Petersons Replat

Vacate / replat VR226 No longer in review

Re-plat of two existing lots and one unplatted parcel into three lots

Location
17390 SHILOH PINES DR; 17410 SHILOH PINES DR, 80132
Jurisdiction
El Paso County
Applicant
Shiloh Pines Brian Peterson
Land owners (assessor)
PETERSON BRIAN S & PETERSON TIBBY K; HERSHEY JOHN M & HERSHEY MELISSA M
County project manager
Kylie Bagley
Filed
Jan 5, 2022
Parcels
7100000413, 7116101001, 7116101002
Map
Parcel boundaries: Colorado public parcel data · Basemap © OpenStreetMap contributors
Area map
See all Tri-Lakes projects on the map
Source record
El Paso County EDARP file

Documents (25)

Drainage Report - FinalapprovedMar 10, 2023
Water Resources ReportreviewMar 18, 2025
Final Plat DrawingsreviewDec 12, 2022
Letter of IntentreviewOct 11, 2022
Drainage LetterreviewOct 11, 2022
Fire Protection ReportreviewJun 1, 2022
PBMP Applicability FormreviewApr 24, 2022
Application/Petition FormreviewApr 24, 2022
Subdivision Summary SheetreviewApr 5, 2022
Closures Sheet (Survey)reviewApr 5, 2022
Vicinity/Location MapreviewApr 5, 2022
OWTS ReportreviewFeb 13, 2022
Soils & Geology ReportreviewJan 5, 2022
Fire Commitment LetterreviewJan 5, 2022

Agency review comments (35)

Comments returned by referral agencies during review, from the county's public EDARP file. Some agencies attach a letter instead of (or alongside) written comments.

