North Bay at Lake Woodmoor Final Plat (2025)

Final plat SF263 Active

Updated Final Plat for North Bay at Lake Woodmoor for 6 residential lots. Subject to PUD approval.

Location
DEER CREEK RD; WOODMOOR DR, 80132
Jurisdiction
El Paso County
Applicant
HR Green Inc. Blaine Perkins
Land owner (assessor)
LAKE WOODMOOR HOLDINGS LLC (state record)
County project manager
Joe Letke
Filed
Aug 22, 2025
Parcels
7111400007, 7111404111
Map
Parcel boundaries: Colorado public parcel data · Basemap © OpenStreetMap contributors
Area map
See all Tri-Lakes projects on the map
Source record
El Paso County EDARP file

Documents (60)

No-Rise CertificationreviewJul 23, 2026
PCM Applicability FormreviewJul 23, 2026
Water Resources ReportreviewJul 23, 2026
Wastewater Treatment ReportreviewJul 23, 2026
Letter of IntentreviewJul 23, 2026
Soils & Geology ReportreviewJul 23, 2026
Final Plat DrawingsreviewJul 23, 2026
Drainage Report - FinalreviewJul 23, 2026
Traffic Impact StudyreviewJan 30, 2026
Landscape Plan drawingsreviewJan 30, 2026
Clearance Letter - USF&WreviewJan 28, 2026
FEMA LOMR, CLOMR, LOMAreviewJan 28, 2026
Forestry Management PlanreviewJan 28, 2026
Wetland Impact LetterreviewJan 28, 2026
Fire Protection ReportreviewJan 28, 2026
Closures Sheet (Survey)reviewJan 28, 2026
Application/Petition FormreviewJan 28, 2026
Returned NoticesadditionalApr 30, 2026
Received 4/29/2026
returned noticeadditionalApr 9, 2026
04/09/26
returned noticeadditionalMar 24, 2026
3/23/26
Mailing LabelsadditionalMar 11, 2026
Mailing Labels for the 68 surrounding property owners that received notices. Cost = $50.32. JM
Selected RangeadditionalMar 11, 2026
Selected Range was 500 feet. JM
Neighbor Notice & Vicinity MapadditionalMar 11, 2026
Notice of Application letters were mailed to surrounding property owners on 03/11/2026. JM

Agency review comments (88)

Comments returned by referral agencies during review, from the county's public EDARP file. Some agencies attach a letter instead of (or alongside) written comments.

Colorado Division of Water Resourcesreview 3Sep 4, 2026
There appears to be no substantive change to the water supply with this update. Please refer to our prior comments (attached) from February 2026.
View attached comment letter
County Attorney - Development Reviewreview 4Aug 31, 2026
My recommendation is to combine the Detention Maintenance Agreement and Channel Maintenance Agreement into one Agreement that includes all of the improvements. Will work with engineering to generate a proposed agreement and will include the draft agreement in a future submittal. Reviewed by: Erika Keech, Sr. County Attorney, erikakeech2@elpasoco.com.
