Sterling Ranch East Fil. 6 Plat

Final plat SF2610 Active

200 single-family detached lots (137,461 SF), ROW (38,525 SF), open space (18,564 SF) & detention pond (292,931 SF). Minor change in water supply

Jurisdiction
El Paso County
Applicant
Classic Consulting Engineers & Surveyors, LLC Marc Whorton
Land owner (assessor)
CLASSIC SRJ LAND LLC (state record)
County project manager
Kari Parsons
Filed
May 12, 2025
Parcels
5200000553, 5200000573, 5200000586, 5234200001
Map
Parcel boundaries: Colorado public parcel data · Basemap © OpenStreetMap contributors
Area map
See all Tri-Lakes projects on the map
Source record
El Paso County EDARP file

Documents (77)

Deviation RequestreviewNov 2, 2026
Traffic Comment ResponsesreviewNov 2, 2026
Traffic Impact StudyreviewNov 2, 2026
Fire ReportreviewOct 23, 2026
FAE ResponsesreviewOct 23, 2026
CDs ResponsesreviewOct 23, 2026
FDR ResponsesreviewOct 23, 2026
Drainage Report - FinalreviewOct 23, 2026
PCM Applicability FormreviewOct 15, 2026
Final Plat DrawingsreviewOct 15, 2026
Letter of IntentreviewSep 21, 2026
Water Response MemoreviewSep 9, 2026
SRE6 Water ReportreviewSep 9, 2026
Soils & Geology ReportreviewAug 28, 2026
Traffic Impact StudyreviewAug 20, 2026
TIS ResponsesreviewAug 14, 2026
CD ResponsesreviewAug 10, 2026
Final Plat DrawingsreviewAug 5, 2026
Drainage Report - FinalreviewAug 5, 2026
FAE ResponsesreviewJul 31, 2026
Plat ResponsesreviewJul 31, 2026
FDR ResponsesreviewJul 30, 2026
PCM Applicability FormreviewJul 27, 2026
Drainage Report - FinalreviewMay 1, 2026
Closures Sheet (Survey)reviewMar 27, 2026
Final Plat DrawingsreviewMar 27, 2026
Soils & Geology ReportreviewMar 26, 2026
Letter of IntentreviewMar 25, 2026
SRE6 Wastewater ReportreviewMar 23, 2026
SRE6 Water ReportreviewMar 23, 2026
Traffic Impact StudyreviewMar 18, 2026
Application/Petition FormreviewMar 18, 2026
PCM Applicability FormreviewMar 18, 2026
Landscape Plan drawingsreviewMar 5, 2026
Fire Protection ReportreviewMar 5, 2026
Natural Features ReportreviewMar 5, 2026
Approval of change in Water MinoradditionalNov 17, 2026
Unrecorded copy
Selected RangeadditionalMay 26, 2026
Selected Range was 500 feet. TC
Mailing LabelsadditionalMay 26, 2026
Mailing labels for the surrounding property owners that received notices = $13.32 TC
Notice of ApplicationadditionalMay 26, 2026
"Notice of Administrative Decision" letters were mailed by PCD on 05/26/2026. The potential decision can be made after 06/09/2026. TC

Agency review comments (69)

Comments returned by referral agencies during review, from the county's public EDARP file. Some agencies attach a letter instead of (or alongside) written comments.

