Sterling Ranch East Fil 8 Subdivision
304 single-family detached lots, ROW, detention ponds, lift station. ; PUD Amendment concurrently requested or may be approved by the time of submittal
- Jurisdiction
- El Paso County
- Applicant
- N.E.S. Inc. Andrea Barlow
- Land owner (assessor)
- CLASSIC SRJ LAND LLC
- County project manager
- Kari Parsons
- Filed
- Sep 2, 2025
- Parcel
- 5233000021
- Map
-
Parcel boundaries: Colorado public parcel data · Basemap © OpenStreetMap contributors
- Area map
- See all Tri-Lakes projects on the map
- Source record
- El Paso County EDARP file
Documents (49)
PCM - Notice of Intent to Construct a Non-Juris. Water Impoundment Structure (proof of submittal)reviewDec 8, 2025
Timeline
- Mar 18, 2026Submission request sent to Applicant
- Mar 18, 2026Submission request sent to Applicant
- Feb 19, 2026Request for Review Comments returned by Black Hills Energy-Aquila
- Feb 10, 2026Submission request sent to Applicant
- Feb 10, 2026Request for Review Comments returned by PCD Project Manager
- Feb 10, 2026Request for Review Comments returned by EPC DPW Development Services - Engineering
- Feb 10, 2026Submission request sent to Applicant
- Feb 10, 2026Request for Review Comments returned by EPC DPW Stormwater
- Feb 4, 2026Request for Review Comments returned by County Attorney - Water
- Jan 29, 2026Request for Review Comments returned by County Attorney - Development Review
- Jan 27, 2026Request for Review Comments email sent for Project Sterling Ranch East Fil 8 Subdivision for review by Tabitha Barile on behalf of Sterling Ranch Metropolitan District 1-3
- Jan 27, 2026Request for Review Comments email sent for Project Sterling Ranch East Fil 8 Subdivision for review by Evelyn galanephillips on behalf of Falcon School District 49
- Jan 27, 2026Request for Review Comments email sent for Project Sterling Ranch East Fil 8 Subdivision for review by Trish Riber on behalf of Black Hills Energy-Aquila
- Jan 27, 2026Request for Review Comments email sent for Project Sterling Ranch East Fil 8 Subdivision for review by Marcus Henderson on behalf of Black Hills Energy-Aquila
- Jan 27, 2026Request for Review Comments email sent for Project Sterling Ranch East Fil 8 Subdivision for review by Bob Swatek on behalf of Black Hills Energy-Aquila
- Jan 27, 2026Request for Review Comments email sent for Project Sterling Ranch East Fil 8 Subdivision for review by Adam Magoon on behalf of Black Hills Energy-Aquila
- Jan 27, 2026Request for Review Comments email sent for Project Sterling Ranch East Fil 8 Subdivision for review by Zachary Jannusch on behalf of EPC DPW Stormwater
- Jan 27, 2026Request for Review Comments email sent for Project Sterling Ranch East Fil 8 Subdivision for review by Mikayla Hartford on behalf of EPC DPW Stormwater
- Jan 27, 2026Request for Review Comments email sent for Project Sterling Ranch East Fil 8 Subdivision for review by Glenn Reese on behalf of EPC DPW Stormwater
- Jan 27, 2026Request for Review Comments email sent for Project Sterling Ranch East Fil 8 Subdivision for review by Christina Prete on behalf of EPC DPW Stormwater
- Jan 27, 2026Request for Review Comments email sent for Project Sterling Ranch East Fil 8 Subdivision for review by Gilbert LaForce on behalf of EPC DPW Development Services - Engineering
- Jan 27, 2026Request for Review Comments email sent for Project Sterling Ranch East Fil 8 Subdivision for review by Engineering Manager on behalf of EPC DPW Development Services - Engineering
