof of submittal) Comments
PCD Project Managerreview 1Jul 13, 2026
-V1_PCM - MHFD Detention Calcs or SDI Form Comments
PCD Project Managerreview 1Jul 13, 2026
-V1_PCM - Detention Maintenance Agreement Comments
PCD Project Managerreview 1Jul 13, 2026
-V1_PCM Applicability Form Comments
PCD Project Managerreview 1Jul 13, 2026
-V1_Grading & Erosion Control (GEC) Checklist Comments
PCD Project Managerreview 1Jul 13, 2026
-V1_Erosion and Stormwater Quality Control Permit (ESQCP) Comments
PCD Project Managerreview 1Jul 13, 2026
-V1_Traffic Impact Study Comments
PCD Project Managerreview 1Jul 13, 2026
-V1_Financial Assurance Estimate (FAE) Form Comments
PCD Project Managerreview 1Jul 13, 2026
-V1_Drainage Report - Final Comments
PCD Project Managerreview 1Jul 13, 2026
-V1_Construction Drawings (PlansProfiles) Comments
PCD Project Managerreview 1Jul 13, 2026
-V1_Soils and Geo Report Comments
PCD Project Managerreview 1Jul 13, 2026
-V1_ApplicationPetition Form Comments
EPC DPW Development Services - Engineeringreview 1Jul 13, 2026
Engineering Review V1:
Please see engineering review comments (in blue) on the following documents (to be uploaded by project manager):
Note: Due to the nature and volume of comments on certain documents, additional comments may be necessary.
V1_Closures Sheet
V1_Construction Drawings
V1_Drainage Report - Final
V1_Final Plat Drawings
V1_Financial Assurance Estimate (FAE) Form
V1_Letter of Intent
V1_Traffic Impact Study
Please replace deviation request and decision form provided in this submittal with approved copies from SP253.
Laura Besler, P.E.
Engineer - Development Services
Department of Public Works
Office: (719) 520-6868
Mobile: (719) 482-0977
laurabesler@elpasoco.com
EPC DPW Stormwaterreview 1Jul 13, 2026
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document(s):
- CDs
- Drainage Report
- ESQCP
- FAE
- GEC Checklist
- PCM Applicability Form
- PCM Maintenance Agreement
- PCM - MHFD Detention Calcs or SDI Form
- PCM - Notice of Intent to Construct a Non-Jurisdictional Water Impoundment Structure
- PCM O&M Manual
- SWMP
- SWMP Checklist
Reviewed by:
Zachary Jannusch
Associate Engineer - Stormwater
719.500.3170
ZacharyJannusch@elpasoco.com
El Paso County Conservation Distreview 1Jul 12, 2026
The El Paso County Conservation District has reviewed this application and we have the following comments:
1) Nearby Floodwater Control Dam concerns
In this filing, Parcel Number 6100000457 is shown as split into what the documents call Parcel 1 & 2. Parcel 1 is where this filing is and Parcel 2 is the eastern 35 acres of the property as shown through the assessor's page. Parcel 2 houses a flood water control dam that is controlled by El Paso County with a shared easement with EPCCD (named Franktown Parker FPE - #5). This is one of the dams that EPCCD inspects in partnership with EPC through our MOU.
This filing on the Parcel 1 side (western side of the property) has 2 things that we would like to have 2 things done prior to giving our final recommendations because of concerns with this dam and its possible implications if not correctly looked into:
1) We would like a detailed topographical map added to this that shows the elevations marked at every 5' in elevation. This map needs to have the entire property mapped out (Parcel 1 & 2), to include the exact heights of the dam and its spillway. The reason for this is because looking at this property using USGS topo maps, it shows that their lot #4 in this filing may possibly be partly or completely within the submersion zone of this dam and its spillway. Having an up-to-date topomap would help show if this is for sure the case, which may deem lot #4 or parts of others as possibly undevelopable. This is a requirement because there are no current FEMA flood maps that shows this tributary of E. Cherry Creek that would otherwise show this data.
