New Breed Ranch Filing No. 3
- Location
- 3250 SHOUP RD, 80908
- Jurisdiction
- El Paso County
- Applicant
- New Breed Ranch Inc. Jerome Hannigan
- Land owner (assessor)
- NEW BREED RANCH INC & C/O JAMES SCOTT
- County project manager
- Joe Letke
- Filed
- Feb 15, 2022
- Parcel
- 6210000002
- Map
-
Parcel boundaries: Colorado public parcel data · Basemap © OpenStreetMap contributors
- Area map
- See all Tri-Lakes projects on the map
- Source record
- El Paso County EDARP file
Documents (80)
Adjacent Property Owner Notification (Includes letter and certified mailing receipts)reviewJan 29, 2024
Adopted PC MinutesadditionalApr 9, 2025
Adopted Minutes from the Planning Commission hearing on 03/20/2025. JM
BOCC Staff Report - final with attachmentsadditionalMar 28, 2025
Staff Report for the Board of County Commissioners hearing on 04/10/2025. JM
Signed PC ResolutionadditionalMar 24, 2025
Recommendation from the Planning Commission hearing on 03/20/2025. JM
PC Staff Report - final with attachmentsadditionalMar 12, 2025
Staff Report for the Planning Commission hearing on 03/20/2025. JM
PC & BOCC PosteradditionalMar 4, 2025
Poster for the Planning Commission hearing on 03/20/2025 and the Board of County Commissioners hearing on 04/10/2025. JM
Hearing Notice & Vicinity MapadditionalMar 4, 2025
Hearing Notice for the Planning Commission hearing on 03/20/2025 and the Board of County Commissioners hearing on 04/10/2025. JM
Mailing Labels - Hearing NoticeadditionalMar 4, 2025
Mailing Labels for the 50 surrounding property owners that received notices. PCD mailed the letters on 03/04/2025. Cost = $34.50. JM
PC Hearing AgendaadditionalFeb 27, 2025
Hearing Agenda for the Planning Commission hearing on 03/20/2025. JM
Recorded Private Detention Basin Stormwater Quality Best Management Practice Maintenance Agreement and EasementadditionalFeb 26, 2025
Mailing LabelsadditionalApr 12, 2024
Mailing Labels for the 21 surrounding property owners that received notices. Cost = $13.44. MB
Notice of ApplicationadditionalApr 12, 2024
Notice of Application letters were mailed to surrounding property owners on 4/12/2024. MB
Agency review comments (56)
County Attorney - Development Reviewreview 6Sep 11, 2025
Signature to SIA attached.
County Attorney - Development Reviewreview 5Feb 12, 2025
Signature to DMA attached.
PCD Engineering Divisionreview 5Feb 6, 2025
Engineering Review Ver.4
No further engineer comments.
Please schedule PRECON with Brad Walters bradwalters@elpasoco.com
Drainage and Bridge fees to be paid at time of plat recording.
Road Impact Fee is applicable to be paid at time of building permit
Thank you
Edward Schoenheit, Engineer
E.P.C. Dept. of Public Works
2880 International Circle
Colorado Springs, CO. 80910
Office: 719.520.6813
Cell: 719.502.9659
https://planningdevelopment.elpasoco.com/
County Attorney - Waterreview 5Feb 6, 2025
See Water Supply Review and Recommendations.
County Attorney - Development Reviewreview 4Jan 31, 2025
1. No further comments to SIA.
2. Paragraph 3 of the DMA says that developer is building one detention basin/BMP and 2 rain gardens. The Recitals identify one rain garden. Please reconcile.
Lori Seago
Sr. County Attorney
loriseago@elpasoco.com
County Attorney - Waterreview 4Jan 27, 2025
We do not see where the water comment from 12/6/24 was addressed. Please upload the Amended Augmentation Plan that was applied for in 99CW79 (see Water Resources Report page 24). Thank you.