Road Impact Fee Administratorreview 3Aug 31, 2026
I see no documents requiring review by the RIF Manager. VictoriaChavez@elpasoco.com
PCD Project Managerreview 2Aug 26, 2026
-V2_Utility Construction Drawings Comments
View attached comment letter
PCD Project Managerreview 2Aug 26, 2026
-+V2_Soils & Geology Report Comments
View attached comment letter
PCD Project Managerreview 2Aug 26, 2026
-V2_Road Impact Fee Acknowledgment Form Comments
View attached comment letter
PCD Project Managerreview 2Aug 26, 2026
-V2_No-Rise Certification Comments
View attached comment letter
PCD Project Managerreview 2Aug 26, 2026
-V2_Letter of Intent Comments
View attached comment letter
PCD Project Managerreview 2Aug 26, 2026
-V2_Grading & Erosion Control (GEC) Plan Comments
View attached comment letter
PCD Project Managerreview 2Aug 26, 2026
-V2_Financial Assurance Estimate (FAE) Form
View attached comment letter
PCD Project Managerreview 2Aug 26, 2026
-V2_Final Plat Drawings Comments
View attached comment letter
PCD Project Managerreview 2Aug 26, 2026
-V2_Drainage Report - Final Comments
View attached comment letter
PCD Project Managerreview 2Aug 26, 2026
-V2_Construction Drawings (PlansProfiles)
View attached comment letter
PCD Project Managerreview 2Aug 26, 2026
-V2_Channel Maintenance Agreement Comments
View attached comment letter
PCD Project Managerreview 2Aug 26, 2026
Planning has comments on the following version 2 documents: -Letter of Intent -Final Plat Drawings -Soils and Geo Report Joe Letke Planner JoeLetke@elpasoco.com
EPC DPW Development Services - Engineeringreview 3Aug 25, 2026
SF263: North Bay at Lake Woodmoor PUD DPW LD _ Engineering Review 2. PUD252 EA24-135 Engineering Comments have been provided on the following documents (to be uploaded by Project Manager): V2_Channel Maintenance Agreement (Reminder: Easements legal description to be provided in following submittal on page 16 after verifying there are no major comments remaining that may affect placement of easements. V2_ Construction Drawings (Plans Profiles) V2_Drainage Report - Final V2_Final Plat Drawings V2_Utility Plan V2_Financial Assurance Estimate (FAE) Form V2_Grading & Erosion Control (GEC) Plan V2_No-Rise Certification V2_Road Impact Fee Acknowledgment Form The following documents have no comments: V2_Letter of Intent LOI V2_Soils & Geology Report The comments for the following documents were provided with PUD252 review dated 8/12/2026 1:43:01 PM: V3 - PUD Development Plans V3 - Landscape Plan V2_Traffic Impact Study Applicant Notes: I am requesting in person RCR “Review Comment Resolution” meeting prior to resubmittal to make sure all comments are addressed, so we can move this project forward to approval. The applicant must upload to EDARP the revised items indicated below with his/her resubmittal: V3_Channel Maintenance Agreement (Reminder: Easements legal description to be provided in following submittal on page 16 after verifying there are no major comments remaining that may affect placement of easements. V3_ Construction Drawings (Plans Profiles) V3_Drainage Report – Final V3_Final Plat Drawings V2_Utility Plan V3_Financial Assurance Estimate (FAE) Form V3_Grading & Erosion Control (GEC) Plan V3_No-Rise Certification V3_Road Impact Fee Acknowledgment Form FYI: 1. Two driveway Access Permits shall be issued for this project. 2. ROW permit must be issued for the construction work for the relocated Stormwater pipeline for the portion in the ROW. 3. Basin fee & Bridge Fee are applicable. 2026 Basin fee is $27,282 per impervious acre and Bridge Fee is $1,492 per impervious acre. 4. The ECM Administrator will sign and date the plans, reports, and documents after you make your final submittal (make sure ALL comments are addressed before you make your final submittal and the plans, reports, and documents have no additional comments). Reviewed by: Jalal Jalal Saleh, PE jalalsaleh@elpasoco.com 361-687-3384 Jeff Rice, PE, Drainage Planning Manager • Department of Transportation JeffRice@elpasoco.com
EPC DPW Stormwaterreview 3Aug 24, 2026
PCM Applicability Form comments
View attached comment letter
EPC DPW Stormwaterreview 3Aug 24, 2026
PCM O&M Manual comments
View attached comment letter
EPC DPW Stormwaterreview 3Aug 24, 2026
Review 2: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document(s): - Drainage Report ...................(to be uploaded by DS engineer) - GEC Plan ..............................(to be uploaded by DS engineer) - PCM Applicability Form - PCM O&M Manual EPC DPW Stormwater comments have been resolved on the following document(s): - Channel Maintenance Agreement - ESQCP - FAE - GEC Checklist - PCM Maintenance Agreement - SWMP - SWMP Checklist Reviewed by: Zachary Jannusch Associate Engineer - Stormwater 719.500.3170 ZacharyJannusch@elpasoco.com