2) This filing shows a runoff detention pond being added, which then drains directly into this dam's primary fill area. This is something we would need engineers from EPC Public Works Dept to review and see if: A) this is something that is even allowed for these dams by the county, and B) if doing this changes the inflow during significant rainfall events that this area gets (2+ inch rainfall events), which may impact things such as expected capabilities of the dam and what stresses it can handle being an earthen dam.
Once these are done, the EPCCD will be able to give its final comments on erosion controls and other natural resource related issues.
For any questions, please feel free to contact the EPCCD at 719-600-4706 or Will Vogl - Board VP at Will@EPCCD.org
County Attorney - Waterreview 1Jul 9, 2026
It would be helpful if Applicant could either upload a Water Supply Information Summary/or update the Letter of Intent that would state something to the effect of "This filing contains 25 of the 50 lots and 2 of the 3 irrigated acres reviewed with the PP. The estimated water demand has not changed" or actually list the water demand in the WSIS for each separate filing. This way, we can subtract from the total as we go along to ensure we are within the original approval amounts.
Pikes Peak Regional Building Departmentreview 1Jul 9, 2026
1. The intent letter mentions 15 lots, I only see 14. Please clarify if there are 15 or 14 lots.
2. See attached image for addressing plan. Add the addresses to the final plat prior to our review of the mylar. Plat fees will be $140.00 for the 14 addresses.
3. General Final Plat comments apply.
a. Enumerations will review the pre-plat (mylar) prior to plat for address placement, street names, and title block.
b. A $10.00 per lot and tract platting fee will be due at the time of the review of the pre-plat, (two addresses per lot and tract). If an address is not needed on a tract then no fee applies. Check should be made out to PIKES PEAK REGIONAL BUILDING DEPARTMENT or PPRBD. As of December 5th 2023, the fee for all credit/debit cards has changed from the flat 2.95% fee to the following: Over the phone Credit/Debit Card payments will be 2.3% and In-Person Debit Card payments will be 1.5% (in-person only). Paid directly to the Enumerations Department.
c. Pre-plat reviews need to be in-person. The pre-plat will be stamped by Enumerations for accuracy and returned to the applicant and the planner. All payments to be mailed to RBD via a check or credit card payment over the phone. Plats should not be recorded prior to Enumerations stamping the pre-plat and receiving payment of plat fees. If any pre-plat changes occur, even if changes do not apply to Enumerations, we still need to re-stamp the pre-plat. The Enumerations stamped pre-plat copy should match the recorded document minus a few signatures. Please schedule an in-person review, please make an appointment on our website, https://www.pprbd.org/Home/BookAppt
d. A copy of the final recorded plat is required prior to plan submittal for RESIDENTIAL Please email the Enumerations staff member that reviewed your project. BeckyA@pprbd.org
Thank you,
Becky Allen
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-799-2707 W: pprbd.org E: beckya@pprbd.org
Colorado Geological Surveyreview 1Jul 8, 2026
CGS Unique No. EP-26-0021_2 Iron Ridge Filing No. 1 – Final Plat
El Paso File No. SF2613
Location: S½ Section 13, T11S, R66W, 6th P.M.
39.0917°, -104.7266°
With this referral, we received the Final Plat (Gould Land Surveying, May 2026), Construction Documents and GEC Plans (All Terrain Engineering, May 22, 2026), Letter of Intent (Vertex Consulting Services, April 14, 2026), Stormwater Management Plan (All Terrain Engineering, June 2026), Water Resources Report (Monson, Cummins, Shohet & Farr, March 30, 2026), Wastewater Study (Entech Engineering, September 12, 2025), and other supporting documents.
CGS previously reviewed the Iron Ridge Preliminary Plan (SP253). No revised soils and geology study was submitted with this Final Plat referral. Therefore, the geologic characterization and hazard identification presented in Entech Engineering's September 2025 Soils and Geology Study remain the controlling geologic evaluation for this project. CGS continues to concur with Entech's characterization of the site geology, identified geologic hazards, and recommended mitigation measures.