EPC Stormwater Reviewreview 3Jan 15, 2025
Review 3: EPC DPW Stormwater comments have been resolved on the following documents:
- ESQCP
- O&M Manual
- Private Detention Basin / Stormwater Quality BMP Maintenance Agreement
Note: All County Attorney comments must be addressed on the Private Detention Basin / Stormwater Quality BMP Maintenance Agreement and the agreement must be signed prior to Notice to Proceed.
Reviewed by:
Mikayla Hartford
Stormwater Engineer I
MikaylaHartford@elpasoco.com
PCD Engineering Divisionreview 3Jan 9, 2025
Engineering Review Ver.3
Detention Maintenance Agreement_V3 Signed copy is needed. Submittal request needed for applicant.
Pending SW Dept Comments Engineering docs will be sent for final approval signature.
Please schedule PRECON with Brad Walters bradwalters@elpasoco.com
Road Impact Fee is applicable to be paid at time of building permit for new homes.
Thank you
Edward Schoenheit, Engineer
E.P.C. Dept. of Public Works
2880 International Circle
Colorado Springs, CO. 80910
Office: 719.520.6813
Cell: 719.502.9659
https://planningdevelopment.elpasoco.com/
County Attorney - Waterreview 3Jan 2, 2025
We do not see where the water comment from 12/6/24 was addressed. If we have missed the upload of the approved amended augmentation plan, please let us know.
April Willie, Paralegal - aprilwillie@elpasoco.com
Black Forest Fire Protection Districtreview 2Dec 29, 2024
Under Fire Protection Report
All BFFRs Type 1 Engines, 712 and 711 have a 750 gallon water tank. There is no dedicated water Tender at station 2. Tender is only at station one.
Thank you
PCD Project Managerreview 3Dec 26, 2024
Planning has no further comments.
Joe Letke
Planner
joeletke@elpasoco.com
County Attorney - Development Reviewreview 2Dec 10, 2024
No further comments from County Attorney - Development Review.
Lori Seago
Sr. Asst. County Attorney
loriseago@elpasoco.com
County Attorney - Waterreview 2Dec 6, 2024
Please upload the approved amended augmentation plan.
EPC Stormwater Reviewreview 2Dec 5, 2024
Private Detention Basin / Stormwater Quality BMP Maintenance Agreement
EPC Stormwater Reviewreview 2Dec 5, 2024
Review 2: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- ESQCP
- O&M Manual
- Private Detention Basin / Stormwater Quality BMP Maintenance Agreement
EPC DPW Stormwater comments have been resolved on the following documents:
- Drainage Report
- FAE
- Final Plat
- GEC Plan
- GEC Checklist
- PBMP Applicability Form
- SWMP
- SWMP Checklist
Provide Signatures on the following documents:
- Construction Drawings
- Drainage Report
- FAE
- GEC Plan
Reviewed by:
Mikayla Hartford
Stormwater Engineer I
MikaylaHartford@elpasoco.com
PCD Engineering Divisionreview 2Dec 4, 2024
Engineering Review Ver.2
Please see engineering review comments on the following documents:
-CD_V2 Please fully sign and stamp
-FDR_V2 Please fully sign and stamp
-Final Plat_V2 Please see comments for corrections
-FAE_V2 Please see comments for corrections
-GEC_V2 Please fully sign and stamp
-TIS_V2 Owner sign TIS
-ESQCP Please provide owner signature
Thank you
Edward Schoenheit, Engineer
E.P.C. Dept. of Public Works
2880 International Circle
Colorado Springs, CO. 80910
Office: 719.520.6813
Cell: 719.502.9659
https://planningdevelopment.elpasoco.com/
PCD Project Managerreview 2Dec 4, 2024
Planning has comments on the following documents:
-Plat Drawings
Joe Letke
Planner
joeletke@elpasoco.com
EPC Sheriff's Departmentreview 1May 15, 2024
No Issues EPSO
Parks Advisory Boardreview 1May 10, 2024
El Paso County Parks and Community Services Department, Final Comments - Please See Attached Documents (Endorsed by the Park Advisory Board on 05/08/2024)
County Attorney - Development Reviewreview 1Apr 24, 2024
Requested edits to SIA attached.
