Needles Highway 83 Subdivision Final Plat
Final Plat application to subdivide a 47-acre parcel into 16 lots. The property is proposed to be rezoned from RR-5 to RR-2.5.
- Location
- 17675 HIGHWAY 83, 80908
- Jurisdiction
- El Paso County
- Applicant
- Vertex Consulting Services, LLC Nina Ruiz
- Land owner (assessor)
- NORTH RANCH LLC (state record)
- County project manager
- Joe Letke
- Filed
- Feb 9, 2026
- Parcel
- 6100000369
- Map
-
Parcel boundaries: Colorado public parcel data · Basemap © OpenStreetMap contributors
- Area map
- See all Tri-Lakes projects on the map
- Source record
- El Paso County EDARP file
Documents (44)
PCM - Notice of Intent to Construct a Non-Juris. Water Impoundment Structure (proof of submittal)reviewAug 29, 2026
Mailing LabelsadditionalOct 7, 2026
Mailing Labels for the 36 surrounding property owners that received notices. Cost = $28.08. JM
Neighbor Notice & Vicinity MapadditionalOct 7, 2026
Notice of Application letters were mailed to surrounding property owners on 10/07/2026. JM
Agency review comments (27)
Black Hills Energy-Aquilareview 1Nov 2, 2026
BHE will serve
PCD Project Managerreview 1Oct 21, 2026
-V1 PCM Applicability Form comments
EPC DPW Development Services - Engineeringreview 1Oct 21, 2026
DPW Engineering review 1 has comments on the following documents
- Letter of Intent
- Final Plat Drawings
- Traffic Impact Study
- Drainage Report
please submit the Closure Sheets in PDF with the next submittal
revise paragraph 5 of the SIA to:
All improvements shall be completed by the Subdivider, meeting all applicable standards for preliminary acceptance, within 24 (twenty-four) months from the date of notice to proceed in the Construction Permit for the Subdivision. If the Subdivider determines that the completion date needs to be extended, the Subdivider shall submit a written request for a change in the completion date to the ECM Administrator at least 90 days in advance of the required completion date. The request shall include the reasons for the requested change in completion date, the proposed new completion date, and prove collateral is in place to cover the extension time requested. The completion date for the Subdivision may be extended one time, in writing and for a period no longer than 6 12 months, at the discretion of the ECM Administrator. A second extension of the completion date for a period of no longer than 12 months may be considered and approved, in writing, at the discretion of the Department of Public Works (DPW) Director. Any additional requests for extension of the completion date will be scheduled for hearing by the Board of County Commissioners. The ECM Administrator, DPW Director, or the Board of County Commissioners may require an adjustment in the amount of collateral to take into account any increase in cost due to the delay including inflation.
Engineering will request a 3 week review with the next submittal to have adequate time to review the CDs, FAE, and stormwater documents that were not submitted with this review.
Review by
Bret Dilts, PE
bretdilts@elpasoco.com
719-520-6864
EPC DPW Stormwaterreview 1Oct 21, 2026
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document(s):
- Drainage Report
- Final Plat Drawings
- PCM Applicability Form
Please provide the following document(s) upon resubmittal (the planner will need to send an upload request):
- ESQCP Form
- FAE Form
- GEC Plan
- GEC Checklist
- PCM Maintenance Agreement
- PCM - MHFD Detention Calcs or SDI Form
- PCM O&M Manual
- SWMP
- SWMP Checklist
Reviewed by:
Zachary Jannusch
Associate Engineer - Stormwater
719.500.3170
ZacharyJannusch@elpasoco.com
EPC Parks Departmentreview 1Oct 21, 2026
El Paso County Parks staff have reviewed the Final Plat application and have attached comments and associated fees.
Thank you.
Ashlyn Mathy
Parks Planner
Park Planning Division
El Paso County Parks Department
Office 719.520.6978
County Attorney - Development Reviewreview 1Oct 20, 2026
I will review the PCM Maintenance Agreement after it is submitted at a future review.
I will review the SIA after the FAE has been reviewed.
Erika Keech, Sr. County Attorney, erikakeech2@elpasoco.com.