We understand this referral consists of Iron Ridge Filing No. 1, a Final Plat creating fifteen rural residential lots on approximately 43.5 acres with public road improvements, individual wells, onsite wastewater treatment systems (OWTS), and associated drainage improvements.
The site does not contain any unusual geologic hazards or geotechnical constraints that would preclude the proposed subdivision, provided the recommendations contained in the geologic report are incorporated into the final design and construction. The site is underlain by the Dawson Formation and associated colluvial and alluvial deposits. Identified geologic hazards and constraints include expansive soils, localized potentially unstable slopes, downslope creep, shallow bedrock, erosion, and areas of seasonal or potentially seasonal shallow groundwater, primarily associated with mapped drainage corridors.
We offer the following comments and recommendations:
1. Groundwater. The Final Plat submittal does not include a revised geologic investigation or the groundwater monitoring program recommended during CGS's Preliminary Plan review. The available geologic information indicates that the regional Dawson aquifer is generally deep beneath the site; however, the geologic investigation documented redoximorphic features, mapped seasonal and potentially seasonal shallow groundwater areas, and identified localized conditions favorable for perched groundwater associated with shallow Dawson Formation bedrock and mapped drainage corridors. Although groundwater was not encountered during exploratory drilling, the absence of groundwater during drilling should not be interpreted as evidence that seasonal groundwater will not affect future below-grade construction. These conditions cannot be adequately characterized by a single investigation conducted over a limited period of time.
CGS continues to recommend that groundwater monitoring/observation be conducted to determine the feasibility of basement construction and to verify that proposed foundation components are maintained at least 3 feet above the maximum anticipated seasonal groundwater level throughout the year. To adequately characterize seasonal fluctuations, monitoring should include observations through spring, summer, fall, and winter and should not be initiated only during site-specific building investigations. Unless sufficient monitoring demonstrates adequate separation from seasonal high groundwater, CGS recommends that basements not be permitted.
2. Onsite Wastewater Treatment Systems. The Wastewater Study appropriately recognizes that seasonal shallow groundwater may affect OWTS placement and recommends lot-specific evaluation. Final OWTS design should maintain adequate separation from seasonal groundwater and avoid mapped drainage corridors and areas of seasonal shallow groundwater.
3. Site-Specific Investigations. Prior to the building permit application, site-specific soils and foundation investigations should be conducted for each proposed structure. These investigations should verify foundation recommendations, evaluate localized groundwater conditions where encountered, and incorporate appropriate foundation drainage measures where necessary.
4. Geologic Hazard Statement. A geologic hazard statement, consistent with the El Paso County Land Development Code, should be included on the final plat referencing the geologic report and the identified geologic hazards and constraints applicable to the site.
Submitted 7/8/2026 by Jonathan R. Lovekin, Senior Engineering Geologist, Colorado Geological Survey (jlovekin@mines.edu)
EPC Parks Departmentreview 1Jul 7, 2026
Staff has provided preliminary comments for the first review. This project will be presented before the Parks Advisory Board August 12,2026.
Thank you!
Ashlyn Mathy
Parks Planner
Park Planning Division
El Paso County Parks Department
Office 719.520.6978
County Attorney - Development Reviewreview 1Jul 1, 2026
With respect to DMA, no proposed edits to the agreement. Please resubmit with Exhibit A and Exhibit B before finalizing.
Regarding the SIA, certain track changes were accepted. It is attached with additional edits to the signature block.
Reviewed by: Erika Keech, Sr. County Attorney, erikakeech2@elpasoco.com.
PCD Administrative Noticereview 1Jun 30, 2026
On 06/29/2026, PCD mailed "Notice of Administrative Determination" letters for SF2613 to surrounding property owners within a 500-foot range (17 addresses). The potential date an administrative decision can be made is 07/14/2026. Copies of the notice, mailing labels, and selected range have been uploaded to the EDARP file. Cost of postage = $12.58. JM
Mountain View Electric Association, Inc.review 1Jun 25, 2026
No comment
911 Authority - El Paso/Teller Countyreview 1Jun 23, 2026
Comments for E911 as follows:
Brown Rd – Acceptable continuation of existing road.