County Attorney - Development Reviewreview 3Aug 21, 2026
1) Regarding the SIA, please fill in the blanks. SIA will be reviewed in a future submittal once it is completed. 2) Regarding the Stormwater Maintenance Agreement, thank you for making previous changes. Please submit Exhibit B in future submittal. It should include a map clearly depicting the location of the easement in relation to the pond. Erika Keech Sr. County Attorney
Colorado Geological Surveyreview 3Aug 20, 2026
Colorado Geological Survey (CGS) Review Comments Project: North Bay at Lake Woodmoor – Final Plat SF263; CGS Project EP-17-0024_8 As requested in El Paso County email dated August 3, 2026, CGS reviewed the North Bay at Lake Woodmoor Final Plat submittal, located at 39.1048, -104.8561, including the March 11, 2026 CTL|Thompson Geologic Hazards Evaluation and Preliminary Geotechnical Investigation Update, Final Plat, construction drawings, grading and erosion control plans, and Final Drainage Report. CGS's August 11, 2026 review of PUD252 addressed the geologic compatibility of the six-lot development configuration; this Final Plat review considers the additional access, drainage, and channel-stabilization information submitted under SF263. CGS understands that the proposed development consists of six single-family residential lots with two private access drives and associated grading, utilities, and drainage improvements. The primary unresolved geologic hazard for the Final Plat is fluvial erosion and scour associated with the Lake Fork of Dirty Woman Creek drainage corridor. Fluvial Hazard Evaluation CGS generally agrees with the geologic interpretation and identification of geologic hazards presented in the submitted reports. The Final Drainage Report evaluates hydraulic conditions within the Lake Fork corridor, identifies areas of elevated erosive potential, and proposes channel stabilization. The residential lots are located outside the mapped and modeled 100-year floodplain; however, the Redbridge Point access crosses the floodplain and associated channel improvements are located within the active drainage corridor. The submitted information does not clearly demonstrate whether scour, stream-bank erosion, or lateral channel migration could undermine the Redbridge Point access or associated improvements. For the County to determine that the proposed subdivision is compatible with the identified hazard, these fluvial processes should be addressed in relation to the proposed access and channel stabilization. CGS recommends that the applicant's engineer supplement the submitted evaluation to address scour, stream-bank erosion, and lateral channel migration at the Redbridge Point access and associated channel improvements, and demonstrate that the proposed stabilization approach is appropriate for the anticipated conditions without materially increasing fluvial-hazard exposure upstream or downstream. CGS has no objection to conditional approval of SF263, provided the fluvial-hazard issue identified above is resolved to the satisfaction of El Paso County. Submitted August 20, 2026 by Jonathan R. Lovekin, Senior Engineering Geologist, Colorado Geological Survey, jlovekin@mines.edu
County Attorney - Waterreview 3Aug 17, 2026
Please address comments from 3/3/26.
EPC Sheriff's Departmentreview 3Aug 9, 2026
This application states it is covered by Monument Fire for fire protection. The Fire Commitment Letter and application review should be completed by Monument Fire, not EPSO Wildland. Thank you.
911 Authority - El Paso/Teller Countyreview 3Aug 3, 2026
Comments for E911 as follows: Redbridge Pt – Previously approved and reserved Shoreditch Hts – Previously approved and reserved No action for E911 on this submittal. Thank you. Justin
US Army Corps of Engineers-Puebloreview 3Aug 3, 2026
If the applicant has determined the activity would involve the discharge of dredged or fill material into an aquatic resource (e.g. stream, creek, wetland, pond, etc.), please have them contact our office at SPA-RD-CO@usace.army.mil for a determination of permitting requirements.
RBD Floodplainreview 3Aug 3, 2026
when ready please submit directly to the Regional Floodplain office your application for work in the floodplain. No further comment .
Central CO Conservation Districtreview 1Apr 2, 2026
FYI, this should have been sent to the El Paso County Conservation District as this is their area, as Central Colorado Conservation District does not cover this property. Thank you!