PCD Project Managerreview 3Nov 16, 2026
Minor Change in water supply less than 4% is out for approval. The document will be recorded after it is signed by the Director.
PCD Project Managerreview 3Nov 16, 2026
Deviation Comments
View attached comment letter
PCD Project Managerreview 3Nov 16, 2026
Construction Drawing review 3 comments
View attached comment letter
EPC DPW Stormwaterreview 3Nov 16, 2026
Review 3: EPC DPW Stormwater comments have been resolved on the following document(s): - CDs - Drainage Report - PCM Applicability Form EPC DPW Stormwater has no further comments. EPC Project Manager: no re-review necessary. Reviewed by: Glenn Reese, P.E. Principal Engineer - Stormwater 719.675.2654 GlennReese@elpasoco.com
PCD Project Managerreview 3Nov 16, 2026
EPC Road Impact Fee should be contacted to enter in the PID. Kristen Ibarra Project Management Specialist El Paso County Department of Public Works 719-330-6396 kristenibarra@elpasoco.com
EPC DPW Development Services - Engineeringreview 3Nov 13, 2026
Review 3: EPC Development Services Engineer comments have been provided on the following documents (to be uploaded by Project Manager): - Construction Drawings - Deviation Request Next Review please provide: - Utility Construction Drawings (Utility section of FAE will be reviewed when Utility plans are submitted) Please provide PID inclusion form. Please provide Development Agreement & SIA for Vollmer, as stated in TIS. Engineering Comments have been resolved on the following documents: - Traffic Report - Plat - Final Drainage Report - FAE Reviewed by: Charlene Durham, PE charlenedurham@elpasoco.com
County Attorney - Development Reviewreview 3Nov 12, 2026
My signature to ROW License Agreement attached. Erika Keech, Sr. County Attorney, erikakeech2@elpasoco.com.
View attached comment letter
County Attorney - Development Reviewreview 3Nov 12, 2026
My signature to Subdivision Improvements Agreement attached. Erika Keech, Sr. County Attorney, erikakeech2@elpasoco.com.
View attached comment letter
County Attorney - Waterreview 2Oct 22, 2026
See the attached Memorandum regarding a minor change.
View attached comment letter
Black Forest Fire Protection Districtreview 2Oct 14, 2026
1. Code basis: Revise the Fire Protection Report to reference BFFR’s adopted 2021 International Fire Code, applicable local amendments, and Colorado Wildfire Resiliency Code. Remove the reference to using City of Colorado Springs Fire Department codes as BFFR’s code basis. 2. Wildfire applicability and plat notes: Revise Sheet 1, General Notes 22 and 23, to state that applicable CWRC requirements are mandatory. Provide the applicable CWRC mapping and fire-intensity classification for the development, identifying any differing classifications across the site. The current statement limiting defensible space to 30 feet and listing only selected hardening measures does not establish full compliance. Coordinate the required structure hardening, defensible space, landscaping, fencing, and common-area vegetation maintenance with BFFR. 3. Conflicting wildfire statements: Revise Fire Protection Report Section 6.3.3.D.1.a. Absence of trees does not establish absence of grassland wildfire exposure or a CWRC exemption. Reconcile this statement with the September 2026 Letter of Intent, page 8. If relying on the June 18, 2025 County correspondence, provide its referenced project list and clarify the scope of that determination separately from applicable BFFR fire-code and CWRC requirements. 4. Fire flow and hydrants: Provide engineered calculations identifying required fire flow, duration, and available flow at a minimum residual pressure of 20 psi under the applicable design-demand conditions. Submit utility drawings showing water-main connections, looping, final hydrant locations, spacing, and coverage measured along approved routes. The report’s general 500-foot hydrant statement and proposed future testing do not independently demonstrate compliance. 5. Fire apparatus access: Provide dimensioned access plans demonstrating compliant clear widths, vertical clearance, grades, turning radii, dead-end lengths, and turnarounds. Verify Minneapolis Court and Rock Springs Court specifically. Document the required separate access routes, their availability during each construction phase, and any proposed exception requiring BFFR approval. Public right-of-way width alone does not establish unobstructed apparatus access. 6. Coordination and acceptance: Reconcile the project description with the submitted 198-lot plat and coordinate final street names and addresses with E911 and Regional Building. Provide a point-by-point response identifying revised sheets and report sections. Required construction access and firefighting water supply must be available at the applicable construction stage; required testing and BFFR acceptance shall not be deferred solely to County financial-assurance release.
PCD Project Managerreview 2Oct 13, 2026
Plat Comments V2
View attached comment letter
PCD Project Managerreview 2Oct 13, 2026
TIS comments V2