No action for E911 on this submittal.
Thank you.
Justin
Land ownership timeline
- Mar 26, 2025Parcels 6100000439, 6100000457 acquired by ATTICUS LAND LLC (state record) for $1,260,000 (assessor record)
Timeline
- Sep 25, 2026Request for Review Comments returned by Colorado Geological Survey
- Sep 25, 2026Request for Review Comments returned by Tri-Lakes-Monument Fire Protection District
- Sep 23, 2026Request for Review Comments returned by County Attorney - Water
- Sep 23, 2026Request for Review Comments returned by County Attorney - Development Review
- Sep 23, 2026Request for Review Comments returned by Pikes Peak Regional Building Department
- Sep 22, 2026Request for Review Comments returned by EPC Environmental Services
- Sep 22, 2026Request for Review Comments returned by EPC Parks Department
- Sep 22, 2026Request for Review Comments returned by Mountain View Electric Association, Inc.
- Sep 22, 2026Request for Review Comments returned by US Army Corps of Engineers-Pueblo
- Sep 22, 2026Request for Review Comments returned by El Paso County Conservation Dist
- Sep 18, 2026Request for Review Comments returned by 911 Authority - El Paso/Teller County
- Sep 17, 2026Request for Review Comments returned by Colorado Division of Water Resources
- Sep 16, 2026Request for Review Comments returned by PCD Administrative Notice
- Sep 15, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Scott Benson on behalf of Tri-Lakes-Monument Fire Protection District
- Sep 15, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Jonathan Bradley on behalf of Tri-Lakes-Monument Fire Protection District
- Sep 15, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Aaron Wood on behalf of Tri-Lakes-Monument Fire Protection District
- Sep 15, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by General Email on behalf of Mountain View Electric Association, Inc.
- Sep 15, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Vicki Wood on behalf of Lewis Palmer 38
- Sep 15, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Melissa Andrews on behalf of Lewis Palmer 38
- Sep 15, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Brett Ridgway on behalf of Lewis Palmer 38
- Sep 15, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by William Vogl on behalf of El Paso County Conservation Dist
- Sep 15, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Katie Miller on behalf of El Paso County Conservation Dist
- Sep 15, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Harry Thomas on behalf of El Paso County Conservation Dist
- Sep 15, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by on behalf of El Paso County Conservation Dist
- Sep 15, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Mariah Hudson on behalf of El Paso County Conservation Dist
- Sep 15, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by on behalf of Pikes Peak Regional Building Department
- Sep 15, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
- Sep 15, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
- Sep 15, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Julie Reeves on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
- Sep 15, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
- Sep 15, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by george san miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
- Sep 15, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Daniel Delgado on behalf of US Army Corps of Engineers-Pueblo
- Sep 15, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by deric clemons on behalf of Natural Resources Conservation Service (Federal Agency)
- Sep 15, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Victoria Poulton on behalf of Colorado Parks and Wildlife
- Sep 15, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Travis Sauder on behalf of Colorado Parks and Wildlife
- Sep 15, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Tim Kroening on behalf of Colorado Parks and Wildlife
- Sep 15, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Karen Voltura on behalf of Colorado Parks and Wildlife
- Sep 15, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Peter Chapman on behalf of Colorado Parks and Wildlife
- Sep 15, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Carolyn Craveiro de Sa on behalf of Colorado Parks and Wildlife
- Sep 15, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Colorado Geological Survey on behalf of Colorado Geological Survey
- Sep 15, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Mike Matz on behalf of Colorado Division of Water Resources
- Sep 15, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Ailis Thyne on behalf of Colorado Division of Water Resources
- Sep 15, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Trish Riber on behalf of Black Hills Energy-Aquila
