Sundance West Final Plat
Creating 7 lots from Lot 1 of Thal Subdivision.
- Location
- 5525 HODGEN RD, 80908
- Jurisdiction
- El Paso County
- Applicant
- Vertex Consulting Services Nina Ruiz
- Land owner (assessor)
- DUNSTON MATTHEW W & DUNSTON GENE W JR
- County project manager
- Lacey Dean
- Filed
- Jan 22, 2025
- Parcel
- 6125001003
- Map
-
Parcel boundaries: Colorado public parcel data · Basemap © OpenStreetMap contributors
- Area map
- See all Tri-Lakes projects on the map
- Source record
- El Paso County EDARP file
Documents (55)
Agency review comments (92)
Black Forest Fire Protection Districtreview 2Nov 10, 2026
The following items remain to be resolved before final fire approval:
1. Substantiate the proposed alternative water supply — IFC Section 507
The Fire Protection Plan identifies off-site Cherokee/Sundance hydrants and proposes tender-shuttle operations in place of a subdivision cistern. BFFR acknowledges the source information provided. However, as stated in BFFR’s September 28, 2026 review of the concurrent rezone, this alternative has not been approved.
Provide current water-provider confirmation of authorized use, hydrant flow-test information including residual pressure, available storage and supply duration, year-round reliability, and apparatus access to the proposed fill locations. Supplement the plan with an analysis demonstrating that the proposed arrangement can sustain the required firefighting water delivery for this development.
Show actual apparatus travel routes and distances, anticipated building envelopes and apparatus operating locations, and applicable hose routes. Distances to the subdivision boundary alone do not establish service to each lot.
If the proposed alternative cannot be demonstrated and approved, provide a compliant subdivision water-supply design. Any proposed cistern shall meet BFFR’s minimum 30,000-gallon usable capacity requirement, or a greater volume where required by the applicable calculation. Address the prior request for qualified Colorado-licensed fire protection engineering review of the water-supply design.
2. Complete the fire apparatus access design — IFC Section 503
Sheet TY1 provides a 20-foot private-driveway typical section; this information need not be resubmitted as a new concept. Complete the supporting design and reconcile the gravel driveway shown on C1.1 with TY1’s pavement terminology and deferred geotechnical design.
Provide construction drawings for the required Farrar Road improvements and coordinated private access. The current Construction Drawings upload duplicates the grading and erosion-control set. Coordinate with County Engineering’s November 9 comments.
Document all-weather apparatus loading, culvert crossing capacity, longitudinal grades, vertical clearance, turning geometry, and apparatus operating areas. Provide dimensioned turnarounds for dead-end fire apparatus access exceeding 150 feet in accordance with IFC 503.2.5, with the necessary easements. Coordinate the County-required Farrar Road termination/turnaround with the private-access layout.
3. Reconcile lot access, easements, and maintenance
Resolve the conflicting Lot 5 access descriptions. Plat note 13 and the traffic memo close the existing Hodgen Road access, while the Letter of Intent and drainage report retain it. Show the permanent replacement route serving the existing residence and coordinate addressing with PPRBD.
Reconcile the 24-foot access easements shown on the plat with the 30-foot easement described in the Letter of Intent and applicable County requirements. Clearly identify the lots served by each route, including Lot 6’s connection.
Provide recorded access and maintenance agreements, or proposed instruments for review, consistent with the plat. Include responsibility for the shared driving surface, culverts, snow removal, vegetation clearance, and turnarounds. Show the approved name “Sundance Ridge View” consistently.
4. Carry forward CWRC requirements
Add an explicit plat note addressing the applicable Colorado Wildfire Resiliency Code requirements. Carry forward the Moderate Fire Intensity/Class 2 requirements identified in BFFR’s concurrent rezone review, subject to any approved classification determination.
Future applicable construction shall comply with CWRC Chapter 4 structure-hardening and Chapter 5 site and defensible-space requirements. Individual homes require the applicable BFFR documentation, review, and initial planning and final inspections. Detailed building-material approvals will occur through the individual permit process.
5. Correct the reviewing fire district
Revise civil sheet C1.0 to identify Black Forest Fire Rescue Protection District instead of Monument Fire District.
