Iron Ridge Preliminary Plan
Preliminary plan to include ~28 lots and 1 tract
- Location
- WALKER RD, 80908
- Jurisdiction
- El Paso County
- Applicant
- Vertex Consulting Services Nina Ruiz
- Land owner (assessor)
- ATTICUS LAND LLC
- County project manager
- Joe Letke
- Filed
- May 1, 2025
- Parcels
- 6100000439, 6100000457
- Map
-
Parcel boundaries: Colorado public parcel data · Basemap © OpenStreetMap contributors
- Source record
- El Paso County EDARP file
Documents (65)
BOCC Hearing AgendaadditionalJul 20, 2026
Hearing Agenda for the Board of County Commissioners hearing on 07/23/2026. JM
BOCC Staff Report - final with attachmentsadditionalJul 10, 2026
Staff Report for the Board of County Commissioners hearing on 07/23/2026. JM
Adopted PC MinutesadditionalJul 7, 2026
Adopted Minutes from the Planning Commission hearing on 06/18/2026. JM
Signed PC ResolutionadditionalJun 22, 2026
Recommendation from the Planning Commission hearing on 06/18/2026. JM
PC Staff Report - final with attachmentsadditionalJun 16, 2026
Updated Staff Report for the Planning Commission hearing on 06/18/2026. JM
PC & BOCC PosteradditionalJun 4, 2026
Poster for the Planning Commission hearing on 06/18/2026 and the Board of County Commissioners hearing on 07/23/2026. JM
Mailing Labels - Hearing NoticeadditionalJun 4, 2026
Mailing Labels for the 17 surrounding property owners that received notices. PCD mailed the letters on 06/03/2026. Cost = $12.58. JM
Hearing Notice & Vicinity MapadditionalJun 4, 2026
Hearing Notice for the Planning Commission hearing on 06/18/2026 and the Board of County Commissioners hearing on 07/23/2026. JM
PC Hearing AgendaadditionalJun 4, 2026
Hearing Agenda for the Planning Commission hearing on 06/18/2026. JM
Email communication between the developer and neighboring HOA presidentadditionalNov 17, 2025
This attached email is discourse between Nina Ruiz of Vertex Consulting and neighboring property owner Kirk Dickenson regarding proposal changes based upon feedback.
Mailing LabelsadditionalSep 30, 2025
Mailing Labels for the 17 surrounding property owners that received notices. Cost = $12.58. JM
Neighbor Notice & Vicinity MapadditionalSep 30, 2025
Notice of Application letters were mailed to surrounding property owners on 09/30/2025. JM
Timeline
- Jun 19, 2026Fees paid: 6/19/2026 (Receipt: 1012196)
- Jun 9, 2026Payment Request sent: 6/9/2026
- May 14, 2026Submission Triaged
- May 14, 2026Submission received from Applicant
- May 14, 2026Submission request sent to Applicant
- May 14, 2026Request for Review Comments returned by County Attorney - Water
- Apr 30, 2026Request for Review Comments returned by County Attorney - Development Review
- Apr 29, 2026Submission Triaged
- Apr 29, 2026Submission received from Applicant
- Apr 29, 2026Submission request sent to Applicant
- Apr 28, 2026Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Lori Seago on behalf of County Attorney - Water
- Apr 28, 2026Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Erika Keech on behalf of County Attorney - Water
- Apr 28, 2026Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by April Willie on behalf of County Attorney - Water
- Apr 27, 2026Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Lori Seago on behalf of County Attorney - Water
- Apr 27, 2026Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Erika Keech on behalf of County Attorney - Water
- Apr 27, 2026Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by April Willie on behalf of County Attorney - Water
- Apr 27, 2026Submission Triaged
- Apr 27, 2026Submission received from Applicant
- Apr 27, 2026Submission request sent to Applicant
- Apr 23, 2026Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Lori Seago on behalf of County Attorney - Development Review
- Apr 23, 2026Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Erika Keech on behalf of County Attorney - Development Review
- Apr 23, 2026Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by April Willie on behalf of County Attorney - Development Review
- Apr 23, 2026Submission Triaged
- Apr 23, 2026Submission received from Applicant
- Apr 22, 2026Submission request sent to Applicant
- Apr 20, 2026Request for Review Comments returned by Colorado Division of Water Resources
- Apr 13, 2026Request for Review Comments returned by County Attorney - Water
- Apr 8, 2026Request for Review Comments returned by EPC DPW Development Services - Engineering
- Apr 8, 2026Request for Review Comments returned by PCD Project Manager
- Mar 30, 2026Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Mike Matz on behalf of Colorado Division of Water Resources
- Mar 30, 2026Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Ailis Thyne on behalf of Colorado Division of Water Resources
- Mar 30, 2026Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Gilbert LaForce on behalf of EPC DPW Development Services - Engineering
- Mar 30, 2026Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Engineering Manager on behalf of EPC DPW Development Services - Engineering
- Mar 30, 2026Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Lori Seago on behalf of County Attorney - Water
- Mar 30, 2026Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Erika Keech on behalf of County Attorney - Water
- Mar 30, 2026Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by April Willie on behalf of County Attorney - Water
- Mar 30, 2026Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Justin Kilgore on behalf of PCD Project Manager
- Mar 30, 2026Submission Triaged
- Mar 30, 2026Submission received from Applicant
- Jan 26, 2026Submission request sent to Applicant
- Jan 26, 2026Request for Review Comments returned by PCD Project Manager
- Jan 26, 2026Request for Review Comments returned by EPC DPW Development Services - Engineering
- Jan 20, 2026Request for Review Comments returned by EPC DPW Stormwater
- Jan 14, 2026Request for Review Comments returned by County Attorney - Water