PCD Project Managerreview 1Apr 24, 2024
Erosion and Stormwater Quality Control Permit (ESQCP)
PCD Engineering Divisionreview 1Apr 23, 2024
Review 1 comments on the following documents will be uploaded by the project manager:
-CD's
-FDR
-Final Plat
-FAE
-GEC
-TIS
reviewed by:
Hao Vo, Engineer II
haovo@elpasoco.com
Daniel Torres
danieltorres@elpasoco.com
PCD Project Managerreview 1Apr 23, 2024
Planning has comments on the following documents:
-Letter of Intent (one comment: please add County File No. SF247)
-Final Plat Drawings
-Water Resources Report
Joe Letke
Planner II
719-520-7964
Colorado Geological Surveyreview 1Apr 23, 2024
With this referral, we received the Final Plat (Hannigan and Associates, Inc., 3/30/2024), Letter of Intent (Hannigan and Associates, Inc., 3/23/2024), Soil and Geology Study and Wastewater Study (Rocky Mountain Group (RMG), 5/23/2023), and other documents.
The site does not contain steep slopes or flood hazards, nor is it exposed to any geologic hazards that preclude the proposed 34.7-acre parcel. RMG’s characterization of the geologic hazards associated with the site is valid. CGS, therefore, has no objection to the approval of the final plat as proposed. We offer the following comments:
As page 16 of RMG’s report states, “The most significant geologic constraints to development recognized at this site are potentially expansive soils and the potential for seasonal groundwater.” RMG did not encounter groundwater in the test holes nor observed water flowing in the drainageway during their investigation. CGS agrees with RMG that seasonally wet areas (drainageway in eastern portion of site) should be avoided by structures and OWTS. Additionally, these areas can be associated with accelerated erosion requiring setbacks. Once the residential structure locations have been identified and prior to building permit application, a site-specific geotechnical investigation consisting of drilling, sampling, lab testing, and analysis will be needed to characterize soil and bedrock engineering properties such as density, strength, water content, and swell/consolidation potential; identify potentially moisture-sensitive (expansive and collapsible) soils and expansive claystone bedrock; determine depths to groundwater and bedrock; verify the feasibility of a full-depth basement, if planned; and provide earthwork, foundation, floor system, surface and subsurface drainage, and pavement recommendations for design purposes.
Submitted 4/23/2024 by Amy Crandall, Engineering Geologist, Colorado Geological Survey (303-384-2632 or acrandall@mines.edu)
EPC Stormwater Reviewreview 1Apr 22, 2024
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents (to be uploaded by the Project Manager):
- Drainage Report
- ESQCP
- Final Plat
- FAE
- GEC Plan
- GEC Checklist
- PBMP Applicability Form
- SWMP
- SWMP Checklist
Please provide the following documents upon resubmittal (the planner will send an upload request):
- O&M Manual
- Private Detention Basin / Stormwater Quality BMP Maintenance Agreement
- SDI Form or MHFD_Detention Calcs
Reviewed by:
Mikayla Hartford
Stormwater Engineer I
MikaylaHartford@elpasoco.com
EPC Parks Departmentreview 1Apr 19, 2024
El Paso County Parks and Community Services Department, Preliminary Comments - Please See Attached Documents (To be presented to the El Paso County Park Advisory Board for endorsement on May 8, 2024)
El Paso County Conservation Distreview 1Apr 16, 2024
Please see attached .PDF for comments. Thanks!
PCD Administrative Noticereview 1Apr 12, 2024
On 4/12/2024, PCD mailed "Notice of Application" letters to surrounding property owners within a 500-foot range (21 addresses). Copies of the notice, mailing labels, and selected range have been uploaded to the EDARP file. Cost of postage to be billed to the applicant = $13.44. MB
Pikes Peak Regional Building Departmentreview 1Apr 11, 2024
1. Note: no direct access from Meadow Run Circle therefore, no addresses will be given on this street for lot 1 & 7.
2. For assignment of addressing for lots and tracts, place addressing marker (xxx) where they are intended to be utilized. Addressing marker for lots should be front door.
