Monument Ridge East Filing No 1
- Location
- MISTY ACRES BLVD; COUNTY LINE RD; 20255 MONUMENT HILL RD, 80132
- Jurisdiction
- El Paso County
- Applicant
- Vertex Consulting Services Nina Ruiz
- Land owner (assessor)
- MONUMENT RIDGE EAST LLC
- County project manager
- Kylie Bagley
- Filed
- Aug 3, 2021
- Parcels
- 7102200006, 7102200008, 7102200010, 7102200013, 7102201001, 7102201014
- Map
-
Parcel boundaries: Colorado public parcel data · Basemap © OpenStreetMap contributors
- Area map
- See all Tri-Lakes projects on the map
- Source record
- El Paso County EDARP file
Documents (84)
PCM - Notice of Intent to Construct a Non-Juris. Water Impoundment Structure (proof of submittal)reviewJan 5, 2026
Neighbor Notice & Vicinity MapadditionalMay 19, 2025
Notice of Application letters were mailed to surrounding property owners on 05/19/2025. JM
Mailing LabelsadditionalMay 19, 2025
Mailing Labels for the 99 surrounding property owners that received notices. Cost = $68.31. JM
Timeline
- Aug 11, 2026Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Mikayla Hartford on behalf of EPC Stormwater Review
- Aug 11, 2026Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Zachary Jannusch on behalf of EPC Stormwater Review
- Aug 11, 2026Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Glenn Reese on behalf of EPC Stormwater Review
- Aug 11, 2026Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Erica Rylander on behalf of EPC Stormwater Review
- Aug 11, 2026Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Christina Prete on behalf of EPC Stormwater Review
- Aug 11, 2026Request for Review Comments returned by PCD Project Manager
- Aug 4, 2026Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
- Jul 27, 2026Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
- Jul 27, 2026Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
- Jul 27, 2026Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Kimberly Blanchard on behalf of Colorado Department of Transportation - Pueblo Office
- Jul 27, 2026Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
- Jul 27, 2026Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Justin Kilgore on behalf of PCD Project Manager
- Jul 27, 2026Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Gilbert LaForce on behalf of PCD Engineering Division
- Jul 27, 2026Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Engineering Manager on behalf of PCD Engineering Division
- Jul 27, 2026Submission Triaged
- Jul 24, 2026Submission received from Applicant
- Jun 1, 2026Submission request sent to Applicant
- Jun 1, 2026Request for Review Comments returned by EPC Stormwater Review
- May 28, 2026Request for Review Comments returned by PCD Engineering Division
- May 27, 2026Request for Review Comments returned by PCD Project Manager
- May 27, 2026Request for Review Comments returned by Colorado Geological Survey
- May 26, 2026Request for Review Comments returned by County Attorney - Development Review
- May 21, 2026Request for Review Comments returned by Woodmoor Water and Sanitation District
- May 19, 2026Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
- May 13, 2026Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Woodmoor Water District on behalf of Woodmoor Water and Sanitation District
- May 13, 2026Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Jessie Shaffer on behalf of Woodmoor Water and Sanitation District
- May 13, 2026Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Colorado Geological Survey on behalf of Colorado Geological Survey
- May 13, 2026Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
- May 13, 2026Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
- May 13, 2026Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Kimberly Blanchard on behalf of Colorado Department of Transportation - Pueblo Office
- May 13, 2026Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
- May 13, 2026Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Zachary Jannusch on behalf of EPC Stormwater Review
- May 13, 2026Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Glenn Reese on behalf of EPC Stormwater Review
- May 13, 2026Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Mikayla Hartford on behalf of EPC Stormwater Review
- May 13, 2026Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Christina Prete on behalf of EPC Stormwater Review
- May 13, 2026Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Erika Keech on behalf of County Attorney - Development Review
- May 13, 2026Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Lori Seago on behalf of County Attorney - Development Review
- May 13, 2026Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by April Willie on behalf of County Attorney - Development Review
- May 13, 2026Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Justin Kilgore on behalf of PCD Project Manager