View attached comment letter
PCD Project Managerreview 2Oct 13, 2026
FAE Comments version 2
View attached comment letter
EPC DPW Stormwaterreview 2Oct 12, 2026
PCM Applicability Form
View attached comment letter
EPC DPW Stormwaterreview 2Oct 12, 2026
Drainage Report
View attached comment letter
EPC DPW Stormwaterreview 2Oct 12, 2026
CDs
View attached comment letter
EPC DPW Stormwaterreview 2Oct 12, 2026
Review 2: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document(s): - CDs - Drainage Report - PCM Applicability Form EPC DPW Stormwater comments have been resolved on the following document(s): - ESQCP - FAE - GEC Checklist - SWMP - SWMP Checklist Reviewed by: Glenn Reese, P.E. Principal Engineer - Stormwater 719.675.2654 GlennReese@elpasoco.com
EPC DPW Development Services - Engineeringreview 2Oct 9, 2026
Review 2: EPC Development Services Engineer comments have been provided on the following documents (to be uploaded by Project Manager): - Traffic Report - Plat - Construction Drawings - Final Drainage Report - FAE Next Review please provide: - Utility Construction Drawings Please provide PID inclusion form. Please provide Road Fee Credit Agreement, Development Agreement & SIA for Vollmer, as stated in TIS. Reviewed by: Charlene Durham, PE charlenedurham@elpasoco.com
County Attorney - Development Reviewreview 2Oct 8, 2026
See edits to signature block of License Agreement. For future reference, if an agreement is approved administratively, then the Clerk and Recorder does not need to sign it (but it needs a notary). If the Board Chair signs the document, then a notary is not required but the Clerk & Recorder should attest. Prior to finalizing SIA please add collateral/bond amount. I will sign finalized versions of both documents at future submittal. Thanks. Erika Keech, Sr. County Attorney, erikakeech2@elpasoco.com.
View attached comment letter
EPC Health Departmentreview 1Jul 5, 2026
EPCPH Water Sufficiency and Water/Wastewater Service comments
View attached comment letter
Black Hills Energy-Aquilareview 1Jul 1, 2026
BHE will serve. Gas facilities in the area, please call in locates before excavation.
Parks Advisory Boardreview 1Jun 24, 2026
El Paso County Parks Department. Please refer to the attached documentation. These comments and recommendations are being provided administratively, as no parkland or trail easement dedications are necessary, and all Regional or Urban Park Fees are waived pursuant to existing Regional and Urban Park Lands Agreements.
View attached comment letter
EPC Parks Departmentreview 1Jun 24, 2026
El Paso County Parks Department. Please refer to the attached documentation. These comments and recommendations are being provided administratively, as no parkland or trail easement dedications are necessary, and all Regional or Urban Park Fees are waived pursuant to existing Regional and Urban Park Lands Agreements.
View attached comment letter
Black Forest Fire Protection Districtreview 1Jun 21, 2026
Black Forest Fire Rescue has reviewed the submitted Fire Protection Report for Sterling Ranch East Filing No. 6. The proposed municipal water system, looped water mains, public roadway access, and hydrant coverage appear generally consistent with the intent of fire protection access and water supply requirements; however, final approval is contingent upon the applicant providing engineered fire flow documentation demonstrating the required fire flow at a minimum residual pressure of 20 psi, final hydrant locations and spacing, and confirmation that all fire apparatus access roads meet the currently adopted El Paso County/Black Forest Fire Rescue fire code requirements, including width, grade, turning radius, vertical clearance, and hydrant access. The report should be revised to reference the applicable adopted El Paso County/Black Forest Fire Rescue fire code and amendments rather than the City of Colorado Springs Fire Department code basis. Additionally, the wildfire section should be corrected or clarified, as the absence of trees does not eliminate grassland wildfire exposure, and the report itself identifies the site as having high wildfire risk. Black Forest Fire Rescue will require continued coordination through final construction drawings, hydrant placement review, access review, and water system acceptance testing prior to final fire approval.
Falcon School District 49review 1Jun 19, 2026
District 49 is requesting Land dedication for the Sterling Ranch Development; an agreement is in place.
Colorado Parks and Wildlifereview 1Jun 12, 2026
Colorado Parks and Wildlife (CPW) has reviewed the plans for the Sterling Ranch East Fil. 6 Plat in El Paso County. Colorado Parks and Wildlife (CPW) is familiar with the site, and has commented on the overall Sterling Ranch project area in the past. CPW defers to those previous comments. Based on the location and proposed actions, CPW anticipates that this project's impacts on the wildlife resource would be negligible if our previous comments are taken into consideration. We appreciate being allowed to comment. Please feel free to contact District Wildlife Manager, Aaron Berscheid, should you have any questions or require additional information at 719-439-9601 or via email at aaron.berscheid@state.co.us