3. Contact the Enumerations department to have the addresses assigned to the lots. Addressing an area is a first come first serve process. Please allow sufficient amount of time for this process.
4. Standard Final Plat comments:
a. Enumerations will review the pre-plat (mylar) prior to plat for address placement, street names, and title block.
b. A $10.00 per lot and tract platting fee will be due at the time of the review of the pre-plat, (two addresses per lot and tract). If an address is not needed on a tract, then no fee applies. Check should be made out to PIKES PEAK REGIONAL BUILDING DEPARTMENT or PPRBD. Paid directly to the Enumerations Department. As of December 5th 2023, the fee for all credit/debit cards has changed from the flat 2.95% fee to the following: Over the phone Credit/Debit Card payments will be 2.3% and In-Person Debit Card payments will be 1.5% (in-person only).
c. A copy of the final recorded plat is required prior to plan submittal for RESIDENTIAL. A copy of the final recorded plat is required prior to approval in the Enumerations department on any COMMERCIAL plan submittal. Please email the Enumerations staff member that reviewed your project. Amy@pprbd.org; Brent@pprbd.org; or BeckyA@pprbd.org
d. Pre-plat reviews can be reviewed via “pdf” or in-person. The pre-plat will be stamped by Enumerations for accuracy and returned to the applicant and the planner. All payments to be mailed to RBD via a check or credit card payment over the phone. Plats should not be recorded prior to Enumerations stamping the pre-plat and receiving payment of plat fees. If any pre-plat changes occur, even if changes do not apply to Enumerations, we still need to re-stamp the pre-plat. The Enumerations stamped pre-plat copy should match the recorded document minus a few signatures. If you would like an in-person review, please make an appointment on our website, https://www.pprbd.org/Home/BookAppt
Amy Vanderbeek
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2930 E: Amy@pprbd.org
County Attorney - Waterreview 1Apr 11, 2024
Please upload an updated letter finding sufficiency from the State Engineer's Office contemplating only Filing No. 3. Thank you.
Colorado Department of Transportation - Pueblo Officereview 1Apr 4, 2024
CDOT has no comment regarding this development.
Black Forest Land Use Committeereview 1Apr 3, 2024
The Black Forest Land Use Committee recommends approval of this filing.
RBD Floodplainreview 1Apr 3, 2024
no floodplain on or within 300ft of platted lots, no further comment
911 Authority - El Paso/Teller Countyreview 1Apr 3, 2024
Comments for E911 os follows:
Old Arena Way – Acceptable and reserved for this project.
No other action for E911 on this submittal.
Thank you.
Justin
Academy SD 20 Building Fundreview 1Apr 3, 2024
Academy District 20 is in receipt of File # SF247 for approval of the New Breed Ranch Filing No. 3.
.
The District is requesting fees in lieu of land dedication per the existing County Code for all residential units within this development.
The District is able to serve each student who is a resident of District 20.
If you need additional information, please contact me.
Don Smith
Planning Consultant
Black Forest Fire Protection Districtreview 1Apr 2, 2024
We note the Fire Protection report does not meet current county expectations regarding how the applicant will meet the LDC and ECM. We also note that the applicant has accurately described an existing cistern in very close proximity to the subdivision. The fire protection report is based upon outdated information and prior expectations of County. The County having jurisdiction will need to determine if report is otherwise acceptable considering it appears applicant began process under prior county guidance.