- May 13, 2026Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Gilbert LaForce on behalf of PCD Engineering Division
- May 13, 2026Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Engineering Manager on behalf of PCD Engineering Division
- May 13, 2026Submission Triaged
- May 13, 2026Submission received from Applicant
- Jan 29, 2026Submission request sent to Applicant
- Jan 29, 2026Request for Review Comments returned by PCD Project Manager
- Jan 29, 2026Request for Review Comments email resent for Project Monument Ridge East Filing No 1 for review by Justin Kilgore on behalf of PCD Project Manager
- Jan 28, 2026Request for Review Comments returned by PCD Engineering Division
- Jan 26, 2026Request for Review Comments returned by EPC Stormwater Review
- Jan 26, 2026Request for Review Comments returned by PCD Project Manager
- Jan 26, 2026Request for Review Comments returned by Colorado Geological Survey
- Jan 22, 2026Request for Review Comments returned by County Attorney - Development Review
- Jan 22, 2026Request for Review Comments returned by Woodmoor Water and Sanitation District
- Jan 16, 2026Request for Review Comments returned by Misty Acres Metro
- Jan 15, 2026Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
- Jan 12, 2026Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Woodmoor Water District on behalf of Woodmoor Water and Sanitation District
- Jan 12, 2026Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Jessie Shaffer on behalf of Woodmoor Water and Sanitation District
- Jan 12, 2026Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Chester Sawyer on behalf of Misty Acres Metro
- Jan 12, 2026Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Andrew Bussa on behalf of Misty Acres Metro
- Jan 12, 2026Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Colorado Geological Survey on behalf of Colorado Geological Survey
- Jan 12, 2026Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
- Jan 12, 2026Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
- Jan 12, 2026Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Kimberly Blanchard on behalf of Colorado Department of Transportation - Pueblo Office
- Jan 12, 2026Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
- Jan 12, 2026Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Zachary Jannusch on behalf of EPC Stormwater Review
- Jan 12, 2026Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Mikayla Hartford on behalf of EPC Stormwater Review
- Jan 12, 2026Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Glenn Reese on behalf of EPC Stormwater Review
- Jan 12, 2026Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Christina Prete on behalf of EPC Stormwater Review
- Jan 12, 2026Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Lori Seago on behalf of County Attorney - Development Review
- Jan 12, 2026Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Erika Keech on behalf of County Attorney - Development Review
- Jan 12, 2026Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by April Willie on behalf of County Attorney - Development Review
- Jan 12, 2026Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Justin Kilgore on behalf of PCD Project Manager
- Jan 12, 2026Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Gilbert LaForce on behalf of PCD Engineering Division
- Jan 12, 2026Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Engineering Manager on behalf of PCD Engineering Division
- Jan 12, 2026Submission Triaged
- Jan 12, 2026Submission received from Applicant
- Nov 18, 2025Request for Review Comments returned by Mountain View Electric Association, Inc.
- Nov 14, 2025Submission request sent to Applicant
- Nov 13, 2025Request for Review Comments returned by PCD Engineering Division
- Nov 12, 2025Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
- Nov 7, 2025Request for Review Comments returned by PCD Project Manager
- Nov 6, 2025Request for Review Comments returned by EPC Stormwater Review
- Nov 6, 2025Request for Review Comments returned by Colorado Geological Survey
- Nov 6, 2025Request for Review Comments returned by Misty Acres Metro
- Nov 6, 2025Request for Review Comments returned by Woodmoor Water and Sanitation District
- Oct 30, 2025Request for Review Comments returned by County Attorney - Development Review
- Oct 24, 2025Request for Review Comments returned by Pikes Peak Regional Building Department
- Oct 24, 2025Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Woodmoor Water District on behalf of Woodmoor Water and Sanitation District
- Oct 24, 2025Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Jessie Shaffer on behalf of Woodmoor Water and Sanitation District
- Oct 24, 2025Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by General Email on behalf of Mountain View Electric Association, Inc.