- Jan 27, 2026Request for Review Comments email sent for Project Sterling Ranch East Fil 8 Subdivision for review by Lori Seago on behalf of County Attorney - Water
- Jan 27, 2026Request for Review Comments email sent for Project Sterling Ranch East Fil 8 Subdivision for review by Erika Keech on behalf of County Attorney - Water
- Jan 27, 2026Request for Review Comments email sent for Project Sterling Ranch East Fil 8 Subdivision for review by April Willie on behalf of County Attorney - Water
- Jan 27, 2026Request for Review Comments email sent for Project Sterling Ranch East Fil 8 Subdivision for review by Lori Seago on behalf of County Attorney - Development Review
- Jan 27, 2026Request for Review Comments email sent for Project Sterling Ranch East Fil 8 Subdivision for review by Erika Keech on behalf of County Attorney - Development Review
- Jan 27, 2026Request for Review Comments email sent for Project Sterling Ranch East Fil 8 Subdivision for review by April Willie on behalf of County Attorney - Development Review
- Jan 27, 2026Request for Review Comments email sent for Project Sterling Ranch East Fil 8 Subdivision for review by Justin Kilgore on behalf of PCD Project Manager
- Jan 27, 2026Submission Triaged
- Jan 27, 2026Submission received from Applicant
- Jan 5, 2026Submission request sent to Applicant
- Jan 5, 2026Request for Review Comments returned by PCD Project Manager
- Jan 5, 2026Request for Review Comments email resent for Project Sterling Ranch East Fil 8 Subdivision for review by Justin Kilgore on behalf of PCD Project Manager
- Dec 22, 2025Request for Review Comments returned by EPC DPW Development Services - Engineering
- Dec 22, 2025Request for Review Comments returned by County Attorney - Development Review
- Dec 22, 2025Request for Review Comments email resent for Project Sterling Ranch East Fil 8 Subdivision for review by Engineering Manager on behalf of EPC DPW Development Services - Engineering
- Dec 22, 2025Request for Review Comments returned by EPC DPW Development Services - Engineering
- Dec 18, 2025Submission request sent to Applicant
- Dec 18, 2025Request for Review Comments returned by PCD Project Manager
- Dec 15, 2025Request for Review Comments returned by EPC DPW Stormwater
- Dec 12, 2025Request for Review Comments returned by Parks Advisory Board
- Dec 12, 2025Request for Review Comments returned by EPC Parks Department
- Dec 11, 2025Request for Review Comments returned by Pikes Peak Regional Building Department
- Dec 10, 2025Request for Review Comments returned by 911 Authority - El Paso/Teller County
- Dec 8, 2025Request for Review Comments email sent for Project Sterling Ranch East Fil 8 Subdivision for review by on behalf of Pikes Peak Regional Building Department
- Dec 8, 2025Request for Review Comments email sent for Project Sterling Ranch East Fil 8 Subdivision for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
- Dec 8, 2025Request for Review Comments email sent for Project Sterling Ranch East Fil 8 Subdivision for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
- Dec 8, 2025Request for Review Comments email sent for Project Sterling Ranch East Fil 8 Subdivision for review by on behalf of Parks Advisory Board
- Dec 8, 2025Request for Review Comments email sent for Project Sterling Ranch East Fil 8 Subdivision for review by on behalf of EPC Parks Department