PCD Project Managerreview 6Apr 2, 2025
No further planning comments. County Attorney Water comments need to be addressed prior to scheduling for hearing.
County Attorney - Waterreview 7Apr 1, 2025
Some, but not all, of the water documentation issues have been addressed. 1. Please provide a single WSIS that summarizes the estimated water demand and water supply for the entire (all 3 lots) subdivision. There are currently 3 WSIS forms attached to the Water Resource Report, all of which only evaluate the new lot. 2. You must select a single proposed water supply for the new lot, whether it be a well in the Dawson aquifer, a well in the Arapahoe aquifer, or service by FVAWD. The requirements for compliance that will be included with our water review vary depending on the source of supply. If in the future the lot owner wishes to change to a different source of supply, they will be required to go through a County process to evaluate that supply. a. For example, if the proposed supply is the Dawson aquifer, then the special warranty deed for water rights must be recorded and an augmentation plan must be approved by the Court prior to this office completing a water review. b. If the proposed supply is FVAWD, then the applicant will be required to comply with conditions 1 and 2 of the commitment letter before the plat is recorded. Compliance with those conditions may foreclose the possibility of drilling a well in the future. 3. If the applicant does not wish to comply with the requirements in #2 above, then they may plat the new lot as a tract, thus preventing development on the lot until the future lot owner comes in to replat it and meet the water supply requirements of the Land Development Code.
County Attorney - Waterreview 6Nov 25, 2024
As previously stated, the water supply for the entire subdivision must be evaluated. 1. Please provide a single WSIS that summarizes the estimated water demand and water supply for the entire subdivision and a single Water Resource Report that addresses the entire subdivision. The WRR must include information regarding the District's total supply and current commitments, pursuant to the Land Development Code. 2. If the new lot is to be served by a well in the Dawson aquifer, then a) the special warranty deed must be recorded, and 2) an augmentation plan must be approved by the court, and 3) water quality info that meets the requirements of the Code must be provided. 3. A commitment letter must be provided on letterhead for any lots to be served by Forest View Acres Water District It must identify the number of lots to be served and the total number of annual acre-feet to be committed.
County Attorney - Waterreview 5May 16, 2023
1. Evidence of a sufficient water supply must be provided for the subdivision as a whole. None of the exceptions listed in Section 8.4.7 (A)(3) of the Land Development Code apply here. Please amend all documentation, including the WSIS, the WSR, and the SEO letter, to address all 3 lots in the subdivision. 2. The Water Resources Report must meet the requirements set forth in the Land Development Code, including preparation by a qualified professional. 3. A commitment to serve must be provided for any lots supplied by a central water provider. 4. For any lots relying on individual wells for water supply, applicant must provide a copy of the signed court decree adjudicating water rights, any deeds conveying sufficient water rights to the property owner, and an approved augmentation plan authorizing withdrawal of a sufficient quantity of water to serve such lots.
PCD Project Managerreview 4May 10, 2023
Planning Department has no comments at this time
Colorado Division of Water Resourcesreview 5May 8, 2023
View attached comment letter
County Attorney - Waterreview 4Apr 20, 2023
County Attorney's Office will review upon receipt of a favorable updated letter from State Engineer's Office.
EPC Health Departmentreview 3Mar 31, 2023
View attached comment letter
PCD Project Managerreview 3Mar 14, 2023
No further planning comments. All outstanding comments need to be addressed
Colorado Division of Water Resourcesreview 4Mar 14, 2023
There does not appear to be an augmentation plan to allow use of a well or, alternatively, a commitment letter and water report from Forest View Acres Water District.
View attached comment letter
PCD Engineering Divisionreview 3Mar 9, 2023
There are no engineering comments relating to drainage or transportation. Reviewed By: Lupe Packman Review Engineer lupepackman@elpasoco.com
County Attorney - Waterreview 3Mar 6, 2023
County Attorney's Office will review upon receipt of an updated letter from the State Engineer's Office.
EPC Parks Departmentreview 3Mar 2, 2023
See Parks comments attached.
View attached comment letter
Colorado Division of Water Resourcesreview 3Nov 22, 2022
View attached comment letter
Colorado Division of Water Resourcesreview 2Nov 15, 2022
The water supply information does not appear to have changed. Please refer to our previous letter dated May 20, 2022 (attached).
View attached comment letter
PCD Project Managerreview 2Nov 9, 2022
Final Plat Redlines
View attached comment letter
PCD Engineering Divisionreview 2Nov 2, 2022
All comments have been resolved. The project manager will upload any approved documents. Reviewed By: Lupe Packman lupepackman@elpasoco.com
County Attorney - Waterreview 2Oct 20, 2022
A letter from the Colorado Division of Water Resources addressing water sufficiency for the third lot is necessary prior to the County Attorney’s Office completing a Water Review. Thank you.
Tri-Lakes-Monument Fire Protection Districtreview 1Jun 3, 2022
No comments.
EPC Stormwater Reviewreview 1May 31, 2022
EPC Stormwater has no comments. Reviewed by: Christina Prete, P.E. Stormwater Engineer III christinaprete@elpasoco.com
PCD Project Managerreview 1May 31, 2022
Final Plat Drawings Redlines
View attached comment letter
PCD Project Managerreview 1May 31, 2022
Mineral Rights Certification Redlines
View attached comment letter
PCD Project Managerreview 1May 31, 2022
Drainage Letter Redlines
View attached comment letter
PCD Project Managerreview 1May 31, 2022
Fire Protection Letter Redlines
View attached comment letter
Pikes Peak Regional Building Departmentreview 1May 27, 2022
1. When submitting the final plat to enumerations for final review of the mylar, please be sure to add the addresses to the three Lots. The address for the new lot, Lot 2 will be 17400 Shiloh Pines Drive. FINAL PLAT COMMENTS APPLY: 1. Enumerations will review the mylar prior to plat for address placement, street names, and title block. 2. A $10.00 per lot and tract platting fee will be due at the time of the review of the mylar, (two addresses per lot and tract). If an address is not needed on a tract then no fee applies. Check should be made out to PIKES PEAK REGIONAL BUILDING DEPARTMENT or PPRBD. Paid directly to the Enumerations Department. An additional over the phone transaction fee of $3.50 will apply for any credit card payment. 3. A copy of the final recorded plat is required prior to plan submittal for RESIDENTIAL. BeckyA@pprbd.org (Please email the Enumerations staff that reviewed your project). Becky Allen Enumerations Plans Examiner Pikes Peak Regional Building Department O: 719-799-2707 W: pprbd.org E: beckya@pprbd.org
Mountain View Electric Association, Inc.review 1May 26, 2022
See attached comments
View attached comment letter
PCD Engineering Divisionreview 1May 26, 2022
Review 1 comments will be uploaded by the project manager. Please address comments on the following documents: -Drainage letter -Final plat drawings Reviewed By: Lupe Packman Review Engineer lupepackman@elpasoco.com
Colorado Geological Surveyreview 1May 26, 2022
With this referral, we received the Final Plat (Hannigan and Associates, Inc., November 4, 2017) and Geotechnical Evaluation Report (American Geoservices (AGS), July 5, 2018). The site does not contain nor is it exposed to any geologic hazards that preclude the proposed re-plat of the 82.66-acre parcel. AGS’s characterization of the geologic hazards associated with the site is valid. CGS, therefore, has no objection to approval of the re-plat as proposed. We offer the following comments: AGS states on page 5, “All proposed structures should be located at least 25 feet from the crest of any slope areas steeper than 2.5H:1V.” Also, “moderate to steep slopes present greater construction difficulties. These areas should not be considered for development or disturbed without a detailed review of site grading plans and house plans by the project geotechnical engineer, and slope stability analysis and foundation design as required…” CGS agrees with AGS’s recommendation that “At the time of construction, AGS should inspect the foundation location and confirm the presence of adequate slope setback.” CGS recommends that AGS or another qualified geotechnical engineer verify that the future foundation locations have an adequate setback from slopes. Submitted 5/26/2022 by Amy Crandall, Engineering Geologist, Colorado Geological Survey (303-384-2632 or acrandall@mines.edu)
Upper Black Squirrel Creek GWMDreview 1May 24, 2022
This application is not located in the Upper Black Squirrel Creek GWMD.
EPC Parks Departmentreview 1May 24, 2022
See Parks comments attached. Greg
View attached comment letter
Colorado Division of Water Resourcesreview 1May 20, 2022
View attached comment letter
911 Authority - El Paso/Teller Countyreview 1May 10, 2022
No new streetnames requested on this submittal. No action for E911. Thank you. Justin
Colorado Parks and Wildlifereview 1May 9, 2022
View attached comment letter
EPC Environmental Servicesreview 1May 6, 2022
View attached comment letter
County Attorney - Waterreview 1May 6, 2022
County Attorney's Office will provide review of water sufficiency following receipt of findings from Colorado Division of Water Resources. Thank you.