Timeline
- Sep 23, 2026Left the EDARP active list (approved, withdrawn, or closed)
- Sep 11, 2025Request for Review Comments returned by County Attorney - Development Review
- Sep 10, 2025Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Lori Seago on behalf of County Attorney - Development Review
- Sep 10, 2025Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Erika Keech on behalf of County Attorney - Development Review
- Sep 10, 2025Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by April Willie on behalf of County Attorney - Development Review
- Sep 10, 2025Project reopened for Review Comments
- Aug 14, 2025Project Approved: 8/14/2025
- Aug 14, 2025Project Closed
- Mar 11, 2025Fees paid: 3/11/2025 (Receipt: 1010265)
- Mar 6, 2025Request for Review Comments returned by Colorado Parks and Wildlife
- Mar 5, 2025Payment Request sent: 3/5/2025
- Feb 24, 2025Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Travis Sauder on behalf of Colorado Parks and Wildlife
- Feb 24, 2025Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Tim Kroening on behalf of Colorado Parks and Wildlife
- Feb 24, 2025Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Karen Voltura on behalf of Colorado Parks and Wildlife
- Feb 24, 2025Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Carolyn Craveiro de Sa on behalf of Colorado Parks and Wildlife
- Feb 12, 2025Request for Review Comments returned by County Attorney - Development Review
- Feb 6, 2025Request for Review Comments returned by PCD Engineering Division
- Feb 6, 2025Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Lori Seago on behalf of County Attorney - Development Review
- Feb 6, 2025Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Erika Keech on behalf of County Attorney - Development Review
- Feb 6, 2025Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by April Willie on behalf of County Attorney - Development Review
- Feb 6, 2025Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Gilbert LaForce on behalf of PCD Engineering Division
- Feb 6, 2025Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Engineering Manager on behalf of PCD Engineering Division
- Feb 6, 2025Submission Triaged
- Feb 6, 2025Request for Review Comments returned by County Attorney - Water
- Feb 5, 2025Submission received from Applicant
- Feb 3, 2025Submission request sent to Applicant
- Jan 31, 2025Request for Review Comments returned by County Attorney - Development Review
- Jan 29, 2025Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Lori Seago on behalf of County Attorney - Water
- Jan 29, 2025Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Erika Keech on behalf of County Attorney - Water
- Jan 29, 2025Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by April Willie on behalf of County Attorney - Water
- Jan 29, 2025Submission Triaged
- Jan 29, 2025Submission received from Applicant
- Jan 27, 2025Submission request sent to Applicant
- Jan 27, 2025Request for Review Comments returned by County Attorney - Water
- Jan 21, 2025Submission Triaged
- Jan 21, 2025Submission received from Applicant
- Jan 16, 2025Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Lori Seago on behalf of County Attorney - Development Review
- Jan 16, 2025Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Erika Keech on behalf of County Attorney - Development Review
- Jan 16, 2025Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by April Willie on behalf of County Attorney - Development Review
- Jan 15, 2025Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Lori Seago on behalf of County Attorney - Water
- Jan 15, 2025Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Erika Keech on behalf of County Attorney - Water
- Jan 15, 2025Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by April Willie on behalf of County Attorney - Water
- Jan 15, 2025Request for Review Comments returned by EPC Stormwater Review
- Jan 14, 2025Submission request sent to Applicant
- Jan 14, 2025Submission request sent to Applicant
- Jan 9, 2025Request for Review Comments returned by PCD Engineering Division
- Jan 9, 2025Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Bill Crimmel on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)(to also include the TLLU areas)
- Jan 9, 2025Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Mikayla Hartford on behalf of EPC Stormwater Review
- Jan 9, 2025Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Glenn Reese on behalf of EPC Stormwater Review
- Jan 9, 2025Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Christina Prete on behalf of EPC Stormwater Review
- Jan 2, 2025Request for Review Comments returned by County Attorney - Water
- Jan 2, 2025Request for Review Comments returned by Black Forest Fire Protection District
- Dec 26, 2024Request for Review Comments returned by PCD Project Manager
- Dec 26, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Lori Seago on behalf of County Attorney - Water
- Dec 26, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Erika Keech on behalf of County Attorney - Water
- Dec 26, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by April Willie on behalf of County Attorney - Water