- Dec 8, 2025Request for Review Comments email sent for Project Sterling Ranch East Fil 8 Subdivision for review by Zachary Jannusch on behalf of EPC DPW Stormwater
- Dec 8, 2025Request for Review Comments email sent for Project Sterling Ranch East Fil 8 Subdivision for review by Mikayla Hartford on behalf of EPC DPW Stormwater
- Dec 8, 2025Request for Review Comments email sent for Project Sterling Ranch East Fil 8 Subdivision for review by Glenn Reese on behalf of EPC DPW Stormwater
- Dec 8, 2025Request for Review Comments email sent for Project Sterling Ranch East Fil 8 Subdivision for review by Christina Prete on behalf of EPC DPW Stormwater
- Dec 8, 2025Request for Review Comments email sent for Project Sterling Ranch East Fil 8 Subdivision for review by Gilbert LaForce on behalf of EPC DPW Development Services - Engineering
- Dec 8, 2025Request for Review Comments email sent for Project Sterling Ranch East Fil 8 Subdivision for review by Engineering Manager on behalf of EPC DPW Development Services - Engineering
- Dec 8, 2025Request for Review Comments email sent for Project Sterling Ranch East Fil 8 Subdivision for review by Lori Seago on behalf of County Attorney - Development Review
- Dec 8, 2025Request for Review Comments email sent for Project Sterling Ranch East Fil 8 Subdivision for review by Erika Keech on behalf of County Attorney - Development Review
- Dec 8, 2025Request for Review Comments email sent for Project Sterling Ranch East Fil 8 Subdivision for review by April Willie on behalf of County Attorney - Development Review
- Dec 8, 2025Request for Review Comments email sent for Project Sterling Ranch East Fil 8 Subdivision for review by Justin Kilgore on behalf of PCD Project Manager
- Dec 8, 2025Request for Review Comments email sent for Project Sterling Ranch East Fil 8 Subdivision for review by Roland Peterson on behalf of EPC Fire and Wildfire Program Manager
- Dec 8, 2025Submission Triaged
- Dec 8, 2025Submission received from Applicant
- Dec 4, 2025Submission request sent to Applicant
- Dec 4, 2025Submission Triaged
- Dec 4, 2025Submission received from Applicant
- Dec 3, 2025Submission request sent to Applicant
- Oct 24, 2025Request for Review Comments returned by Colorado Division of Water Resources
- Oct 17, 2025Request for Review Comments returned by EPC Health Department
- Oct 10, 2025Request for Review Comments returned by Colorado Parks and Wildlife
- Oct 9, 2025Request for Review Comments returned by EPC DPW Stormwater
- Oct 9, 2025Request for Review Comments returned by EPC DPW Development Services - Engineering
- Oct 9, 2025Submission request sent to Applicant
- Oct 9, 2025Request for Review Comments returned by PCD Project Manager
- Oct 8, 2025Request for Review Comments returned by Upper Black Squirrel Creek GWMD
- Oct 7, 2025Request for Review Comments returned by Black Forest Fire Protection District
- Oct 7, 2025Request for Review Comments returned by County Attorney - Water
- Oct 7, 2025Request for Review Comments returned by EPC Fire and Wildfire Program Manager
- Oct 7, 2025Request for Review Comments returned by County Attorney - Development Review
- Oct 7, 2025Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
- Oct 7, 2025Request for Review Comments returned by Colorado Geological Survey
- Oct 7, 2025Request for Review Comments returned by Mountain View Electric Association, Inc.