Colorado Geological Surveyreview 1Oct 19, 2026
The site does not contain steep slopes, is not undermined, and does not contain, nor is it exposed to, any geologic hazards that would preclude the proposed residential use. The available referral documents include a Soils and Geology Study prepared by Entech Engineering, Inc. (Entech), dated June 16, 2026. As stated on page 10 of the report, “No significant geologic hazards were identified on the site; however, the following constraints have been identified on the site: artificial fill, potentially expansive soils, potentially shallow and seasonally shallow groundwater areas, drainage areas, downslope creep, potentially unstable slopes, and the potential for elevated radon levels.” Entech also identifies possible soil-erosion hazards and describes the site soils as mildly to highly susceptible to wind erosion and moderately to highly susceptible to water erosion.
Additionally, Figure 4 of Entech’s report shows the site's geologic constraints. Many of the 15 lots contain areas that are mapped as potentially seasonally shallow groundwater. Note 18 of the final plat states, “Areas of potential seasonal shallow groundwater have been mapped on lots 2, 3, 5, 6, 9, 10, and 15.” CGS recommends that building footprints are located outside areas mapped as containing geologic hazards/constraints.
Entech states (page 12), “If groundwater is encountered within 3 feet of foundation grade, additional drains that may include but are not limited to interceptor drains, underslab drains (capillary break) may be required.” An underdrain system should be allowed ONLY if it can gravity discharge to a daylight outfall or is connected to an existing underdrain system that gravity discharges to a daylight outfall. Individual foundation perimeter drains are intended to handle small amounts of intermittent, perched water and may NOT be used as the sole mitigation of persistent shallow groundwater conditions.
Provided Entech’s recommendations are strictly adhered to, CGS has no objection to the final plat.
Submitted 10/19/2026 by Amy Crandall, Engineering Geologist, Colorado Geological Survey (303-384-2632 or acrandall@mines.edu)
PCD Project Managerreview 1Oct 15, 2026
Planning has comments on the following Version 1 documents:
-LOI
-Site Plan Drawing
-Plat Drawing
Joe Letke
Senior Planner
JoeLetke@elpasoco.com
County Attorney - Waterreview 1Oct 15, 2026
Please upload the Amended Augmentation when available. After this has been received, and a letter from Colorado Division of Water showing sufficient water, our office will begin review.
Colorado Department of Transportation - Pueblo Officereview 1Oct 7, 2026
CDOT's comments are attached.
PCD Administrative Noticereview 1Oct 7, 2026
On 10/07/2026, PCD mailed "Notice of Application" letters to surrounding property owners within a 500-foot range (36 addresses). Copies of the notice, mailing labels, and selected range have been uploaded to the EDARP file. Cost of postage to be billed to the applicant = $28.08. JM
Tri-Lakes-Monument Fire Protection Districtreview 1Oct 7, 2026
Fire Protection Water Supply: Monument Fire District has reviewed the proposed rural fire-protection water supply concept utilizing the existing hydrant system located within the neighboring development to the south. Fire District approval of the proposed development is contingent upon receipt of a written agreement from the owner/operator of that water system confirming that the system may be utilized by Monument Fire District for emergency fire-suppression operations, including water-tender refill operations, serving The North Ranch development. The agreement shall identify the approved water source and confirm continued emergency access and use of the system. Documentation shall be provided to and accepted by Monument Fire District prior to final plat approval.
Pikes Peak Regional Building Departmentreview 1Oct 6, 2026
1. 17675 & 17725 Hwy 83, two homes and one out building. We show 17725 north on this parcel, garge in the center-17675, and second home 17675 Hwy 83.
2. All of the existing surrounding lots are recorded as tracts and not lots. What is shown as lot 28 is Tract 37. If you are going to reference the surrounding area please correct the information.
3. Since the street name is proposed to be a private street the suffix will need to change from public (Drive) to a private suffix (Point, View, Grove or Heights).
4. Each existing separate structure will require an official address change to match the new addresses propsed to be assigned to new lots. See link here for the information needed for the address changes. Three address changes will be required.
5. Contact Enumerations when you are ready to have addresses assigned.
6. Standard final plat comments:
a. Enumerations will review the pre-plat (mylar) prior to plat for address placement, street names, and title block.
b. A $10.00 per lot and tract platting fee will be due at the time of the review of the pre-plat, (two addresses per lot and tract). If an address is not needed on a tract then no fee applies. Check should be made out to PIKES PEAK REGIONAL BUILDING DEPARTMENT or PPRBD. As of December 5th 2023, the fee for all credit/debit cards has changed from the flat 2.95% fee to the following: Over the phone Credit/Debit Card payments will be 2.3% and In-Person Debit Card payments will be 1.5% (in-person only). Paid directly to the Enumerations Department.