- Oct 24, 2025Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by on behalf of Monument
- Oct 24, 2025Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Andrew Bussa on behalf of Misty Acres Metro
- Oct 24, 2025Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Chester Sawyer on behalf of Misty Acres Metro
- Oct 24, 2025Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by on behalf of Pikes Peak Regional Building Department
- Oct 24, 2025Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Colorado Geological Survey on behalf of Colorado Geological Survey
- Oct 24, 2025Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
- Oct 24, 2025Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Kimberly Blanchard on behalf of Colorado Department of Transportation - Pueblo Office
- Oct 24, 2025Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
- Oct 24, 2025Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
- Oct 24, 2025Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Christina Prete on behalf of EPC Stormwater Review
- Oct 24, 2025Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Zachary Jannusch on behalf of EPC Stormwater Review
- Oct 24, 2025Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Mikayla Hartford on behalf of EPC Stormwater Review
- Oct 24, 2025Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Glenn Reese on behalf of EPC Stormwater Review
- Oct 24, 2025Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Lori Seago on behalf of County Attorney - Development Review
- Oct 24, 2025Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Erika Keech on behalf of County Attorney - Development Review
- Oct 24, 2025Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by April Willie on behalf of County Attorney - Development Review
- Oct 24, 2025Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Justin Kilgore on behalf of PCD Project Manager
- Oct 24, 2025Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Engineering Manager on behalf of PCD Engineering Division
- Oct 24, 2025Request for Review Comments email sent for Project Monument Ridge East Filing No 1 for review by Gilbert LaForce on behalf of PCD Engineering Division
- Oct 24, 2025Submission Triaged
- Oct 24, 2025Submission received from Applicant
- May 29, 2025Request for Review Comments returned by Misty Acres Metro
- May 29, 2025Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
- May 28, 2025Request for Review Comments returned by Mountain View Electric Association, Inc.
- May 28, 2025Submission request sent to Applicant
- May 27, 2025Submission request sent to Applicant
- May 27, 2025Submission request canceled
- May 27, 2025Request for Review Comments returned by EPC Stormwater Review
- May 27, 2025Submission request sent to Applicant
- May 24, 2025Request for Review Comments returned by PCD Engineering Division
- May 23, 2025Request for Review Comments returned by Colorado Parks and Wildlife
- May 22, 2025Request for Review Comments returned by PCD Project Manager
- May 22, 2025Request for Review Comments returned by County Attorney - Development Review
- May 20, 2025Request for Review Comments returned by Woodmoor Water and Sanitation District
- May 19, 2025Payment Request sent: 5/19/2025
- May 19, 2025Request for Review Comments returned by PCD Administrative Notice
- May 15, 2025Request for Review Comments returned by Parks Advisory Board
- May 15, 2025Request for Review Comments returned by EPC Parks Department
- May 13, 2025Request for Review Comments returned by County Attorney - Water
- May 13, 2025Request for Review Comments returned by 911 Authority - El Paso/Teller County
- May 12, 2025Request for Review Comments returned by Tri-Lakes-Monument Fire Protection District
- May 9, 2025Request for Review Comments sent for Project Monument Ridge East Filing No 1 for review by Andrew Bussa on behalf of Misty Acres Metro
- May 8, 2025Request for Review Comments returned by Pikes Peak Regional Building Department
- May 1, 2025Request for Review Comments returned by RBD Floodplain
- May 1, 2025Request for Review Comments email sent for Project Monument Ridge East Final Plat for review by Woodmoor Water District on behalf of Woodmoor Water and Sanitation District
- May 1, 2025Request for Review Comments email sent for Project Monument Ridge East Final Plat for review by Jessie Shaffer on behalf of Woodmoor Water and Sanitation District
- May 1, 2025Request for Review Comments email sent for Project Monument Ridge East Final Plat for review by Jamey Bumgarner on behalf of Tri-Lakes-Monument Fire Protection District
- May 1, 2025Request for Review Comments email sent for Project Monument Ridge East Final Plat for review by Jonathan Bradley on behalf of Tri-Lakes-Monument Fire Protection District
- May 1, 2025Request for Review Comments email sent for Project Monument Ridge East Final Plat for review by Bill Crimmel on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)(to also include the TLLU areas)
- May 1, 2025Request for Review Comments email sent for Project Monument Ridge East Final Plat for review by General Email on behalf of Mountain View Electric Association, Inc.