- Sep 30, 2025Request for Review Comments returned by Road Impact Fee Administrator
- Sep 29, 2025Request for Review Comments returned by EPC Environmental Services
- Sep 29, 2025Request for Review Comments returned by Colorado Springs Planning & Community Development
- Sep 22, 2025Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
- Sep 22, 2025Request for Review Comments returned by 911 Authority - El Paso/Teller County
- Sep 22, 2025Request for Review Comments returned by Academy SD 20 Building Fund
- Sep 19, 2025Request for Review Comments returned by Parks Advisory Board
- Sep 19, 2025Request for Review Comments returned by EPC Parks Department
- Sep 18, 2025Request for Review Comments returned by Pikes Peak Regional Building Department
- Sep 17, 2025Request for Review Comments email sent for Project Foursquare at Sterling Ranch AKA (Sterling Ranch East Fil 8) for review by Tabitha Barile on behalf of Sterling Ranch Metropolitan District 1-3
- Sep 17, 2025Request for Review Comments email sent for Project Foursquare at Sterling Ranch AKA (Sterling Ranch East Fil 8) for review by Evelyn galanephillips on behalf of Falcon School District 49
- Sep 17, 2025Request for Review Comments email sent for Project Foursquare at Sterling Ranch AKA (Sterling Ranch East Fil 8) for review by LBS Review on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
- Sep 17, 2025Request for Review Comments email sent for Project Foursquare at Sterling Ranch AKA (Sterling Ranch East Fil 8) for review by on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
- Sep 17, 2025Request for Review Comments email sent for Project Foursquare at Sterling Ranch AKA (Sterling Ranch East Fil 8) for review by Tamara Baxter on behalf of Colorado Springs Planning & Community Development
- Sep 17, 2025Request for Review Comments email sent for Project Foursquare at Sterling Ranch AKA (Sterling Ranch East Fil 8) for review by Drew Fox on behalf of Colorado Springs Planning & Community Development
- Sep 17, 2025Request for Review Comments email sent for Project Foursquare at Sterling Ranch AKA (Sterling Ranch East Fil 8) for review by Santiago Tijerina on behalf of Black Hills Energy-Aquila
- Sep 17, 2025Request for Review Comments email sent for Project Foursquare at Sterling Ranch AKA (Sterling Ranch East Fil 8) for review by Marcus Henderson on behalf of Black Hills Energy-Aquila
- Sep 17, 2025Request for Review Comments email sent for Project Foursquare at Sterling Ranch AKA (Sterling Ranch East Fil 8) for review by Bob Swatek on behalf of Black Hills Energy-Aquila
- Sep 17, 2025Request for Review Comments email sent for Project Foursquare at Sterling Ranch AKA (Sterling Ranch East Fil 8) for review by Adam Magoon on behalf of Black Hills Energy-Aquila
- Sep 17, 2025Request for Review Comments email sent for Project Foursquare at Sterling Ranch AKA (Sterling Ranch East Fil 8) for review by Rachel Dunn on behalf of Black Forest Fire Protection District
- Sep 17, 2025Request for Review Comments email sent for Project Foursquare at Sterling Ranch AKA (Sterling Ranch East Fil 8) for review by Michael Alvarado on behalf of Black Forest Fire Protection District
- Sep 17, 2025Request for Review Comments email sent for Project Foursquare at Sterling Ranch AKA (Sterling Ranch East Fil 8) for review by on behalf of Black Forest Fire Protection District
- Sep 17, 2025Request for Review Comments email sent for Project Foursquare at Sterling Ranch AKA (Sterling Ranch East Fil 8) for review by Fielding Lucas on behalf of Black Forest Fire Protection District
- Sep 17, 2025Request for Review Comments email sent for Project Foursquare at Sterling Ranch AKA (Sterling Ranch East Fil 8) for review by Chad Herdt on behalf of Black Forest Fire Protection District
- Sep 17, 2025Request for Review Comments email sent for Project Foursquare at Sterling Ranch AKA (Sterling Ranch East Fil 8) for review by Tom Gregory on behalf of Academy SD 20 Building Fund