El Paso County Conservation Distreview 1Jun 11, 2026
The El Paso County Conservation District has reviewed this and we have the following comments: 1) Erosion controls We looked through many of the documents and were unable to find any sort of erosion control plan. Given that this is a neighborhood that will likely have heavy dirt work done initially but then some lots sitting for extended periods, we would like to see the following included in their plans. We would also like to see some of the following landscaping/water wise practices being used in landscapes areas. A) Disturbed areas not being built on immediately after initial site grading should be mulched and revegetated within 45 days of disturbance using plant/grass species native and/or naturalized to El Paso County. This ensures that site erosion from wind and precipitation events will be kept at an absolute minimum. B) Disturbed areas to be revegetated be mulched after seeding with weed-free hay or straw mulch at approximately 5,000 lbs per acre. C) Disturbed areas that are to be landscaped should be done within 45 days of construction being finished. For lawn areas, it is highly encouraged to add 1/2" or thicker layer of quality compost before seeding or sod installation in order to help with water retention so it is more water wise. For other landscaping, we encourage native, drought tolerant trees and shrubs, drought tolerant ornamentals that do not need as much watering, and use of drip irrigation for the most water wise practices. We are content with their plans to use compost in the back fill and 3" mulching around these plants, which are excellent ways to reduce water usage. D) For areas being replanted with natural grass, consider using the El Paso County Conservation District’s Native Shotgun Mix (available at EPCCD.org) for reseeding, which is well suited to soils present on this site and is comprised of 100% native and naturalized grass species. 2) Watershed protection While not on this given area, this is also a drainage to the immediate East of this spot that we would like to ensure is protected during construction. As such, we would like to see the following assurances. A) We would like to see plans that outline their physical erosion control plans during the construction and dirt work phase of this project. This should include all their practices for site perimeter controls like silt fencing, storm drainage protections for road drains, and how they plan to deal with any dirt stockpiles. B) If this is already in the documents, please describe which one it is in since there is no obviously names document that includes these practices. If these measures are added to the project's plan, then the El Paso County Conservation District will be content with the applicant's commitment to soil conservation, watershed protection, and protection of the surrounding community. For any questions, please feel free to contact the EPCCD at 719-600-4706 or Will Vogl - Board VP at Will@EPCCD.org
EPC DPW Stormwaterreview 1Jun 10, 2026
SWMP comments
View attached comment letter
EPC DPW Stormwaterreview 1Jun 10, 2026
SWMP Checklist comments
View attached comment letter
EPC DPW Stormwaterreview 1Jun 10, 2026
PCM form comments
View attached comment letter
EPC DPW Stormwaterreview 1Jun 10, 2026
GEC Checklist comments
View attached comment letter
EPC DPW Stormwaterreview 1Jun 10, 2026
FAE comments
View attached comment letter
EPC DPW Stormwaterreview 1Jun 10, 2026
ESQCP comments
View attached comment letter
EPC DPW Stormwaterreview 1Jun 10, 2026
Drainage report comments
View attached comment letter
EPC DPW Stormwaterreview 1Jun 10, 2026
CD comments
View attached comment letter
EPC DPW Stormwaterreview 1Jun 10, 2026
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document(s): - CDs - Drainage Report - ESQCP - FAE - GEC Checklist - PCM Applicability Form - SWMP - SWMP Checklist Reviewed by: Zachary Jannusch Associate Engineer - Stormwater 719.500.3170 ZacharyJannusch@elpasoco.com
EPC DPW Development Services - Engineeringreview 1Jun 10, 2026
EPC Standard Construction Notes
View attached comment letter
EPC DPW Development Services - Engineeringreview 1Jun 10, 2026
Signing & Striping Construction Notes
View attached comment letter
EPC DPW Development Services - Engineeringreview 1Jun 10, 2026
TIS Redlines
View attached comment letter
EPC DPW Development Services - Engineeringreview 1Jun 10, 2026
Review 1: EPC Development Services Engineer comments have been provided on the following documents: - Traffic Report - Letter of Intent (to be uploaded by project manager) - Plat (to be uploaded by project manager) - Construction Drawings (to be uploaded by stormwater) - Final Drainage Report (to be uploaded by stormwater) - FAE (to be uploaded by stormwater) Next Review please provide: - Utility Construction Drawings Reviewed by: Charlene Durham, PE charlenedurham@elpasoco.com
