Rhetoric Sanitary & Water Plan Update
Update to CDRs Previous subdivision approved under SF2325 with original CDs. Additional sanitary sewer lines being added
- Location
- 7689 STERLING RANCH RD COS, CO 80908
- Jurisdiction
- El Paso County
- Applicant
- All Terrain Engineering Nicholas Jokerst
- Land owner (assessor)
- RHETORIC LLC (state record)
- County project manager
- Edward Schoenheit
- Filed
- Mar 2, 2026
- Parcel
- 5305105001
- Map
-
Parcel boundaries: Colorado public parcel data · Basemap © OpenStreetMap contributors
- Area map
- See all Tri-Lakes projects on the map
- Source record
- El Paso County EDARP file
Documents (9)
Agency review comments (15)
Colorado Springs Utilities, Dev, Svc.(includes water resources)review 3Aug 26, 2026
All CSU comments have been addressed for CDR263
There are no CSU gas infrastructure within the project scope of work.
EPC DPW Development Services - Engineeringreview 3Aug 26, 2026
Engineering Review Ver.3
Pending CSU closeout
No further EPC DPW engineer comments.
Edward Schoenheit, Engineer
E.P.C. Dept. of Public Works
2880 International Circle
Colorado Springs, CO. 80910
Office: 719.520.6813
Cell: 719.502.9659
edwardschoenheit@elpasoco.com
https://publicworks.elpasoco.com/department-public-works/county-engineer/
Black Forest Fire Protection Districtreview 3Aug 21, 2026
Black Forest Fire Rescue Protection District (BFFRPD) has reviewed the submitted utility plans for the Rhetoric Storage Facility.
BFFRPD has no objection to the proposed sanitary sewer improvements. The proposed fire hydrant and water service shall be installed in accordance with the approved Falcon Area Water & Wastewater Authority (FAWWA) plans and applicable BFFRPD fire protection requirements.
The fire hydrant shall be installed, accessible, operational, and capable of providing the required fire flow prior to combustible construction and/or occupancy, as applicable.
Colorado Springs Utilities, Dev, Svc.(includes water resources)review 2Aug 11, 2026
Not addressed.
Ensure horizontal separation is maintained from any gas infrastructure.
Call out and Provide dimension from existing Gas Distribution Main #R19M353 to proposed manhole/wastewater main.
EPC DPW Development Services - Engineeringreview 2Aug 11, 2026
Engineering Review Ver.2
No further engineer comments.
CDs sent for approval and will be uploaded once signed.
Edward Schoenheit, Engineer
E.P.C. Dept. of Public Works
2880 International Circle
Colorado Springs, CO. 80910
Office: 719.520.6813
Cell: 719.502.9659
edwardschoenheit@elpasoco.com
https://publicworks.elpasoco.com/department-public-works/county-engineer/
Colorado Springs Public Worksreview 2Aug 10, 2026
Traffic Engineering has no comments on this item.
Brian Shevock
Public Works/Traffic Engineering
Traffic Engineer II
City of Colorado Springs
brian.shevock@coloradosprings.gov
(719) 385-7620
Colorado Springs Public Worksreview 2Aug 7, 2026
If there are no new public accesses or public improvements are planned to be constructed along Marksheffel, the City will not need to review/approve construction drawings. Removal and replacement of deficient curb, gutter, sidewalk, pedestrian ramps, etc. adjacent to site developing along Marksheffel will still be required, however. Thank you.
Joel Dagnillo, P.E.
Engineer III
Engineering Development Review
City of Colorado Springs
(719)385-5412
Joel.dagnillo@coloradosprings.gov
Black Hills Energy-Aquilareview 1Apr 16, 2026
This project is not in our certificated area. No comment
EPC DPW Stormwaterreview 1Mar 25, 2026
Review 1: EPC DPW Stormwater does not have comments on any of the submitted documents. The limits of disturbance for this proposed utility work is already covered under the active ESQCP that was approved with SF2325, which has the same owner as this utility project. Therefore an ESQCP and all accompanying documents are not required with this utility project. For SW permitting purposes, this utility project is more seen as an add-on to the scope of SF2325. Thanks.
Reviewed by:
Glenn Reese, P.E.
Principal Engineer - Stormwater
719.675.2654
GlennReese@elpasoco.com
PCD Project Managerreview 1Mar 24, 2026
Engineering Review Ver.1
No engineer comments.
FAE and Surety may not be needed pending SW Dept final review comments.