Provide a coordinated response referencing the revised document pages and drawing sheets. Final plat review does not constitute approval of the proposed off-site water alternative or any access exception.
PCD Engineering Divisionreview 2Nov 9, 2026
Review 2.
Engineering and Stormwater comments on the following documents (to be uploaded by Project Manager):
- Drainage Report
- Closure Sheets
- Final Plat
- Letter of Intent
- Construction Drawings
- FAE
- GEC Plan
- Soils and Geology Report
Additional required documents:
- Proof of submittal of a non-jurisdictional impoundment form
- DMA
- O&M Agreement
- SDI worksheet
Reviewed by:
Charlene Durham, PE, Principal Engineer
charlenedurham@elpasoco.com
(719) 520-7951
Joe Sandstrom, EI, Associate Engineer
josephsandstrom@elpasoco.com
(719) 520-6314
PCD Engineering Divisionreview 2Nov 9, 2026
Construction Drawings comments
PCD Engineering Divisionreview 2Nov 9, 2026
Soils and Geology Report comments
EPC Stormwater Reviewreview 2Nov 9, 2026
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- Drainage Report......................(to be uploaded by Development Services)
- ESQCP
- FAE.........................................(to be uploaded by Development Services)
- Final Plat.................................(to be uploaded by Development Services)
- GEC Plan...............................(to be uploaded by Development Services)
- GEC Checklist
- PCM Applicability Form
- SWMP
- SWMP Checklist
Reviewed by:
Mikayla Hartford, P.E.
Engineer - Stormwater
719.339.5053
MikaylaHartford@elpasoco.com
PCD Project Managerreview 2Nov 5, 2026
V2_Water Resources Report_comments
PCD Project Managerreview 2Nov 5, 2026
V2_Water Supply Information Summary_comments
PCD Project Managerreview 2Nov 5, 2026
V2_Wastewater Treatment Report_INFORMATIONAL comments
PCD Project Managerreview 2Nov 5, 2026
V2_Natural Features Report_comments
PCD Project Managerreview 2Nov 5, 2026
V2_Mineral Rights Certification_comments
PCD Project Managerreview 2Nov 5, 2026
V2_Fire Protection Report_INFORMATIONAL comments
PCD Project Managerreview 2Nov 5, 2026
Review 2: EPC Planning Division has comments in green text boxes on the following documents.
- Letter of Intent (to be uploaded by Engineering staff)
- Final Plat Drawings (to be uploaded by Engineering staff)
- Soils and Geology (to be uploaded by Engineering staff)
- Water Resources Report
- Water Supply Information Summary
- Natural Features Report
- Mineral Rights Certification
- Fire Protection Report (INFORMATION comments only)
- Wastewater Treatment Report (INFORMATIONAL comments only)
Reviewed by:
Lacey Dean, Planner
laceydean2@elpasoco.com
County Attorney - Waterreview 2Nov 5, 2026
-Pursuant to the El Paso County Land Development Code (LDC) 8.4.7(B)(3)(d), please include water quality information in the Water Resources Report (WRR).
-Please also double-check your estimated demand for irrigation in the Water Supply Information Summary (WSIS). 7 acres is 304,920 square feet. At 0.0566 acre-foot/1,000 square feet, which is the presumptive use value in the LDC, 17.26 annual acre-feet would be required to meet this demand.
-Please reconcile the stock watering demand between the WSIS and the WRR.
-Please complete section 10 of the WSIS to add the water court case number.
Black Hills Energy-Aquilareview 2Nov 4, 2026
BHE will serve. BHE has facilities in area. Please call in locates before excavating.
Pikes Peak Regional Building Departmentreview 2Nov 3, 2026
Enumerations has the following comments:
1. On the letter of intent, replat criteria #5 says that lot 5 will have access to Hodgen via existing access easement, but, plat note 13 states that there will be no access to Hodgen and that the current access will be closed. Which is correct? If the existing address to Hodgen on what will be Lot 5 is to be closed, how will that lot be accessed? If the access to lot 5 will change from what is currently is, than an address change for the existing home will need to be done.