- Jan 12, 2026Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Ailis Thyne on behalf of Colorado Division of Water Resources
- Jan 12, 2026Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Zachary Jannusch on behalf of EPC DPW Stormwater
- Jan 12, 2026Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Mikayla Hartford on behalf of EPC DPW Stormwater
- Jan 12, 2026Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Glenn Reese on behalf of EPC DPW Stormwater
- Jan 12, 2026Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Christina Prete on behalf of EPC DPW Stormwater
- Jan 12, 2026Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Gilbert LaForce on behalf of EPC DPW Development Services - Engineering
- Jan 12, 2026Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Engineering Manager on behalf of EPC DPW Development Services - Engineering
- Jan 12, 2026Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Lori Seago on behalf of County Attorney - Water
- Jan 12, 2026Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Erika Keech on behalf of County Attorney - Water
- Jan 12, 2026Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by April Willie on behalf of County Attorney - Water
- Jan 12, 2026Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Justin Kilgore on behalf of PCD Project Manager
- Jan 12, 2026Submission Triaged
- Jan 9, 2026Submission received from Applicant
- Dec 29, 2025Submission request sent to Applicant
- Dec 29, 2025Request for Review Comments returned by PCD Project Manager
- Dec 29, 2025Request for Review Comments returned by Tri-Lakes-Monument Fire Protection District
- Dec 29, 2025Request for Review Comments returned by EPC DPW Development Services - Engineering
- Dec 29, 2025Request for Review Comments returned by EPC DPW Stormwater
- Dec 23, 2025Request for Review Comments returned by Colorado Division of Water Resources
- Dec 23, 2025Request for Review Comments returned by County Attorney - Development Review
- Dec 18, 2025Request for Review Comments returned by Pikes Peak Regional Building Department
- Dec 17, 2025Request for Review Comments returned by County Attorney - Water
- Dec 15, 2025Request for Review Comments returned by EPC Parks Department
- Dec 11, 2025Request for Review Comments returned by 911 Authority - El Paso/Teller County
- Dec 11, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Jonathan Bradley on behalf of Tri-Lakes-Monument Fire Protection District
- Dec 11, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by on behalf of Pikes Peak Regional Building Department
- Dec 11, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
- Dec 11, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
- Dec 11, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by on behalf of EPC Parks Department
- Dec 11, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Zachary Jannusch on behalf of EPC DPW Stormwater
- Dec 11, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Mikayla Hartford on behalf of EPC DPW Stormwater
- Dec 11, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Glenn Reese on behalf of EPC DPW Stormwater
- Dec 11, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Christina Prete on behalf of EPC DPW Stormwater
- Dec 11, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Gilbert LaForce on behalf of EPC DPW Development Services - Engineering
- Dec 11, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Engineering Manager on behalf of EPC DPW Development Services - Engineering
- Dec 11, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Lori Seago on behalf of County Attorney - Water
- Dec 11, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Erika Keech on behalf of County Attorney - Water
- Dec 11, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by April Willie on behalf of County Attorney - Water
- Dec 11, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Lori Seago on behalf of County Attorney - Development Review
- Dec 11, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Erika Keech on behalf of County Attorney - Development Review
- Dec 11, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by April Willie on behalf of County Attorney - Development Review
- Dec 11, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Justin Kilgore on behalf of PCD Project Manager
- Dec 11, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Roland Peterson on behalf of EPC Fire and Wildfire Program Manager
- Dec 11, 2025Submission Triaged
- Dec 11, 2025Submission received from Applicant
- Nov 13, 2025Request for Review Comments returned by US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
- Oct 30, 2025Request for Review Comments returned by El Paso County Conservation Dist
- Oct 28, 2025Request for Review Comments returned by EPC Health Department
- Oct 27, 2025Request for Review Comments returned by EPC Parks Department
- Oct 20, 2025Submission request sent to Applicant
- Oct 20, 2025Request for Review Comments returned by PCD Project Manager
- Oct 20, 2025Request for Review Comments returned by EPC DPW Development Services - Engineering
- Oct 20, 2025Request for Review Comments returned by County Attorney - Development Review
- Oct 20, 2025Request for Review Comments returned by EPC DPW Stormwater
- Oct 17, 2025Request for Review Comments returned by Pikes Peak Regional Building Department
- Oct 16, 2025Request for Review Comments returned by EPC Fire and Wildfire Program Manager
- Oct 16, 2025Request for Review Comments email resent for Project Iron Ridge Preliminary Plan for review by Roland Peterson on behalf of EPC Fire and Wildfire Program Manager
- Oct 16, 2025Request for Review Comments returned by EPC Fire and Wildfire Program Manager
- Oct 15, 2025Request for Review Comments returned by Colorado Geological Survey
- Oct 8, 2025Request for Review Comments returned by Mountain View Electric Association, Inc.