- May 1, 2025Request for Review Comments email sent for Project Monument Ridge East Final Plat for review by on behalf of Monument
- May 1, 2025Request for Review Comments email sent for Project Monument Ridge East Final Plat for review by Chester Sawyer on behalf of Misty Acres Metro
- May 1, 2025Request for Review Comments email sent for Project Monument Ridge East Final Plat for review by Andrew Bussa on behalf of Misty Acres Metro
- May 1, 2025Request for Review Comments email sent for Project Monument Ridge East Final Plat for review by Vicki Wood on behalf of Lewis Palmer 38
- May 1, 2025Request for Review Comments email sent for Project Monument Ridge East Final Plat for review by Melissa Andrews on behalf of Lewis Palmer 38
- May 1, 2025Request for Review Comments email sent for Project Monument Ridge East Final Plat for review by Brett Ridgway on behalf of Lewis Palmer 38
- May 1, 2025Request for Review Comments email sent for Project Monument Ridge East Final Plat for review by Douglas County on behalf of Douglas County Planning
- May 1, 2025Request for Review Comments email sent for Project Monument Ridge East Final Plat for review by Santiago Tijerina on behalf of Black Hills Energy-Aquila
- May 1, 2025Request for Review Comments email sent for Project Monument Ridge East Final Plat for review by Marcus Henderson on behalf of Black Hills Energy-Aquila
- May 1, 2025Request for Review Comments email sent for Project Monument Ridge East Final Plat for review by Bob Swatek on behalf of Black Hills Energy-Aquila
- May 1, 2025Request for Review Comments email sent for Project Monument Ridge East Final Plat for review by Adam Magoon on behalf of Black Hills Energy-Aquila
- May 1, 2025Request for Review Comments email sent for Project Monument Ridge East Final Plat for review by Keith Curtis on behalf of RBD Floodplain
- May 1, 2025Request for Review Comments email sent for Project Monument Ridge East Final Plat for review by on behalf of Pikes Peak Regional Building Department
- May 1, 2025Request for Review Comments email sent for Project Monument Ridge East Final Plat for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
- May 1, 2025Request for Review Comments email sent for Project Monument Ridge East Final Plat for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
- May 1, 2025Request for Review Comments email sent for Project Monument Ridge East Final Plat for review by Julie Reeves on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
- May 1, 2025Request for Review Comments email sent for Project Monument Ridge East Final Plat for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
- May 1, 2025Request for Review Comments email sent for Project Monument Ridge East Final Plat for review by george san miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
- May 1, 2025Request for Review Comments email sent for Project Monument Ridge East Final Plat for review by Daniel Delgado on behalf of US Army Corps of Engineers-Pueblo
- May 1, 2025Request for Review Comments email sent for Project Monument Ridge East Final Plat for review by Mike Till on behalf of Colorado State Forest Service
- May 1, 2025Request for Review Comments email sent for Project Monument Ridge East Final Plat for review by Travis Sauder on behalf of Colorado Parks and Wildlife
- May 1, 2025Request for Review Comments email sent for Project Monument Ridge East Final Plat for review by Tim Kroening on behalf of Colorado Parks and Wildlife
- May 1, 2025Request for Review Comments email sent for Project Monument Ridge East Final Plat for review by Karen Voltura on behalf of Colorado Parks and Wildlife
- May 1, 2025Request for Review Comments email sent for Project Monument Ridge East Final Plat for review by Carolyn Craveiro de Sa on behalf of Colorado Parks and Wildlife
- May 1, 2025Request for Review Comments email sent for Project Monument Ridge East Final Plat for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
- May 1, 2025Request for Review Comments email sent for Project Monument Ridge East Final Plat for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