- Sep 17, 2025Request for Review Comments email sent for Project Foursquare at Sterling Ranch AKA (Sterling Ranch East Fil 8) for review by Donald Smith on behalf of Academy SD 20 Building Fund
- Sep 17, 2025Request for Review Comments email sent for Project Foursquare at Sterling Ranch AKA (Sterling Ranch East Fil 8) for review by Becky Allan on behalf of Academy SD 20 Building Fund
- Sep 17, 2025Request for Review Comments email sent for Project Foursquare at Sterling Ranch AKA (Sterling Ranch East Fil 8) for review by Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
- Sep 17, 2025Request for Review Comments email sent for Project Foursquare at Sterling Ranch AKA (Sterling Ranch East Fil 8) for review by on behalf of Pikes Peak Regional Building Department
- Sep 17, 2025Request for Review Comments email sent for Project Foursquare at Sterling Ranch AKA (Sterling Ranch East Fil 8) for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
- Sep 17, 2025Request for Review Comments email sent for Project Foursquare at Sterling Ranch AKA (Sterling Ranch East Fil 8) for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
- Sep 17, 2025Request for Review Comments email sent for Project Foursquare at Sterling Ranch AKA (Sterling Ranch East Fil 8) for review by Travis Sauder on behalf of Colorado Parks and Wildlife
- Sep 17, 2025Request for Review Comments email sent for Project Foursquare at Sterling Ranch AKA (Sterling Ranch East Fil 8) for review by Tim Kroening on behalf of Colorado Parks and Wildlife
- Sep 17, 2025Request for Review Comments email sent for Project Foursquare at Sterling Ranch AKA (Sterling Ranch East Fil 8) for review by Peter Chapman on behalf of Colorado Parks and Wildlife
- Sep 17, 2025Request for Review Comments email sent for Project Foursquare at Sterling Ranch AKA (Sterling Ranch East Fil 8) for review by Karen Voltura on behalf of Colorado Parks and Wildlife
- Sep 17, 2025Request for Review Comments email sent for Project Foursquare at Sterling Ranch AKA (Sterling Ranch East Fil 8) for review by Carolyn Craveiro de Sa on behalf of Colorado Parks and Wildlife
- Sep 17, 2025Request for Review Comments email sent for Project Foursquare at Sterling Ranch AKA (Sterling Ranch East Fil 8) for review by Colorado Geological Survey on behalf of Colorado Geological Survey
- Sep 17, 2025Request for Review Comments email sent for Project Foursquare at Sterling Ranch AKA (Sterling Ranch East Fil 8) for review by Javier Vargas-Johnson on behalf of Colorado Division of Water Resources
- Sep 17, 2025Request for Review Comments email sent for Project Foursquare at Sterling Ranch AKA (Sterling Ranch East Fil 8) for review by Ailis Thyne on behalf of Colorado Division of Water Resources
- Sep 17, 2025Request for Review Comments email sent for Project Foursquare at Sterling Ranch AKA (Sterling Ranch East Fil 8) for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
- Sep 17, 2025Request for Review Comments email sent for Project Foursquare at Sterling Ranch AKA (Sterling Ranch East Fil 8) for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
- Sep 17, 2025Request for Review Comments email sent for Project Foursquare at Sterling Ranch AKA (Sterling Ranch East Fil 8) for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
- Sep 17, 2025Request for Review Comments email sent for Project Foursquare at Sterling Ranch AKA (Sterling Ranch East Fil 8) for review by General Email on behalf of Mountain View Electric Association, Inc.
- Sep 17, 2025Request for Review Comments email sent for Project Foursquare at Sterling Ranch AKA (Sterling Ranch East Fil 8) for review by Victoria Chavez on behalf of Road Impact Fee Administrator
- Sep 17, 2025Request for Review Comments email sent for Project Foursquare at Sterling Ranch AKA (Sterling Ranch East Fil 8) for review by on behalf of Parks Advisory Board
- Sep 17, 2025Request for Review Comments email sent for Project Foursquare at Sterling Ranch AKA (Sterling Ranch East Fil 8) for review by on behalf of EPC Parks Department