2. Per comments from the 911 authority regarding an existing street name for the access of lots 4, 6 & 7 of Sundance Ridge View , this street name needs to be shown on the plat. Further, Enumerations would want Lot 3 to also be accessed and addressed from this street.
3. Enumerations comments regarding mylar review prior to plat approval still apply.
Brent Johnson
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2888 E: brent@pprbd.org W: pprbd.org
Black Forest Land Use Committeereview 2Nov 2, 2026
The main comment from the Black Forest Land Use Committee is the issue of re-platting parcels that have already been platted. When a person buys a parcel that has been platted, there is normally the assumption that the lots will stay the same as originally platted. Is the owner of Sundance East OK with this further subdivision? I believe that a developer should be required to stick with the density of a lot when they purchase it. This is a protection for other owners of adjoining lots. This issue is becoming more significant in Black Forest where owners of 5-acre lots are looking to subdivide into 2.5-acre lots. Again this is not fair to the adjoining residents who bought into the development with the understand that the lots would be 5 acres, thus providing lower density and more privacy.
EPC Sheriff's Departmentreview 2Oct 30, 2026
As the agency having jurisdiction is Black Forest Fire Rescue Protection District, EPSO defers all fire comments to BFFR
EPC Parks Departmentreview 2Oct 21, 2026
El Paso County Parks staff have reviewed the second submittal of this final plat and have attached comments and recommendations.
Thank you.
Ashlyn Mathy
Parks Planner
Park Planning Division
El Paso County Parks Department
Office 719.520.6978
Mountain View Electric Association, Inc.review 2Oct 15, 2026
See comment letter dated 10/7/25
911 Authority - El Paso/Teller Countyreview 2Oct 15, 2026
Comments for E911 as follows:
The access easement leading to lots 6 and 7 has a previously approved streetname “Sundance Ridge View”.
This name needs to be depicted on the plan drawings.
Thank you.
Justin
PCD Project Managerreview 1Nov 4, 2025
See comments on Fire Protection Report.
El Paso County Conservation Distreview 1Oct 30, 2025
No comments at this time.
PCD Project Managerreview 1Oct 23, 2025
See comments on Mineral Rights Certificate.
PCD Project Managerreview 1Oct 23, 2025
See comments on Letter of Intent.
PCD Project Managerreview 1Oct 23, 2025
See comments on the Final Plat Drawings.
PCD Project Managerreview 1Oct 23, 2025
Please see comments on the Application.
PCD Project Managerreview 1Oct 23, 2025
The Waste Water Treatment Report submitted was a protected document. Please submit V2 unprotected so comments can be made.
Black Forest Land Use Committeereview 1Oct 20, 2025
The Black Forest Land Use Committee has no comments on this proposal.
Pikes Peak Regional Building Departmentreview 1Oct 10, 2025
Enumerations has the following comments:
1. Note 3 shows the FIRM panel as 08041C035G. It should be 08041C305G.
2. The existing residence will retain the existing address for Lot 5.
3. The access easement for lots 3,4, 6 and 7 should be a named private street. Submit a list of proposed street names to Justin Annan (jannan@eptc911.org) and Glenn West (gwest@eptc911.org) for approval. Once a street name is approved, it needs to be added to this plat.
4. Once the private street name is approved, the applicant should submit a copy of this plat to Enumerations for address assignment. Once addressing is returned, the addresses need to be added to this plat.
5. Enumerations will review the mylar prior to recording for addressing, title block and street names. An Enumerations fee of $10 will be due for each lot to which a new address is assigned.
Brent Johnson
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2888 E: brent@pprbd.org W: pprbd.org
PCD Engineering Divisionreview 1Oct 9, 2025
Review 1.
Engineering and Stormwater comments on the following documents uploaded today:
- Drainage Report
- Closure Sheets
Engineering comments on the following documents (to be uploaded by the project manager on a later date):
- Final Plat
- Letter of Intent
- Soils and Geology Report
- Traffic Memo
Additional documents required with the next submittal:
- Construction Drawings
- FAE
Note to Project Manager: Please provide full review period for the next submittal due to the nature and volume of comments on this submittal and the engineering documents that were omitted from the first submittal.