PCD Project Managerreview 1Jun 9, 2026
Letter of intent comments
View attached comment letter
PCD Project Managerreview 1Jun 9, 2026
Final Plat comments
View attached comment letter
PCD Project Managerreview 1Jun 8, 2026
Water Supply Summary Sheet Comment
View attached comment letter
PCD Project Managerreview 1Jun 8, 2026
Legal Description Comment
View attached comment letter
PCD Project Managerreview 1Jun 8, 2026
Water Commitment Letter comment
View attached comment letter
PCD Project Managerreview 1Jun 8, 2026
Water Report comment
View attached comment letter
PCD Project Managerreview 1Jun 8, 2026
Landscape Plan comment
View attached comment letter
PCD Project Managerreview 1Jun 8, 2026
Water supply is not matching the water finding at Preliminary Plan. Is a change in water supply requested?
PCD Project Managerreview 1Jun 8, 2026
If landscape and noise wall is proposed to be removed from standard FAE, please create a cost estimate based on the approved prelim plan and add it to SIA as exhibit and update total assurance amounts. Please submit the cost estimate fo all the landscape, fencing and noise walls.
County Attorney - Development Reviewreview 1Jun 8, 2026
No comments with respect to Public Right of Way License Agreement. Minor edits to SIA attached. No additional comments from County Attorney - Development Review at this time. Reviewed by: Erika Keech, Senior County Attorney, erikakeech2@elpasoco.com.
View attached comment letter
Colorado Geological Surveyreview 1Jun 8, 2026
View attached comment letter
Colorado Geological Surveyreview 1Jun 8, 2026
View attached comment letter
Colorado Geological Surveyreview 1Jun 8, 2026
View attached comment letter
Colorado Geological Surveyreview 1Jun 8, 2026
View attached comment letter
Colorado Geological Surveyreview 1Jun 8, 2026
View attached comment letter
Pikes Peak Regional Building Departmentreview 1May 27, 2026
1. Can you please email an overall map of the proposed filings on this side of Briargate Pkwy. I would like to see how this filing fits with the others. 2. Enumerations does not have the following street name on the approved list from Justin with E-9-1-1: APPLETON DRIVE. This street name is existing. See Justins comments. 3. Once addresses are received they will need to be placed on the plat. Amy Vanderbeek Enumerations Plans Examiner Pikes Peak Regional Building Department O: 719-327-2930 E: Amy@pprbd.org
PCD Administrative Noticereview 1May 26, 2026
ON 05/26/2026, PCD mailed "Notice of Administrative Determination" letters for SF2610 to surrounding property owners withing a 500 foot range (18 addresses). The potential date an administrative decision can be made on 06/09/2026. Copies of the notice, mailing labels, and selected range have been uploaded to the EDARP file. Cost of postage =$13.32. TC
Upper Black Squirrel Creek GWMDreview 1May 20, 2026
The Upper Black Squirrel Creek GWMD does not having any comments at this time but respectfully reserves the right to comment on future submittals.
EPC Environmental Servicesreview 1May 19, 2026
View attached comment letter
EPC Environmental Servicesreview 1May 19, 2026
View attached comment letter
EPC Environmental Servicesreview 1May 19, 2026
View attached comment letter
EPC Environmental Servicesreview 1May 19, 2026
View attached comment letter
EPC Environmental Servicesreview 1May 19, 2026
View attached comment letter
PCD Project Managerreview 1May 19, 2026
Please add a note identifying which lots are in D49 and D20.
911 Authority - El Paso/Teller Countyreview 1May 19, 2026
Comments for E911 as follows: Appleton Dr – Not available – Existing Minneapolis Ct – Available Vancouver St – Available Great Falls Dr – Available Grand Forks Way – Available Rock Springs Ct – Available Missoula Way – Available Evanston Pl – Available Sioux Falls Way – Available Rapid City Pl – Available Thank you Justin
Academy SD 20 Building Fundreview 1May 19, 2026
Academy School District 20 is in receipt of File #SF2610 for approval of the Sterling Ranch East Fil. 6 Plat. Both of the parcels (5234200001 & 5200000586) included in this request are located in District 49. If you need additional information, please contact me. Don smith Planning Consultant
US Postal Servicereview 1May 18, 2026
Please contact: coloradospringsgrowthmanagement@usps365.onmicrosoft.com directly to review this development for mail service. To establish mail delivery and kiosk locations an appointment will be required with USPS to determine final locations. Information required for this establishment include proposed locations, type of mail receptacle, final plat with addresses, type of development (residential/commercial) and date of first occupancy.
Mountain View Electric Association, Inc.review 1May 18, 2026
See attached comment letter
View attached comment letter
Falcon Fire Protection Districtreview 1May 18, 2026
This project is not within the Falcon Fire Protection District response area. Please contact Black Forest Fire Rescue for this project. Curtis L. Kauffman Fire Prevention Division Lieutenant/Fire Marshal

Timeline