County Attorney - Development Reviewreview 2Mar 12, 2026
It is not clear why two Stormwater Facility Maintenance Agreements were submitted. I previously submitted comments to the Word version of the document titled: "PCM Maintenance Agreement." A PDF "Channel Maintenance Agreement" was also uploaded. Word versions of such documents are required. If the applicant would like to submit the Maintenance Agreement PDF exhibits for review, please submit them separately and label them accordingly. The submitted "Channel Maintenance Agreement" PDF appears to have the same issues as the Word version with respect to the name of the HOA. Please address the previous comments in the PCM Maintenance Agreement and, unless engineering requires two agreements, submit one version in WORD (editable format) for subsequent review. Erika Keech Sr. County Attorney
PCD Administrative Noticereview 1Mar 11, 2026
On 03/11/2026, PCD mailed "Notice of Application" letters to surrounding property owners within a 500-foot range (68 addresses). Copies of the notice, mailing labels, and selected range have been uploaded to the EDARP file. Cost of postage to be billed to the applicant = $50.32. JM
PCD Project Managerreview 1Mar 11, 2026
V1_Water Resources Report
View attached comment letter
PCD Project Managerreview 1Mar 11, 2026
V1_Wastewater Treatment Report
View attached comment letter
PCD Project Managerreview 1Mar 11, 2026
V1_Soils & Geology Report
View attached comment letter
PCD Project Managerreview 1Mar 11, 2026
V1_Natural Landforms, Vegetation, Riparian Analysis
View attached comment letter
PCD Project Managerreview 1Mar 11, 2026
V1_Letter of Intent
View attached comment letter
PCD Project Managerreview 1Mar 11, 2026
V1_Final Plat Drawings
View attached comment letter
PCD Project Managerreview 1Mar 11, 2026
V1_Commitment letter from water service provider
View attached comment letter
PCD Project Managerreview 1Mar 11, 2026
V1_Commitment letter from waste water service provider
View attached comment letter
PCD Project Managerreview 1Mar 11, 2026
EPC Planning Review 1 Comments: Please see comments on the following documents: - V1_Final Plat Drawings - V1_Letter of Intent - V1_Commitment letter from water service provider - V1_Commitment letter from waste water service provider - V1_Natural Landforms, Vegetation, Riparian Analysis - V1_Soils & Geology Report - V1_Water Resources Report - V1_Wastewater Treatment Report Reviewed by: Maria Lancto, AICP, Senior Planner marialancto@elpasoco.com 719-520-6447
EPC DPW Stormwaterreview 1Mar 10, 2026
PCM Maintenance Agreement Redlines
View attached comment letter
EPC DPW Stormwaterreview 1Mar 10, 2026
SWMP Redlines
View attached comment letter
EPC DPW Stormwaterreview 1Mar 10, 2026
SWMP Checklist Redlines
View attached comment letter
EPC DPW Stormwaterreview 1Mar 10, 2026
PCM Applicability Form Redlines
View attached comment letter
EPC DPW Stormwaterreview 1Mar 10, 2026
GEC Checklist Redlines
View attached comment letter
EPC DPW Stormwaterreview 1Mar 10, 2026
ESQCP Redlines
View attached comment letter
EPC DPW Stormwaterreview 1Mar 10, 2026
Utilities Drawings Redlines
View attached comment letter
EPC DPW Stormwaterreview 1Mar 10, 2026
SIA Redlines
View attached comment letter
EPC DPW Stormwaterreview 1Mar 10, 2026
RIF Acknowledgement Form Redlines
View attached comment letter
EPC DPW Stormwaterreview 1Mar 10, 2026
GEC Plan Redlines
View attached comment letter
EPC DPW Stormwaterreview 1Mar 10, 2026
FAE Form Redlines
View attached comment letter
EPC DPW Stormwaterreview 1Mar 10, 2026
Drainage Report Redlines
View attached comment letter
EPC DPW Stormwaterreview 1Mar 10, 2026
CD Redlines
View attached comment letter
EPC DPW Stormwaterreview 1Mar 10, 2026
Channel Maintenance Agreement Redlines
View attached comment letter
EPC DPW Development Services - Engineeringreview 1Mar 10, 2026