c. Pre-plat reviews can be reviewed via “pdf” or in-person. The pre-plat will be stamped by Enumerations for accuracy and returned to the applicant and the planner. All payments to be mailed to RBD via a check or credit card payment over the phone. Plats should not be recorded prior to Enumerations stamping the pre-plat and receiving payment of plat fees. If any pre-plat changes occur, even if changes do not apply to Enumerations, we still need to re-stamp the pre-plat. The Enumerations stamped pre-plat copy should match the recorded document minus a few signatures. If you would like an in-person review, please make an appointment on our website, https://www.pprbd.org/Home/BookAppt
d. A copy of the final recorded plat is required prior to plan submittal for RESIDENTIAL. A copy of the final recorded plat is required prior to approval in the Enumerations department on any COMMERCIAL plan submittal. Please email the Enumerations staff member that reviewed your project. Amy@pprbd.org; Brent@pprbd.org; or BeckyA@pprbd.org
Amy Vanderbeek
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2930 E: Amy@pprbd.org
911 Authority - El Paso/Teller Countyreview 1Oct 6, 2026
Comments for E911 as follows:
The recommendation for E911 would be that the private road intended for this development retain the streetname Needles, but with a private suffix.
Please choose from the following private suffixes (Grove, Heights, Point, or View), and depict this name on plans with the next submittal.
Thank you.
Justin
Mountain View Electric Association, Inc.review 1Oct 5, 2026
See attached comment letter
Colorado Parks and Wildlifereview 1Oct 2, 2026
See previous comments from Colorado Parks and Wildlife.
US Army Corps of Engineersreview 1Oct 2, 2026
USACE has no comments.
Land ownership timeline
- May 1, 2026Parcel 6100000369 acquired by NORTH RANCH LLC (state record) — no sale price recorded, often a non-market transfer such as a deed into a related entity (assessor record)
Timeline
- Nov 2, 2026Request for Review Comments returned by Black Hills Energy-Aquila
- Oct 21, 2026Submission request sent to Applicant
- Oct 21, 2026Request for Review Comments returned by PCD Project Manager
- Oct 21, 2026Request for Review Comments returned by EPC DPW Development Services - Engineering
- Oct 21, 2026Request for Review Comments returned by EPC DPW Stormwater
- Oct 21, 2026Request for Review Comments returned by EPC Parks Department
- Oct 20, 2026Request for Review Comments returned by County Attorney - Development Review
- Oct 19, 2026Request for Review Comments returned by Colorado Geological Survey
- Oct 15, 2026Request for Review Comments returned by County Attorney - Water
- Oct 14, 2026Request for Review Comments returned by EPC Sheriff's Department
- Oct 7, 2026Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
- Oct 7, 2026Payment Request sent: 10/7/2026
- Oct 7, 2026Request for Review Comments returned by PCD Administrative Notice
- Oct 7, 2026Request for Review Comments returned by Tri-Lakes-Monument Fire Protection District
- Oct 6, 2026Request for Review Comments returned by Pikes Peak Regional Building Department
- Oct 6, 2026Request for Review Comments returned by 911 Authority - El Paso/Teller County
- Oct 5, 2026Request for Review Comments returned by Mountain View Electric Association, Inc.