- May 1, 2025Request for Review Comments email sent for Project Monument Ridge East Final Plat for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
- May 1, 2025Request for Review Comments email sent for Project Monument Ridge East Final Plat for review by on behalf of Parks Advisory Board
- May 1, 2025Request for Review Comments email sent for Project Monument Ridge East Final Plat for review by Zachary Jannusch on behalf of EPC Stormwater Review
- May 1, 2025Request for Review Comments email sent for Project Monument Ridge East Final Plat for review by Mikayla Hartford on behalf of EPC Stormwater Review
- May 1, 2025Request for Review Comments email sent for Project Monument Ridge East Final Plat for review by Glenn Reese on behalf of EPC Stormwater Review
- May 1, 2025Request for Review Comments email sent for Project Monument Ridge East Final Plat for review by Christina Prete on behalf of EPC Stormwater Review
- May 1, 2025Request for Review Comments email sent for Project Monument Ridge East Final Plat for review by Jeff Kramer on behalf of EPC Sheriff's Department
- May 1, 2025Request for Review Comments email sent for Project Monument Ridge East Final Plat for review by Christopher Gonzalez on behalf of EPC Sheriff's Department
- May 1, 2025Request for Review Comments email sent for Project Monument Ridge East Final Plat for review by Andrew Prehm on behalf of EPC Sheriff's Department
- May 1, 2025Request for Review Comments email sent for Project Monument Ridge East Final Plat for review by on behalf of EPC Public Works, County Engineer
- May 1, 2025Request for Review Comments email sent for Project Monument Ridge East Final Plat for review by on behalf of EPC Public Works, County Engineer
- May 1, 2025Request for Review Comments email sent for Project Monument Ridge East Final Plat for review by on behalf of EPC Parks Department
- May 1, 2025Request for Review Comments email sent for Project Monument Ridge East Final Plat for review by Lori Seago on behalf of County Attorney - Water
- May 1, 2025Request for Review Comments email sent for Project Monument Ridge East Final Plat for review by Erika Keech on behalf of County Attorney - Water
- May 1, 2025Request for Review Comments email sent for Project Monument Ridge East Final Plat for review by April Willie on behalf of County Attorney - Water
- May 1, 2025Request for Review Comments email sent for Project Monument Ridge East Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
- May 1, 2025Request for Review Comments email sent for Project Monument Ridge East Final Plat for review by Erika Keech on behalf of County Attorney - Development Review
- May 1, 2025Request for Review Comments email sent for Project Monument Ridge East Final Plat for review by April Willie on behalf of County Attorney - Development Review
- May 1, 2025Request for Review Comments email sent for Project Monument Ridge East Final Plat for review by Justin Kilgore on behalf of PCD Project Manager
- May 1, 2025Request for Review Comments email sent for Project Monument Ridge East Final Plat for review by Gilbert LaForce on behalf of PCD Engineering Division
- May 1, 2025Request for Review Comments email sent for Project Monument Ridge East Final Plat for review by Engineering Manager on behalf of PCD Engineering Division
- May 1, 2025Request for Review Comments email sent for Project Monument Ridge East Final Plat for review by on behalf of PCD Administrative Notice
- May 1, 2025Project Manager Assigned: Kylie Bagley
- May 1, 2025Fees paid: 5/1/2025 (Receipt: 1010489)
- Apr 25, 2025Payment Request sent: 4/25/2025
- Apr 25, 2025File # Assigned: SF2514
- Apr 25, 2025Submission Triaged
- Apr 24, 2025Submission received from Applicant
- Apr 23, 2025Submission request sent to Applicant
- Apr 23, 2025Submission Triaged
- Apr 22, 2025Submission received from Applicant
- Dec 20, 2024Submission request sent to Applicant
- Dec 20, 2024Submission request sent to Applicant
- Dec 20, 2024Set Applicant to Vertex Consulting Services
- Aug 3, 2021Project Created