Reviewed by:
Charlene Durham, PE, Principal Engineer
charlenedurham@elpasoco.com
(719) 520-7951
Joe Sandstrom, EI, Associate Engineer
josephsandstrom@elpasoco.com
(719) 520-6314
EPC Stormwater Reviewreview 1Oct 9, 2025
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- Drainage Report......................(to be uploaded with Development Services comments)
- Final Plat.................................(to be uploaded by the Project Manager)
- PCM Applicability Form
This project site has over an acre of existing disturbance. Please provide the following documents upon resubmittal:
- ESQCP
- FAE
- GEC Plan
- GEC Checklist
- SWMP
- SWMP Checklist
Reviewed by:
Mikayla Hartford, P.E.
Engineer - Stormwater
719.339.5053
MikaylaHartford@elpasoco.com
EPC Fire and Wildfire Program Managerreview 1Oct 9, 2025
Fire Safety and Wildfire Mitigation Program comments added to the following documents:
- Fire Protection report
- Fina Plat Drawings
Roland Peterson
Fire Safety and Wildfire Mitigation Program Manager
Planning & Community Development
719.520.6075
rolandpeterson@elpasoco.com
Black Forest Fire Protection Districtreview 1Oct 7, 2025
BFFRPD (Black Forest Fire Rescue Protection District) has reviewed the proposed project. Of concerns for BFFRPD operations are the fire department access and fire protection water supplies. El Paso County is the Authority Having Jurisdiction (AHJ) that will determine the requirements for cistern and specifications for access/egress. Per BFFRPD, Fire Protection Cisterns or natural water supplies shall be provided in: subdivisions of 5 or more lots and commercial/industrial developments where there is insufficient public and/or private water supply to meet minimum fire flows required by NFPA 1141, 1142 and reference standards of those publications. The applicant states that there are multiple "hydrants" available, which is not true. The "hydrant" labeled on Haes Haven is a fire cistern and was constructed for the Providence Point Estates subdivision, while the second hydrant is in a field with no access to serve the proposed lots. The Fire Protection report states that specific hydrant is 1,900 feet away which is not the distance by roadway (driving). The hydrant is in a field which is inaccessible by fire apparatus. If the applicant would like to communicate with that responsible water district (Cherokee Metropolitan District) to inquire about serving the proposed subdivision, BFFRPD would like be a part of that planning. Having the water district serve the proposed lots by a municipal water system would be beneficial for both the applicant and the future citizens that would occupy those lots.
Additionally, all structures and street signs need to comply with PPRBD, EL Paso County standards, IBC 2021 and IFC 2021 standards. Our recommendation is the applicant demonstrate full compliance and conformance with El Paso County’s adopted Land Development Code (LDC), Engineering Criteria Manual (ECM), adopted International Fire Code (IFC), and all other adopted codes, provisions, or statutes that impact fire safety to include access/egress, water supply, hardening of structures, addressing, fire protection systems, etc.
It is recommended that the applicant submit a comprehensive fire protection report from a qualified fire protection engineer that is licensed as a Professional Engineer (PE) by the Colorado State Board of Registration for Professional Engineers to demonstrate conformance to all requirements. The current Fire Protection report is not completed by a PE-licensed individual.
Furthermore, the District does not support any waivers or variances that negatively impact any fire safety provisions including access/egress, water supply, hardening of structures, addressing, fire protections systems, etc.
Mountain View Electric Association, Inc.review 1Oct 7, 2025
See attached comment letter
911 Authority - El Paso/Teller Countyreview 1Sep 26, 2025
No action for E911 on this submittal.
Thank you.
Justin
EPC Parks Departmentreview 1Sep 23, 2025
El Paso County Parks Staff Preliminary Comments:
Please See Attached Documentation. This project will be presented before the Parks Advisory Board on October 8, 2025.
Thank you!