- Oct 2, 2026Request for Review Comments returned by Colorado Parks and Wildlife
- Oct 2, 2026Request for Review Comments returned by US Army Corps of Engineers
- Oct 1, 2026Request for Review Comments returned by EPC Environmental Services
- Oct 1, 2026Request for Review Comments returned by RBD Floodplain
- Oct 1, 2026First appeared on the EDARP active list
- Sep 30, 2026Request for Review Comments email sent for Project Needles Highway 83 Subdivision Final Plat for review by Jonathan Bradley on behalf of Tri-Lakes-Monument Fire Protection District
- Sep 30, 2026Request for Review Comments email sent for Project Needles Highway 83 Subdivision Final Plat for review by Scott Benson on behalf of Tri-Lakes-Monument Fire Protection District
- Sep 30, 2026Request for Review Comments email sent for Project Needles Highway 83 Subdivision Final Plat for review by Aaron Wood on behalf of Tri-Lakes-Monument Fire Protection District
- Sep 30, 2026Request for Review Comments email sent for Project Needles Highway 83 Subdivision Final Plat for review by Keith Curtis on behalf of RBD Floodplain
- Sep 30, 2026Request for Review Comments email sent for Project Needles Highway 83 Subdivision Final Plat for review by on behalf of Pikes Peak Regional Building Department
- Sep 30, 2026Request for Review Comments email sent for Project Needles Highway 83 Subdivision Final Plat for review by Bill Crimmel on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)(to also include the TLLU areas)
- Sep 30, 2026Request for Review Comments email sent for Project Needles Highway 83 Subdivision Final Plat for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
- Sep 30, 2026Request for Review Comments email sent for Project Needles Highway 83 Subdivision Final Plat for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
- Sep 30, 2026Request for Review Comments email sent for Project Needles Highway 83 Subdivision Final Plat for review by george san miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
- Sep 30, 2026Request for Review Comments email sent for Project Needles Highway 83 Subdivision Final Plat for review by Julie Reeves on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
- Sep 30, 2026Request for Review Comments email sent for Project Needles Highway 83 Subdivision Final Plat for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
- Sep 30, 2026Request for Review Comments email sent for Project Needles Highway 83 Subdivision Final Plat for review by Daniel Delgado on behalf of US Army Corps of Engineers
- Sep 30, 2026Request for Review Comments email sent for Project Needles Highway 83 Subdivision Final Plat for review by Mike Till on behalf of Colorado State Forest Service
- Sep 30, 2026Request for Review Comments email sent for Project Needles Highway 83 Subdivision Final Plat for review by Travis Sauder on behalf of Colorado Parks and Wildlife
- Sep 30, 2026Request for Review Comments email sent for Project Needles Highway 83 Subdivision Final Plat for review by Victoria Poulton on behalf of Colorado Parks and Wildlife
- Sep 30, 2026Request for Review Comments email sent for Project Needles Highway 83 Subdivision Final Plat for review by Tim Kroening on behalf of Colorado Parks and Wildlife
- Sep 30, 2026Request for Review Comments email sent for Project Needles Highway 83 Subdivision Final Plat for review by Peter Chapman on behalf of Colorado Parks and Wildlife
- Sep 30, 2026Request for Review Comments email sent for Project Needles Highway 83 Subdivision Final Plat for review by Karen Voltura on behalf of Colorado Parks and Wildlife
- Sep 30, 2026Request for Review Comments email sent for Project Needles Highway 83 Subdivision Final Plat for review by Carolyn Craveiro de Sa on behalf of Colorado Parks and Wildlife
- Sep 30, 2026Request for Review Comments email sent for Project Needles Highway 83 Subdivision Final Plat for review by Colorado Geological Survey on behalf of Colorado Geological Survey
- Sep 30, 2026Request for Review Comments email sent for Project Needles Highway 83 Subdivision Final Plat for review by Mike Matz on behalf of Colorado Division of Water Resources
- Sep 30, 2026Request for Review Comments email sent for Project Needles Highway 83 Subdivision Final Plat for review by Ailis Thyne on behalf of Colorado Division of Water Resources
- Sep 30, 2026Request for Review Comments email sent for Project Needles Highway 83 Subdivision Final Plat for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
- Sep 30, 2026Request for Review Comments email sent for Project Needles Highway 83 Subdivision Final Plat for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
- Sep 30, 2026Request for Review Comments email sent for Project Needles Highway 83 Subdivision Final Plat for review by Kimberly Blanchard on behalf of Colorado Department of Transportation - Pueblo Office
- Sep 30, 2026Request for Review Comments email sent for Project Needles Highway 83 Subdivision Final Plat for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
- Sep 30, 2026Request for Review Comments email sent for Project Needles Highway 83 Subdivision Final Plat for review by General Email on behalf of Mountain View Electric Association, Inc.