Edward Schoenheit, Engineer
E.P.C. Dept. of Public Works
2880 International Circle
Colorado Springs, CO. 80910
Office: 719.520.6813
Cell: 719.502.9659
edwardschoenheit@elpasoco.com
https://publicworks.elpasoco.com/department-public-works/county-engineer/
EPC DPW Development Services - Engineeringreview 1Mar 24, 2026
Engineering Review Ver.1
No engineer comments.
FAE and Surety may not be needed pending SW Dept final review comments.
Edward Schoenheit, Engineer
E.P.C. Dept. of Public Works
2880 International Circle
Colorado Springs, CO. 80910
Office: 719.520.6813
Cell: 719.502.9659
edwardschoenheit@elpasoco.com
https://publicworks.elpasoco.com/department-public-works/county-engineer/
Colorado Springs Utilities, Dev, Svc.(includes water resources)review 1Mar 16, 2026
Ensure horizontal separation is maintained from any gas infrastructure
Colorado Springs Public Worksreview 1Mar 13, 2026
- All existing curb, gutter, sidewalk and pedestrian ramps along Marksheffel Rd. in poor condition or not meeting City Standard must be removed and replaced prior to Certificate of Occupancy issuance.
- Submit construction plans to the City of Colorado Springs Engineering Development Review and Traffic Engineering for all proposed public accesses to Marksheffel Rd.
Joel Dagnillo, P.E.
Engineer III
Engineering Development Review
City of Colorado Springs
(719)385-5412
Joel.dagnillo@coloradosprings.gov
Colorado Springs Public Worksreview 1Mar 11, 2026
Traffic Engineering has no comments on this item.
Brian Shevock
Public Works/Traffic Engineering
Traffic Engineer II
City of Colorado Springs
brian.shevock@coloradosprings.gov
(719) 385-7620
Mountain View Electric Association, Inc.review 1Mar 11, 2026
MVEA has no objection
Land ownership timeline
- Dec 23, 2024Parcel 5305105001 acquired by RHETORIC LLC (state record) — no sale price recorded, often a non-market transfer such as a deed into a related entity (assessor record)
Timeline
- Sep 8, 2026Submission Triaged
- Aug 27, 2026Submission received from Applicant
- Aug 26, 2026Submission request sent to Applicant
- Aug 26, 2026Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
- Aug 26, 2026Request for Review Comments returned by EPC DPW Development Services - Engineering
- Aug 24, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by LBS Review on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
- Aug 24, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
- Aug 24, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by Zaker Alazzeh on behalf of Colorado Springs Public Works
- Aug 24, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by LaShunda Simpson on behalf of Colorado Springs Public Works
- Aug 24, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by Joel Dagnillo on behalf of Colorado Springs Public Works
- Aug 24, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by Jonathan Scherer on behalf of Colorado Springs Public Works
- Aug 24, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by Hao Vo on behalf of Colorado Springs Public Works
- Aug 24, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by Erin Powers on behalf of Colorado Springs Public Works
- Aug 24, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by General Email on behalf of Colorado Springs Public Works
- Aug 24, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by Brian Shevock on behalf of Colorado Springs Public Works
- Aug 21, 2026Request for Review Comments returned by Black Forest Fire Protection District
- Aug 13, 2026Request for Review Comments returned by FAWWA (Falcon Area Water Wastewater Authority)
- Aug 13, 2026Request for Review Comments returned by Colorado Springs Public Works
- Aug 12, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by Tony Cerrone on behalf of Black Forest Fire Protection District
- Aug 12, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by Rachel Dunn on behalf of Black Forest Fire Protection District
- Aug 12, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by Michael Alvarado on behalf of Black Forest Fire Protection District
- Aug 12, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by on behalf of Black Forest Fire Protection District
- Aug 12, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by Fielding Lucas on behalf of Black Forest Fire Protection District
- Aug 12, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by Cody Poole on behalf of Black Forest Fire Protection District
- Aug 12, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by Chad Herdt on behalf of Black Forest Fire Protection District
- Aug 12, 2026Request for Review Comments sent for Project Rhetoric Sanitary & Water Plan Update for review by Engineering Manager on behalf of EPC DPW Development Services - Engineering
- Aug 11, 2026Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
- Aug 11, 2026Request for Review Comments returned by EPC DPW Development Services - Engineering
- Aug 6, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by Zaker Alazzeh on behalf of Colorado Springs Public Works
- Aug 6, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by LaShunda Simpson on behalf of Colorado Springs Public Works
- Aug 6, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by Jonathan Scherer on behalf of Colorado Springs Public Works
- Aug 6, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by Joel Dagnillo on behalf of Colorado Springs Public Works
- Aug 6, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by Erin Powers on behalf of Colorado Springs Public Works
- Aug 6, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by Hao Vo on behalf of Colorado Springs Public Works
- Aug 6, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by General Email on behalf of Colorado Springs Public Works