Ashlyn Mathy
Parks Planner
Park Planning Division
El Paso County Parks Department
ashlynmathy@elpasoco.com
Timeline
- Nov 16, 2026Request for Review Comments returned by Colorado Division of Water Resources
- Nov 10, 2026Request for Review Comments returned by Black Forest Fire Protection District
- Nov 9, 2026Submission request sent to Applicant
- Nov 9, 2026Request for Review Comments returned by PCD Engineering Division
- Nov 9, 2026Request for Review Comments returned by EPC Stormwater Review
- Nov 5, 2026Request for Review Comments returned by PCD Project Manager
- Nov 5, 2026Request for Review Comments email resent for Project Sundance West Final Plat for review by Engineering Manager on behalf of PCD Engineering Division
- Nov 5, 2026Request for Review Comments returned by County Attorney - Water
- Nov 4, 2026Request for Review Comments returned by PCD Engineering Division
- Nov 4, 2026Request for Review Comments returned by Black Hills Energy-Aquila
- Nov 3, 2026Request for Review Comments returned by Colorado Geological Survey
- Nov 3, 2026Request for Review Comments email resent for Project Sundance West Final Plat for review by Ailis Thyne on behalf of Colorado Division of Water Resources
- Nov 3, 2026Request for Review Comments returned by Pikes Peak Regional Building Department
- Nov 2, 2026Request for Review Comments returned by Black Forest Land Use Committee
- Nov 2, 2026Request for Review Comments returned by Colorado Division of Water Resources
- Oct 30, 2026Request for Review Comments returned by EPC Sheriff's Department
- Oct 21, 2026Request for Review Comments returned by EPC Parks Department
- Oct 20, 2026Project Manager Assigned: Lacey Dean
- Oct 15, 2026Request for Review Comments returned by Mountain View Electric Association, Inc.
- Oct 15, 2026Request for Review Comments returned by EPC Environmental Services
- Oct 15, 2026Request for Review Comments returned by 911 Authority - El Paso/Teller County
- Oct 14, 2026Request for Review Comments email sent for Project Sundance West Final Plat for review by Vicki Wood on behalf of Lewis Palmer 38
- Oct 14, 2026Request for Review Comments email sent for Project Sundance West Final Plat for review by Brett Ridgway on behalf of Lewis Palmer 38
- Oct 14, 2026Request for Review Comments email sent for Project Sundance West Final Plat for review by Melissa Andrews on behalf of Lewis Palmer 38
- Oct 14, 2026Request for Review Comments email sent for Project Sundance West Final Plat for review by William Vogl on behalf of El Paso County Conservation Dist
- Oct 14, 2026Request for Review Comments email sent for Project Sundance West Final Plat for review by Harry Thomas on behalf of El Paso County Conservation Dist
- Oct 14, 2026Request for Review Comments email sent for Project Sundance West Final Plat for review by Katie Miller on behalf of El Paso County Conservation Dist
- Oct 14, 2026Request for Review Comments email sent for Project Sundance West Final Plat for review by on behalf of El Paso County Conservation Dist
- Oct 14, 2026Request for Review Comments email sent for Project Sundance West Final Plat for review by Mariah Hudson on behalf of El Paso County Conservation Dist
- Oct 14, 2026Request for Review Comments email sent for Project Sundance West Final Plat for review by Trish Riber on behalf of Black Hills Energy-Aquila
- Oct 14, 2026Request for Review Comments email sent for Project Sundance West Final Plat for review by Marcus Henderson on behalf of Black Hills Energy-Aquila
- Oct 14, 2026Request for Review Comments email sent for Project Sundance West Final Plat for review by Bob Swatek on behalf of Black Hills Energy-Aquila
- Oct 14, 2026Request for Review Comments email sent for Project Sundance West Final Plat for review by Terry Stokka on behalf of Black Forest Land Use Committee
- Oct 14, 2026Request for Review Comments email sent for Project Sundance West Final Plat for review by Tony Cerrone on behalf of Black Forest Fire Protection District
- Oct 14, 2026Request for Review Comments email sent for Project Sundance West Final Plat for review by Rachel Dunn on behalf of Black Forest Fire Protection District
- Oct 14, 2026Request for Review Comments email sent for Project Sundance West Final Plat for review by on behalf of Black Forest Fire Protection District
- Oct 14, 2026Request for Review Comments email sent for Project Sundance West Final Plat for review by Michael Alvarado on behalf of Black Forest Fire Protection District