- Sep 30, 2026Request for Review Comments email sent for Project Needles Highway 83 Subdivision Final Plat for review by Trish Riber on behalf of Black Hills Energy-Aquila
- Sep 30, 2026Request for Review Comments email sent for Project Needles Highway 83 Subdivision Final Plat for review by Marcus Henderson on behalf of Black Hills Energy-Aquila
- Sep 30, 2026Request for Review Comments email sent for Project Needles Highway 83 Subdivision Final Plat for review by Bob Swatek on behalf of Black Hills Energy-Aquila
- Sep 30, 2026Request for Review Comments email sent for Project Needles Highway 83 Subdivision Final Plat for review by on behalf of Parks Advisory Board
- Sep 30, 2026Request for Review Comments email sent for Project Needles Highway 83 Subdivision Final Plat for review by Jeff Kramer on behalf of EPC Sheriff's Department
- Sep 30, 2026Request for Review Comments email sent for Project Needles Highway 83 Subdivision Final Plat for review by Heidi Williams on behalf of EPC Sheriff's Department
- Sep 30, 2026Request for Review Comments email sent for Project Needles Highway 83 Subdivision Final Plat for review by Lizz Floro on behalf of EPC Sheriff's Department
- Sep 30, 2026Request for Review Comments email sent for Project Needles Highway 83 Subdivision Final Plat for review by on behalf of EPC Public Works, County Engineer
- Sep 30, 2026Request for Review Comments email sent for Project Needles Highway 83 Subdivision Final Plat for review by on behalf of EPC Public Works, County Engineer
- Sep 30, 2026Request for Review Comments email sent for Project Needles Highway 83 Subdivision Final Plat for review by on behalf of EPC Parks Department
- Sep 30, 2026Request for Review Comments email sent for Project Needles Highway 83 Subdivision Final Plat for review by Catherine McGarvy on behalf of EPC Health Department
- Sep 30, 2026Request for Review Comments email sent for Project Needles Highway 83 Subdivision Final Plat for review by HEAEH LandUse on behalf of EPC Health Department
- Sep 30, 2026Request for Review Comments email sent for Project Needles Highway 83 Subdivision Final Plat for review by Kathy Andrew on behalf of EPC Environmental Services
- Sep 30, 2026Request for Review Comments email sent for Project Needles Highway 83 Subdivision Final Plat for review by Zachary Jannusch on behalf of EPC DPW Stormwater
- Sep 30, 2026Request for Review Comments email sent for Project Needles Highway 83 Subdivision Final Plat for review by Mikayla Hartford on behalf of EPC DPW Stormwater
- Sep 30, 2026Request for Review Comments email sent for Project Needles Highway 83 Subdivision Final Plat for review by Glenn Reese on behalf of EPC DPW Stormwater
- Sep 30, 2026Request for Review Comments email sent for Project Needles Highway 83 Subdivision Final Plat for review by Erica Rylander on behalf of EPC DPW Stormwater
- Sep 30, 2026Request for Review Comments email sent for Project Needles Highway 83 Subdivision Final Plat for review by Christina Prete on behalf of EPC DPW Stormwater
- Sep 30, 2026Request for Review Comments email sent for Project Needles Highway 83 Subdivision Final Plat for review by Gilbert LaForce on behalf of EPC DPW Development Services - Engineering
- Sep 30, 2026Request for Review Comments email sent for Project Needles Highway 83 Subdivision Final Plat for review by Engineering Manager on behalf of EPC DPW Development Services - Engineering
- Sep 30, 2026Request for Review Comments email sent for Project Needles Highway 83 Subdivision Final Plat for review by Lori Seago on behalf of County Attorney - Water
- Sep 30, 2026Request for Review Comments email sent for Project Needles Highway 83 Subdivision Final Plat for review by Erika Keech on behalf of County Attorney - Water
- Sep 30, 2026Request for Review Comments email sent for Project Needles Highway 83 Subdivision Final Plat for review by April Willie on behalf of County Attorney - Water
- Sep 30, 2026Request for Review Comments email sent for Project Needles Highway 83 Subdivision Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
- Sep 30, 2026Request for Review Comments email sent for Project Needles Highway 83 Subdivision Final Plat for review by Erika Keech on behalf of County Attorney - Development Review
- Sep 30, 2026Request for Review Comments email sent for Project Needles Highway 83 Subdivision Final Plat for review by April Willie on behalf of County Attorney - Development Review
- Sep 30, 2026Request for Review Comments email sent for Project Needles Highway 83 Subdivision Final Plat for review by Justin Kilgore on behalf of PCD Project Manager
- Sep 30, 2026Request for Review Comments email sent for Project Needles Highway 83 Subdivision Final Plat for review by on behalf of PCD Administrative Notice
- Sep 30, 2026Fees paid: 9/30/2026 (Receipt: 1012714)
- Sep 3, 2026Project Manager Assigned: Joe Letke
- Sep 3, 2026File # Assigned: SF2622
- Sep 3, 2026Payment Request sent: 9/3/2026
- Sep 3, 2026Submission Triaged
- Sep 3, 2026Submission received from Applicant
- Sep 2, 2026Submission request sent to Applicant
- Sep 2, 2026Submission Triaged
- Sep 2, 2026Submission received from Applicant
- Feb 11, 2026Submission request sent to Applicant
- Feb 9, 2026Project Created
- Feb 9, 2026EA Assigned: EA2616