SF263: North Bay at Lake Woodmoor PUD; PUD252 and EA24135 DPW Review 1. Engineering Comments have been provided on the following documents (to be uploaded by Project Manager): V1 - LOI V1 – Final plat Drawings V1 - Drainage Report V1 - Grading & Erosion Control (GEC) Plan V1 - FAE V1 – The completed Road Impact Fee Acknowledgement form V1 - Utility Construction Drawings V1 – Construction Drawings (Plans. Profiles) V1- Channel Maintenance Agreement V1- Subdivision Improvement Agreement; this Agreement is required for Common Improvements (NOT for Public Improvements, no Public Improvements are called for on the plans). Applicant Notes: I am requesting a response letter with your next submittal explaining how each comment was addressed (please copy and paste all comments to your response letter and respond below each comment). Please do not use the words done, fixed, etc. instead explain how you addressed each comment and indicate the sheet number. Please email me at the email address indicated below a request for a TEAM’S RCR “Review Comment Resolution” meeting prior to resubmittal to make sure all comments are addressed, so we can move this project forward to approval. The applicant must upload to EDARP the revised items indicated below with his/her resubmittal: V2 - LOI V2 – Final plat Drawings V2 - Drainage Report V2 - Grading & Erosion Control (GEC) Plan V2 - FAE V2 – The completed Road Impact Fee Acknowledgement form V2 - Utility Construction Drawings V2 – Construction Drawings (Plans. Profiles) V2-Channel Maintenance Agreement V2- Subdivision Improvement Agreement Missing: Submit V3 – PUD Development Plans (See V2 – PUD Development Plans comments dated 2/11/2026 under EDARP number PUD252) Missing: Submit Two Joint access easement are required for driveways accessing lots 1-3 and 4-6. FYI: 1. The ECM Administrator will sign and date the plans, reports, and documents after you make your final submittal (make sure ALL comments are addressed before you make your final submittal and the plans, reports, and documents have no additional comments). 2. Two access permits will be issued. Reviewed by: Jalal Jalal Saleh, PE jalalsaleh@elpasoco.com
EPC DPW Stormwaterreview 1Mar 10, 2026
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document(s): - Channel Maintenance Agreement - Drainage Report - ESQCP - FAE - GEC Checklist - GEC Plan - PCM Applicability Form - PCM Maintenance Agreement - SWMP - SWMP Checklist Please provide the following document(s) upon resubmittal (the planner will need to send an upload request): - PCM O&M Manual Reviewed by: Zachary Jannusch Associate Engineer - Stormwater 719.500.3170 ZacharyJannusch@elpasoco.com
EPC DPW Development Services - Engineeringreview 1Mar 9, 2026
SF263: North Bay at Lake Woodmoor PUD; PUD252 and EA24135 DPW Review 1. Engineering Comments have been provided on the following documents (to be uploaded by Project Manager): V1 - LOI V1 – Final plat Drawings V1 - Drainage Report V1 - Grading & Erosion Control (GEC) Plan V1 - FAE V1 – The completed Road Impact Fee Acknowledgement form V1 - Utility Construction Drawings V1 – Construction Drawings (Plans. Profiles) Applicant Notes: I am requesting a response letter with your next submittal explaining how each comment was addressed (please copy and paste all comments to your response letter and respond below each comment). Please do not use the words done, fixed, etc. instead explain how you addressed each comment and indicate the sheet number. Please email me at the email address indicated below a request for a TEAM’S RCR “Review Comment Resolution” meeting prior to resubmittal to make sure all comments are addressed, so we can move this project forward to approval. The applicant must upload to EDARP the revised items indicated below with his/her resubmittal: V2 - LOI V2 – Final plat Drawings V2 - Drainage Report V2 - Grading & Erosion Control (GEC) Plan V2 - FAE V2 – The completed Road Impact Fee Acknowledgement form V2 - Utility Construction Drawings V2 – Construction Drawings (Plans. Profiles) Missing: Submit V3 – PUD Development Plans (See V2 – PUD Development Plans comments dated 2/11/2026 under EDARP number PUD252) Missing: Submit Two Joint access easement are required for driveways accessing lots 1-3 and 4-6. FYI: 1. The ECM Administrator will sign and date the plans, reports, and documents after you make your final submittal (make sure ALL comments are addressed before you make your final submittal and the plans, reports, and documents have no additional comments). 