- Oct 7, 2025Request for Review Comments returned by Tri-Lakes-Monument Fire Protection District
- Oct 7, 2025Request for Review Comments returned by County Attorney - Water
- Oct 7, 2025Request for Review Comments returned by 911 Authority - El Paso/Teller County
- Sep 30, 2025Request for Review Comments returned by EPC Environmental Services
- Sep 30, 2025Request for Review Comments returned by PCD Administrative Notice
- Sep 29, 2025Request for Review Comments returned by RBD Floodplain
- Sep 29, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Trish Riber on behalf of Black Hills Energy-Aquila
- Sep 29, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Marcus Henderson on behalf of Black Hills Energy-Aquila
- Sep 29, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Bob Swatek on behalf of Black Hills Energy-Aquila
- Sep 29, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Adam Magoon on behalf of Black Hills Energy-Aquila
- Sep 29, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Jamey Bumgarner on behalf of Tri-Lakes-Monument Fire Protection District
- Sep 29, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Jonathan Bradley on behalf of Tri-Lakes-Monument Fire Protection District
- Sep 29, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by General Email on behalf of Mountain View Electric Association, Inc.
- Sep 29, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Vicki Wood on behalf of Lewis Palmer 38
- Sep 29, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Melissa Andrews on behalf of Lewis Palmer 38
- Sep 29, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Brett Ridgway on behalf of Lewis Palmer 38
- Sep 29, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Harry Thomas on behalf of El Paso County Conservation Dist
- Sep 29, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Oliver Watkins on behalf of El Paso County Conservation Dist
- Sep 29, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Katie Miller on behalf of El Paso County Conservation Dist
- Sep 29, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Erica Carter on behalf of El Paso County Conservation Dist
- Sep 29, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by on behalf of El Paso County Conservation Dist
- Sep 29, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Mariah Hudson on behalf of El Paso County Conservation Dist
- Sep 29, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Cassie Olgren on behalf of El Paso County Conservation Dist
- Sep 29, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Billy Richard on behalf of El Paso County Conservation Dist
- Sep 29, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Keith Curtis on behalf of RBD Floodplain
- Sep 29, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by on behalf of Pikes Peak Regional Building Department
- Sep 29, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
- Sep 29, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
- Sep 29, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Julie Reeves on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
- Sep 29, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by george san miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
- Sep 29, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
- Sep 29, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
- Sep 29, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Ailis Thyne on behalf of Colorado Division of Water Resources
- Sep 29, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by on behalf of EPC Parks Department
- Sep 29, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Mike McCarthy on behalf of EPC Health Department
- Sep 29, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Catherine McGarvy on behalf of EPC Health Department
- Sep 29, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by HEAEH LandUse on behalf of EPC Health Department
- Sep 29, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Kathy Andrew on behalf of EPC Environmental Services
- Sep 29, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Zachary Jannusch on behalf of EPC DPW Stormwater
- Sep 29, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Mikayla Hartford on behalf of EPC DPW Stormwater
- Sep 29, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Glenn Reese on behalf of EPC DPW Stormwater
- Sep 29, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Christina Prete on behalf of EPC DPW Stormwater
- Sep 29, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Gilbert LaForce on behalf of EPC DPW Development Services - Engineering
- Sep 29, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Engineering Manager on behalf of EPC DPW Development Services - Engineering
- Sep 29, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Lori Seago on behalf of County Attorney - Water
- Sep 29, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Erika Keech on behalf of County Attorney - Water
- Sep 29, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by April Willie on behalf of County Attorney - Water
- Sep 29, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Lori Seago on behalf of County Attorney - Development Review
- Sep 29, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Erika Keech on behalf of County Attorney - Development Review
- Sep 29, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by April Willie on behalf of County Attorney - Development Review
- Sep 29, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Justin Kilgore on behalf of PCD Project Manager
- Sep 29, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by on behalf of PCD Administrative Notice
- Sep 29, 2025Request for Review Comments email sent for Project Iron Ridge Preliminary Plan for review by Roland Peterson on behalf of EPC Fire and Wildfire Program Manager
- Sep 29, 2025Project Manager Assigned: Joe Letke
- Sep 25, 2025Fees paid: 9/25/2025 (Receipt: 1011116)
- Sep 25, 2025Payment Request sent: 9/25/2025
- Sep 25, 2025Payment Request sent: 9/25/2025
- Sep 25, 2025File # Assigned: SP253
- Sep 25, 2025Submission Triaged
- Sep 24, 2025Submission received from Applicant
- Jul 23, 2025Submission request sent to Applicant
- May 16, 2025Submission request sent to Applicant
- May 1, 2025Submission request sent to Applicant
- May 1, 2025Project Created
- May 1, 2025EA Assigned: EA2546
- May 1, 2025Project Manager Assigned: Lisa Elgin