- Dec 26, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Justin Kilgore on behalf of PCD Project Manager
- Dec 26, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Gilbert LaForce on behalf of PCD Engineering Division
- Dec 26, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Engineering Manager on behalf of PCD Engineering Division
- Dec 26, 2024Submission Triaged
- Dec 26, 2024Submission received from Applicant
- Dec 10, 2024Request for Review Comments returned by County Attorney - Development Review
- Dec 6, 2024Request for Review Comments returned by County Attorney - Water
- Dec 5, 2024Submission request sent to Applicant
- Dec 5, 2024Request for Review Comments returned by PCD Project Manager
- Dec 5, 2024Request for Review Comments returned by EPC Stormwater Review
- Dec 4, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Lori Seago on behalf of County Attorney - Development Review
- Dec 4, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Erika Keech on behalf of County Attorney - Development Review
- Dec 4, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by April Willie on behalf of County Attorney - Development Review
- Dec 4, 2024Request for Review Comments returned by PCD Engineering Division
- Nov 21, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by on behalf of Black Forest Fire Protection District
- Nov 21, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Mikayla Hartford on behalf of EPC Stormwater Review
- Nov 21, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Glenn Reese on behalf of EPC Stormwater Review
- Nov 21, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Christina Prete on behalf of EPC Stormwater Review
- Nov 21, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Lori Seago on behalf of County Attorney - Water
- Nov 21, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Erika Keech on behalf of County Attorney - Water
- Nov 21, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by April Willie on behalf of County Attorney - Water
- Nov 21, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Justin Kilgore on behalf of PCD Project Manager
- Nov 21, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Gilbert LaForce on behalf of PCD Engineering Division
- Nov 21, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Engineering Manager on behalf of PCD Engineering Division
- Nov 21, 2024Submission request canceled
- Nov 21, 2024Submission request sent to Applicant
- Nov 21, 2024Submission Triaged
- Nov 21, 2024Submission received from Applicant
- Oct 28, 2024Submission request sent to Applicant
- Oct 28, 2024Submission Triaged
- Oct 26, 2024Submission received from Applicant
- Jun 26, 2024Request for Review Comments returned by Colorado Division of Water Resources
- Jun 26, 2024Request for Review Comments email resent for Project New Breed Ranch Filing No. 3 for review by Joanna Williams on behalf of Colorado Division of Water Resources
- Jun 2, 2024Request for Review Comments returned by EPC Health Department
- May 22, 2024Request for Review Comments returned by Colorado Division of Water Resources
- May 15, 2024Request for Review Comments returned by EPC Sheriff's Department
- May 10, 2024Request for Review Comments returned by Parks Advisory Board
- Apr 24, 2024Request for Review Comments returned by County Attorney - Development Review
- Apr 24, 2024Submission request sent to Applicant
- Apr 24, 2024Request for Review Comments returned by PCD Project Manager
- Apr 24, 2024Request for Review Comments email resent for Project New Breed Ranch Filing No. 3 for review by Kari Parsons on behalf of PCD Project Manager
- Apr 23, 2024Submission request sent to Applicant
- Apr 23, 2024Request for Review Comments returned by PCD Project Manager
- Apr 23, 2024Request for Review Comments returned by PCD Engineering Division
- Apr 23, 2024Request for Review Comments returned by Colorado Geological Survey
- Apr 22, 2024Request for Review Comments returned by EPC Stormwater Review
- Apr 19, 2024Request for Review Comments returned by EPC Parks Department
- Apr 16, 2024Request for Review Comments returned by El Paso County Conservation Dist
- Apr 12, 2024Request for Review Comments returned by PCD Administrative Notice
- Apr 11, 2024Request for Review Comments returned by Pikes Peak Regional Building Department
- Apr 11, 2024Request for Review Comments returned by County Attorney - Water
- Apr 5, 2024Request for Review Comments returned by EPC Environmental Services
- Apr 4, 2024Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
- Apr 3, 2024Request for Review Comments returned by Black Forest Land Use Committee
- Apr 3, 2024Request for Review Comments returned by RBD Floodplain
- Apr 3, 2024Request for Review Comments returned by 911 Authority - El Paso/Teller County
- Apr 3, 2024Request for Review Comments returned by Academy SD 20 Building Fund
- Apr 2, 2024Request for Review Comments returned by Black Forest Fire Protection District
- Apr 2, 2024File # Assigned: SF247
- Apr 2, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Bill Crimmel on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)(to also include the TLLU areas)