2. Two access permits will be issued. Reviewed by: Jalal Jalal Saleh, PE jalalsaleh@elpasoco.com
Mountain View Electric Association, Inc.review 1Mar 9, 2026
See attached comment letter
View attached comment letter
Pikes Peak Regional Building Departmentreview 1Mar 6, 2026
Enumerations has the following comments: 1. Enumerations is in agreement with the 911 authority that the drive accesses need to be named private street. Once the names of the private streets are agreed upon, they need to be shown on the plat. 2. Once the street names are agreed upon, submit a copy of the plat to Enumerations for address assignment. When the addressing is returned, the addresses must be added to the plat in the appropriate location. 3. Enumerations will review the mylar prior to recording for addressing, street names, and title block. An Enumerations fee of $10 per lot/tract to which an address has been assigned. 4. No plans for any of these lots can be submitted prior to Enumerations having a copy of the final recorded plat in our records. Brent Johnson Enumerations Plans Examiner Pikes Peak Regional Building Department O: 719-327-2888 E: brent@pprbd.org W: pprbd.org
Woodmoor Water and Sanitation Districtreview 1Mar 5, 2026
Please see the attached documents for all WWSD Comments.
View attached comment letter
Woodmoor Water and Sanitation Districtreview 1Mar 5, 2026
Please see the attached documents for all WWSD Comments.
View attached comment letter
County Attorney - Development Reviewreview 1Mar 5, 2026
See edits to attached Maintenance Agreement. Erika Keech Sr. County Attorney erikakeech2@elpasoco.com
View attached comment letter
County Attorney - Development Reviewreview 1Mar 5, 2026
See edits to attached SIA. Erika Keech Sr. County Attorney erikakeech2@elpasoco.com
View attached comment letter
County Attorney - Waterreview 1Mar 3, 2026
1) On the Water Supply Information Summary and Water Resource Report, please list the water demand in acre-feet, listing out any irrigation uses or stock watering separately. 2) The commitment letter needs to identify the amount of water being committed in acre-feet. See also the letter from the Colorado Division of Water dated February 26, 2026 with the same request. 3) Additionally, pursuant to Sections 8.4.7 (B)(3)(c)(v) and (e) of the Land Development Code the Water Resource Report needs to address more recent information regarding available water supply of Woodmoor Water & Sanitation (provides information from 14 years ago).
EPC Parks Departmentreview 1Mar 3, 2026
See attached documentation for the associated review by Parks staff. Thank you! Ashlyn Mathy Parks Planner Park Planning Division El Paso County Parks Department Office 719.520.6999
View attached comment letter
Tri-Lakes-Monument Fire Protection Districtreview 1Feb 27, 2026
Colorado Wildfire Resiliency Code
View attached comment letter
Tri-Lakes-Monument Fire Protection Districtreview 1Feb 27, 2026
1. Plan is acceptable for firefighting water supply. 2. Plan is acceptable for emergency access. 3. Development will be subject to the Colorado Wildfire Resiliency Code Class 2 requirements if permitted after 6/30/26 (see attached). 4. See Monument Fire Development Guide for addition information.
View attached comment letter
Black Hills Energy-Aquilareview 1Feb 26, 2026
BHE has facilities in area. BHE will Serve. Please call in locates before excavation.