- Sep 15, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Marcus Henderson on behalf of Black Hills Energy-Aquila
- Sep 15, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Bob Swatek on behalf of Black Hills Energy-Aquila
- Sep 15, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by on behalf of Parks Advisory Board
- Sep 15, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by on behalf of EPC Public Works, County Engineer
- Sep 15, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by on behalf of EPC Public Works, County Engineer
- Sep 15, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by on behalf of EPC Parks Department
- Sep 15, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Catherine McGarvy on behalf of EPC Health Department
- Sep 15, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by HEAEH LandUse on behalf of EPC Health Department
- Sep 15, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Kathy Andrew on behalf of EPC Environmental Services
- Sep 15, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Zachary Jannusch on behalf of EPC DPW Stormwater
- Sep 15, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Mikayla Hartford on behalf of EPC DPW Stormwater
- Sep 15, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Glenn Reese on behalf of EPC DPW Stormwater
- Sep 15, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Erica Rylander on behalf of EPC DPW Stormwater
- Sep 15, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Christina Prete on behalf of EPC DPW Stormwater
- Sep 15, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Gilbert LaForce on behalf of EPC DPW Development Services - Engineering
- Sep 15, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Engineering Manager on behalf of EPC DPW Development Services - Engineering
- Sep 15, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Lori Seago on behalf of County Attorney - Water
- Sep 15, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Erika Keech on behalf of County Attorney - Water
- Sep 15, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by April Willie on behalf of County Attorney - Water
- Sep 15, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Lori Seago on behalf of County Attorney - Development Review
- Sep 15, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Erika Keech on behalf of County Attorney - Development Review
- Sep 15, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by April Willie on behalf of County Attorney - Development Review
- Sep 15, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Justin Kilgore on behalf of PCD Project Manager
- Sep 15, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by on behalf of PCD Administrative Notice
- Sep 15, 2026Submission Triaged
- Sep 11, 2026Submission received from Applicant
- Aug 8, 2026Request for Review Comments returned by EPC Health Department
- Jul 31, 2026Request for Review Comments returned by Colorado Parks and Wildlife
- Jul 16, 2026Request for Review Comments returned by Tri-Lakes-Monument Fire Protection District
- Jul 13, 2026Submission request sent to Applicant
- Jul 13, 2026Request for Review Comments returned by PCD Project Manager
- Jul 13, 2026Request for Review Comments returned by EPC DPW Development Services - Engineering
- Jul 13, 2026Request for Review Comments returned by EPC DPW Stormwater
- Jul 12, 2026Request for Review Comments returned by El Paso County Conservation Dist
- Jul 9, 2026Request for Review Comments returned by Colorado Division of Water Resources
- Jul 9, 2026Request for Review Comments returned by County Attorney - Water
- Jul 9, 2026Request for Review Comments returned by Pikes Peak Regional Building Department
- Jul 8, 2026Request for Review Comments returned by Colorado Geological Survey
- Jul 7, 2026Request for Review Comments returned by EPC Parks Department
- Jul 1, 2026Request for Review Comments returned by County Attorney - Development Review
- Jun 30, 2026Request for Review Comments returned by PCD Administrative Notice
- Jun 29, 2026Request for Review Comments returned by EPC Environmental Services
- Jun 25, 2026Request for Review Comments returned by Mountain View Electric Association, Inc.
- Jun 23, 2026Request for Review Comments returned by 911 Authority - El Paso/Teller County
- Jun 22, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Jonathan Bradley on behalf of Tri-Lakes-Monument Fire Protection District
- Jun 22, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Scott Benson on behalf of Tri-Lakes-Monument Fire Protection District
- Jun 22, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Aaron Wood on behalf of Tri-Lakes-Monument Fire Protection District
- Jun 22, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by General Email on behalf of Mountain View Electric Association, Inc.