- Sep 17, 2025Request for Review Comments email sent for Project Foursquare at Sterling Ranch AKA (Sterling Ranch East Fil 8) for review by Mike McCarthy on behalf of EPC Health Department
- Sep 17, 2025Request for Review Comments email sent for Project Foursquare at Sterling Ranch AKA (Sterling Ranch East Fil 8) for review by Catherine McGarvy on behalf of EPC Health Department
- Sep 17, 2025Request for Review Comments email sent for Project Foursquare at Sterling Ranch AKA (Sterling Ranch East Fil 8) for review by HEAEH LandUse on behalf of EPC Health Department
- Sep 17, 2025Request for Review Comments email sent for Project Foursquare at Sterling Ranch AKA (Sterling Ranch East Fil 8) for review by Kathy Andrew on behalf of EPC Environmental Services
- Sep 17, 2025Request for Review Comments email sent for Project Foursquare at Sterling Ranch AKA (Sterling Ranch East Fil 8) for review by Zachary Jannusch on behalf of EPC DPW Stormwater
- Sep 17, 2025Request for Review Comments email sent for Project Foursquare at Sterling Ranch AKA (Sterling Ranch East Fil 8) for review by Mikayla Hartford on behalf of EPC DPW Stormwater
- Sep 17, 2025Request for Review Comments email sent for Project Foursquare at Sterling Ranch AKA (Sterling Ranch East Fil 8) for review by Glenn Reese on behalf of EPC DPW Stormwater
- Sep 17, 2025Request for Review Comments email sent for Project Foursquare at Sterling Ranch AKA (Sterling Ranch East Fil 8) for review by Christina Prete on behalf of EPC DPW Stormwater
- Sep 17, 2025Request for Review Comments email sent for Project Foursquare at Sterling Ranch AKA (Sterling Ranch East Fil 8) for review by Gilbert LaForce on behalf of EPC DPW Development Services - Engineering
- Sep 17, 2025Request for Review Comments email sent for Project Foursquare at Sterling Ranch AKA (Sterling Ranch East Fil 8) for review by Engineering Manager on behalf of EPC DPW Development Services - Engineering
- Sep 17, 2025Request for Review Comments email sent for Project Foursquare at Sterling Ranch AKA (Sterling Ranch East Fil 8) for review by Lori Seago on behalf of County Attorney - Water
- Sep 17, 2025Request for Review Comments email sent for Project Foursquare at Sterling Ranch AKA (Sterling Ranch East Fil 8) for review by Erika Keech on behalf of County Attorney - Water
- Sep 17, 2025Request for Review Comments email sent for Project Foursquare at Sterling Ranch AKA (Sterling Ranch East Fil 8) for review by April Willie on behalf of County Attorney - Water
- Sep 17, 2025Request for Review Comments email sent for Project Foursquare at Sterling Ranch AKA (Sterling Ranch East Fil 8) for review by Lori Seago on behalf of County Attorney - Development Review
- Sep 17, 2025Request for Review Comments email sent for Project Foursquare at Sterling Ranch AKA (Sterling Ranch East Fil 8) for review by Erika Keech on behalf of County Attorney - Development Review
- Sep 17, 2025Request for Review Comments email sent for Project Foursquare at Sterling Ranch AKA (Sterling Ranch East Fil 8) for review by April Willie on behalf of County Attorney - Development Review
- Sep 17, 2025Request for Review Comments email sent for Project Foursquare at Sterling Ranch AKA (Sterling Ranch East Fil 8) for review by Justin Kilgore on behalf of PCD Project Manager
- Sep 17, 2025Request for Review Comments email sent for Project Foursquare at Sterling Ranch AKA (Sterling Ranch East Fil 8) for review by Roland Peterson on behalf of EPC Fire and Wildfire Program Manager
- Sep 17, 2025Project Manager Assigned: Kari Parsons
- Sep 17, 2025Fees paid: 9/17/2025 (Receipt: 1011067)
- Sep 12, 2025Project Manager Assigned: Kylie Bagley
- Sep 12, 2025File # Assigned: SF2526
- Sep 12, 2025Payment Request sent: 9/12/2025
- Sep 12, 2025Submission Triaged
- Sep 12, 2025Submission received from Applicant
- Sep 9, 2025Submission request sent to Applicant
- Sep 9, 2025Submission request sent to Applicant
- Sep 2, 2025Submission request sent to Applicant
- Sep 2, 2025Submission request sent to Applicant
- Sep 2, 2025Project Created
- Sep 2, 2025EA Assigned: EA21117
- Sep 2, 2025Project Manager Assigned: Kari Parsons