Colorado Division of Water Resourcesreview 1Feb 26, 2026
View attached comment letter
Colorado Division of Water Resourcesreview 1Feb 26, 2026
View attached comment letter
Colorado Division of Water Resourcesreview 1Feb 26, 2026
View attached comment letter
Colorado Division of Water Resourcesreview 1Feb 26, 2026
View attached comment letter
Colorado Division of Water Resourcesreview 1Feb 26, 2026
View attached comment letter
Colorado Division of Water Resourcesreview 1Feb 26, 2026
View attached comment letter
Upper Black Squirrel Creek GWMDreview 1Feb 26, 2026
This is not in the Upper Black Squirrel Creek GWMD
Colorado Springs Planning & Community Developmentreview 1Feb 26, 2026
City Planning has no comment.
Monumentreview 1Feb 26, 2026
No comments of concern from Town of Monument
Colorado Parks and Wildlifereview 1Feb 25, 2026
No Comments
911 Authority - El Paso/Teller Countyreview 1Feb 24, 2026
Comments for E911 as follows: For the purpose of efficient emergency response, the two private access drives for both lots 1-3 and lots 4-6 will require streetnames. Two streetnames were previously approved for this development (Shoreditch Heights and Redbridge Point). You are welcome to use these, or submit other desired names. Streetnaming information (criteria, existing/reserved names) can be found on our website at: https://www.elpasoteller911.org/street-emergency-number-databases Please ensure that the streetnames are depicted on the plan drawings. Thank you Justin
Colorado Geological Surveyreview 1Feb 18, 2026
Colorado Geological Survey (CGS) Review Comment – Resubmittal (Response #6) File Number: SF263 Project: North Bay at Lake Woodmoor Final Plat The January 27, 2026 Letter of Intent states under “Geologic Hazards” that no geologic hazards preclude development of the site and that the 2016 CTL|Thompson Soils and Geologic Hazard Report is being resubmitted with the application. As stated in CGS resubmittal review comments dated December 16, 2025, and reiterated in CGS Response #5 dated February 2, 2026, the 2016 report was prepared for a materially different development configuration (28-unit layout with different grading, building envelopes, and floodplain interface). The current proposal consists of a revised 6-lot configuration with different building footprints, grading, access drives, and open space layout. Because the development configuration has materially changed, the 2016 geologic hazards report is not technically applicable to the current PUD Development Plan and Final Plat. Density reduction alone does not establish geologic hazard adequacy under a revised layout. No updated geologic hazards evaluation addressing the current development configuration has been submitted. An updated geologic hazards evaluation prepared for the current configuration is required to complete CGS review. The updated report must evaluate site-specific geologic hazards under the current design, including groundwater conditions, slope stability, erosion potential, and any retaining structures. Because the required updated geologic hazards evaluation has not been submitted, CGS cannot complete its review and cannot support approval of the current application. CGS review may proceed upon submittal and review of an updated geologic hazards evaluation prepared for the current development configuration. Submitted 2/18/2026 by Jonathan R. Lovekin, Senior Engineering Geologist, Colorado Geological Survey, jlovekin@mines.edu
EPC Environmental Servicesreview 1Feb 18, 2026
View attached comment letter
EPC Environmental Servicesreview 1Feb 18, 2026
View attached comment letter
EPC Environmental Servicesreview 1Feb 18, 2026
View attached comment letter
EPC Environmental Servicesreview 1Feb 18, 2026
View attached comment letter
EPC Environmental Servicesreview 1Feb 18, 2026
View attached comment letter
EPC Environmental Servicesreview 1Feb 18, 2026
View attached comment letter
Colorado Department of Transportation - Pueblo Officereview 1Feb 18, 2026
CDOT has no comments regarding this development.
Road Impact Fee Administratorreview 1Feb 18, 2026
victoriachavez@elpasoco.com Please change the name of the document listed as "Road Impact Fee Credit Agreement." This is actually a "Road Impact Fee Acknowledgement Form." The credit agreement is a different document. Thank you for updating the form name. No further comments at this time.
Colorado Springs Utilities, Dev, Svc.(includes water resources)review 1Feb 17, 2026
This project is well outside of Colorado Springs Utilities territory. We have no comments. Blanche Ludiker 719-668-8111
RBD Floodplainreview 1Feb 17, 2026
show floodplain extents and BFE lines on plat. seal and sign No rise certification form