- Jun 22, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Vicki Wood on behalf of Lewis Palmer 38
- Jun 22, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Melissa Andrews on behalf of Lewis Palmer 38
- Jun 22, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Brett Ridgway on behalf of Lewis Palmer 38
- Jun 22, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by William Vogl on behalf of El Paso County Conservation Dist
- Jun 22, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Harry Thomas on behalf of El Paso County Conservation Dist
- Jun 22, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Katie Miller on behalf of El Paso County Conservation Dist
- Jun 22, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by on behalf of El Paso County Conservation Dist
- Jun 22, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Mariah Hudson on behalf of El Paso County Conservation Dist
- Jun 22, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by on behalf of Pikes Peak Regional Building Department
- Jun 22, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
- Jun 22, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
- Jun 22, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Julie Reeves on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
- Jun 22, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by george san miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
- Jun 22, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
- Jun 22, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Daniel Delgado on behalf of US Army Corps of Engineers-Pueblo
- Jun 22, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by deric clemons on behalf of Natural Resources Conservation Service (Federal Agency)
- Jun 22, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Travis Sauder on behalf of Colorado Parks and Wildlife
- Jun 22, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Tim Kroening on behalf of Colorado Parks and Wildlife
- Jun 22, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Peter Chapman on behalf of Colorado Parks and Wildlife
- Jun 22, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Karen Voltura on behalf of Colorado Parks and Wildlife
- Jun 22, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Carolyn Craveiro de Sa on behalf of Colorado Parks and Wildlife
- Jun 22, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Colorado Geological Survey on behalf of Colorado Geological Survey
- Jun 22, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Mike Matz on behalf of Colorado Division of Water Resources
- Jun 22, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Ailis Thyne on behalf of Colorado Division of Water Resources
- Jun 22, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Trish Riber on behalf of Black Hills Energy-Aquila
- Jun 22, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Marcus Henderson on behalf of Black Hills Energy-Aquila
- Jun 22, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Bob Swatek on behalf of Black Hills Energy-Aquila
- Jun 22, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by on behalf of Parks Advisory Board
- Jun 22, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by on behalf of EPC Public Works, County Engineer
- Jun 22, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by on behalf of EPC Public Works, County Engineer
- Jun 22, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by on behalf of EPC Parks Department
- Jun 22, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Catherine McGarvy on behalf of EPC Health Department
- Jun 22, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by HEAEH LandUse on behalf of EPC Health Department
- Jun 22, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Kathy Andrew on behalf of EPC Environmental Services
- Jun 22, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Zachary Jannusch on behalf of EPC DPW Stormwater
- Jun 22, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Mikayla Hartford on behalf of EPC DPW Stormwater
- Jun 22, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Glenn Reese on behalf of EPC DPW Stormwater
- Jun 22, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Erica Rylander on behalf of EPC DPW Stormwater
- Jun 22, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Christina Prete on behalf of EPC DPW Stormwater
- Jun 22, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Engineering Manager on behalf of EPC DPW Development Services - Engineering
- Jun 22, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Gilbert LaForce on behalf of EPC DPW Development Services - Engineering
- Jun 22, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Erika Keech on behalf of County Attorney - Water
- Jun 22, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Lori Seago on behalf of County Attorney - Water
- Jun 22, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by April Willie on behalf of County Attorney - Water
- Jun 22, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Lori Seago on behalf of County Attorney - Development Review
- Jun 22, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Erika Keech on behalf of County Attorney - Development Review
- Jun 22, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by April Willie on behalf of County Attorney - Development Review
- Jun 22, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by Justin Kilgore on behalf of PCD Project Manager
- Jun 22, 2026Request for Review Comments email sent for Project Iron Ridge Final Plat Filing No. 1 for review by on behalf of PCD Administrative Notice
- Jun 19, 2026Fees paid: 6/19/2026 (Receipt: 1012197)
- Jun 8, 2026Payment Request sent: 6/8/2026
- Jun 8, 2026File # Assigned: SF2613
- Jun 8, 2026Submission Triaged
- Jun 8, 2026Submission received from Applicant
- Jun 8, 2026Submission request sent to Applicant
- Jun 8, 2026Submission Triaged
- Jun 5, 2026Submission received from Applicant
- May 4, 2026Project Manager Assigned: Joe Letke
- Apr 14, 2026Submission request sent to Applicant
- Apr 2, 2026Submission request sent to Applicant
- May 16, 2025Submission request sent to Applicant
- May 1, 2025Submission request sent to Applicant
- May 1, 2025Project Created
- May 1, 2025EA Assigned: EA2546
- May 1, 2025Project Manager Assigned: Lisa Elgin