- Aug 6, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by Brian Shevock on behalf of Colorado Springs Public Works
- Aug 6, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by Tabitha Barile on behalf of Sterling Ranch Metropolitan District 1-3
- Aug 6, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by Troy Montague on behalf of FAWWA (Falcon Area Water Wastewater Authority)
- Aug 6, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by Ryan Mangina on behalf of FAWWA (Falcon Area Water Wastewater Authority)
- Aug 6, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by Emery Layton > on behalf of FAWWA (Falcon Area Water Wastewater Authority)
- Aug 6, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by Loren Moreland on behalf of FAWWA (Falcon Area Water Wastewater Authority)
- Aug 6, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by Lexi Alexis on behalf of FAWWA (Falcon Area Water Wastewater Authority)
- Aug 6, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by LBS Review on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
- Aug 6, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
- Aug 6, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by Gilbert LaForce on behalf of EPC DPW Development Services - Engineering
- Aug 6, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by Engineering Manager on behalf of EPC DPW Development Services - Engineering
- Aug 6, 2026Submission Triaged
- Aug 4, 2026Submission received from Applicant
- Apr 16, 2026Request for Review Comments returned by Black Hills Energy-Aquila
- Mar 25, 2026Submission request sent to Applicant
- Mar 25, 2026Request for Review Comments returned by EPC DPW Stormwater
- Mar 24, 2026Request for Review Comments returned by PCD Project Manager
- Mar 24, 2026Request for Review Comments returned by EPC DPW Development Services - Engineering
- Mar 24, 2026Request for Review Comments returned by Colorado Springs Public Works
- Mar 16, 2026Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
- Mar 11, 2026Request for Review Comments returned by Mountain View Electric Association, Inc.
- Mar 10, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by Zaker Alazzeh on behalf of Colorado Springs Public Works
- Mar 10, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by LaShunda Simpson on behalf of Colorado Springs Public Works
- Mar 10, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by Jonathan Scherer on behalf of Colorado Springs Public Works
- Mar 10, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by Joel Dagnillo on behalf of Colorado Springs Public Works
- Mar 10, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by Jeff Bailey on behalf of Colorado Springs Public Works
- Mar 10, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by Hao Vo on behalf of Colorado Springs Public Works
- Mar 10, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by Erin Powers on behalf of Colorado Springs Public Works
- Mar 10, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by General Email on behalf of Colorado Springs Public Works
- Mar 10, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by Brian Shevock on behalf of Colorado Springs Public Works
- Mar 10, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by Tabitha Barile on behalf of Sterling Ranch Metropolitan District 1-3
- Mar 10, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by General Email on behalf of Mountain View Electric Association, Inc.
- Mar 10, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by Ryan Mangina on behalf of FAWWA (Falcon Area Water Wastewater Authority)
- Mar 10, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by Loren Moreland on behalf of FAWWA (Falcon Area Water Wastewater Authority)
- Mar 10, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
- Mar 10, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by LBS Review on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
- Mar 10, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by Marcus Henderson on behalf of Black Hills Energy-Aquila
- Mar 10, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by Trish Riber on behalf of Black Hills Energy-Aquila
- Mar 10, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by Bob Swatek on behalf of Black Hills Energy-Aquila
- Mar 10, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by on behalf of EPC Public Works, County Engineer
- Mar 10, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by on behalf of EPC Public Works, County Engineer
- Mar 10, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by Zachary Jannusch on behalf of EPC DPW Stormwater
- Mar 10, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by Mikayla Hartford on behalf of EPC DPW Stormwater
- Mar 10, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by Christina Prete on behalf of EPC DPW Stormwater
- Mar 10, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by Glenn Reese on behalf of EPC DPW Stormwater
- Mar 10, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by Gilbert LaForce on behalf of EPC DPW Development Services - Engineering
- Mar 10, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by Engineering Manager on behalf of EPC DPW Development Services - Engineering
- Mar 10, 2026Request for Review Comments email sent for Project Rhetoric Sanitary & Water Plan Update for review by Justin Kilgore on behalf of PCD Project Manager
- Mar 9, 2026Fees paid: 3/9/2026 (Receipt: 1011776)
- Mar 9, 2026Payment Request sent: 3/9/2026
- Mar 9, 2026Submission Triaged
- Mar 6, 2026Submission received from Applicant
- Mar 3, 2026Submission request sent to Applicant
- Mar 2, 2026File # Assigned: CDR263
- Mar 2, 2026Project Created
- Mar 2, 2026Project Manager Assigned: Edward Schoenheit