- Apr 2, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Katie Miller on behalf of El Paso County Conservation Dist
- Apr 2, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Mariah Hudson on behalf of El Paso County Conservation Dist
- Apr 2, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Terry Stokka on behalf of Black Forest Land Use Committee
- Apr 2, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Terry Stokka on behalf of Black Forest Land Use Committee
- Apr 2, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by PJ Langmaid on behalf of Black Forest Fire Protection District
- Apr 2, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Black Forest Fire Chief on behalf of Black Forest Fire Protection District
- Apr 2, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Tom Gregory on behalf of Academy SD 20 Building Fund
- Apr 2, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Donald Smith on behalf of Academy SD 20 Building Fund
- Apr 2, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Becky Allan on behalf of Academy SD 20 Building Fund
- Apr 2, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Keith Curtis on behalf of RBD Floodplain
- Apr 2, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by on behalf of Pikes Peak Regional Building Department
- Apr 2, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
- Apr 2, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
- Apr 2, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Colorado Geological Survey on behalf of Colorado Geological Survey
- Apr 2, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Melissa Van Der Poel on behalf of Colorado Division of Water Resources
- Apr 2, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Joanna Williams on behalf of Colorado Division of Water Resources
- Apr 2, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
- Apr 2, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
- Apr 2, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Arthur Gonzales on behalf of Colorado Department of Transportation - Pueblo Office
- Apr 2, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
- Apr 2, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by on behalf of Parks Advisory Board
- Apr 2, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Mikayla Hartford on behalf of EPC Stormwater Review
- Apr 2, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Glenn Reese on behalf of EPC Stormwater Review
- Apr 2, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Christina Prete on behalf of EPC Stormwater Review
- Apr 2, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Jeff Kramer on behalf of EPC Sheriff's Department
- Apr 2, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Christopher Gonzalez on behalf of EPC Sheriff's Department
- Apr 2, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Andrew Prehm on behalf of EPC Sheriff's Department
- Apr 2, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by on behalf of EPC Parks Department
- Apr 2, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Mike McCarthy on behalf of EPC Health Department
- Apr 2, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Catherine McGarvy on behalf of EPC Health Department
- Apr 2, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by HEAEH LandUse on behalf of EPC Health Department
- Apr 2, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Kathy Andrew on behalf of EPC Environmental Services
- Apr 2, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Lori Seago on behalf of County Attorney - Water
- Apr 2, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by April Willie on behalf of County Attorney - Water
- Apr 2, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Lori Seago on behalf of County Attorney - Development Review
- Apr 2, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by April Willie on behalf of County Attorney - Development Review
- Apr 2, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Kari Parsons on behalf of PCD Project Manager
- Apr 2, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Gilbert LaForce on behalf of PCD Engineering Division
- Apr 2, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by Engineering Manager on behalf of PCD Engineering Division
- Apr 2, 2024Request for Review Comments email sent for Project New Breed Ranch Filing No. 3 for review by on behalf of PCD Administrative Notice
- Apr 2, 2024Project Manager Assigned: Joe Letke
- Apr 1, 2024Fees paid: 4/1/2024 (Receipt: 1008949)
- Apr 1, 2024File # Assigned: SF246
- Apr 1, 2024Payment Request sent: 4/1/2024
- Apr 1, 2024Submission Triaged
- Mar 30, 2024Submission received from Applicant
- Mar 29, 2024Submission request sent to Applicant
- Mar 29, 2024Submission Triaged
- Mar 28, 2024Submission received from Applicant
- Feb 29, 2024Submission request sent to Applicant
- Feb 29, 2024Submission Triaged
- Feb 28, 2024Submission received from Applicant
- Jun 20, 2023Submission request sent to Applicant
- Feb 10, 2023Submission request sent to Applicant
- Feb 15, 2022Submission request sent to Applicant
- Feb 15, 2022Project Created
- Feb 15, 2022EA Assigned: EA2214
- Feb 15, 2022Project Manager Assigned: Ryan Howser