- Oct 14, 2026Request for Review Comments email sent for Project Sundance West Final Plat for review by Fielding Lucas on behalf of Black Forest Fire Protection District
- Oct 14, 2026Request for Review Comments email sent for Project Sundance West Final Plat for review by Cody Poole on behalf of Black Forest Fire Protection District
- Oct 14, 2026Request for Review Comments email sent for Project Sundance West Final Plat for review by Chad Herdt on behalf of Black Forest Fire Protection District
- Oct 14, 2026Request for Review Comments email sent for Project Sundance West Final Plat for review by on behalf of Pikes Peak Regional Building Department
- Oct 14, 2026Request for Review Comments email sent for Project Sundance West Final Plat for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
- Oct 14, 2026Request for Review Comments email sent for Project Sundance West Final Plat for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
- Oct 14, 2026Request for Review Comments email sent for Project Sundance West Final Plat for review by Colorado Geological Survey on behalf of Colorado Geological Survey
- Oct 14, 2026Request for Review Comments email sent for Project Sundance West Final Plat for review by Mike Matz on behalf of Colorado Division of Water Resources
- Oct 14, 2026Request for Review Comments email sent for Project Sundance West Final Plat for review by Ailis Thyne on behalf of Colorado Division of Water Resources
- Oct 14, 2026Request for Review Comments email sent for Project Sundance West Final Plat for review by General Email on behalf of Mountain View Electric Association, Inc.
- Oct 14, 2026Request for Review Comments email sent for Project Sundance West Final Plat for review by Mikayla Hartford on behalf of EPC Stormwater Review
- Oct 14, 2026Request for Review Comments email sent for Project Sundance West Final Plat for review by Zachary Jannusch on behalf of EPC Stormwater Review
- Oct 14, 2026Request for Review Comments email sent for Project Sundance West Final Plat for review by Glenn Reese on behalf of EPC Stormwater Review
- Oct 14, 2026Request for Review Comments email sent for Project Sundance West Final Plat for review by Erica Rylander on behalf of EPC Stormwater Review
- Oct 14, 2026Request for Review Comments email sent for Project Sundance West Final Plat for review by Christina Prete on behalf of EPC Stormwater Review
- Oct 14, 2026Request for Review Comments email sent for Project Sundance West Final Plat for review by Jeff Kramer on behalf of EPC Sheriff's Department
- Oct 14, 2026Request for Review Comments email sent for Project Sundance West Final Plat for review by Heidi Williams on behalf of EPC Sheriff's Department
- Oct 14, 2026Request for Review Comments email sent for Project Sundance West Final Plat for review by Lizz Floro on behalf of EPC Sheriff's Department
- Oct 14, 2026Request for Review Comments email sent for Project Sundance West Final Plat for review by on behalf of EPC Public Works, County Engineer
- Oct 14, 2026Request for Review Comments email sent for Project Sundance West Final Plat for review by on behalf of EPC Public Works, County Engineer
- Oct 14, 2026Request for Review Comments email sent for Project Sundance West Final Plat for review by on behalf of EPC Parks Department
- Oct 14, 2026Request for Review Comments email sent for Project Sundance West Final Plat for review by Catherine McGarvy on behalf of EPC Health Department
- Oct 14, 2026Request for Review Comments email sent for Project Sundance West Final Plat for review by HEAEH LandUse on behalf of EPC Health Department
- Oct 14, 2026Request for Review Comments email sent for Project Sundance West Final Plat for review by Kathy Andrew on behalf of EPC Environmental Services
- Oct 14, 2026Request for Review Comments email sent for Project Sundance West Final Plat for review by Erika Keech on behalf of County Attorney - Water
- Oct 14, 2026Request for Review Comments email sent for Project Sundance West Final Plat for review by Lori Seago on behalf of County Attorney - Water
- Oct 14, 2026Request for Review Comments email sent for Project Sundance West Final Plat for review by April Willie on behalf of County Attorney - Water
- Oct 14, 2026Request for Review Comments email sent for Project Sundance West Final Plat for review by Gilbert LaForce on behalf of PCD Engineering Division
- Oct 14, 2026Request for Review Comments email sent for Project Sundance West Final Plat for review by Engineering Manager on behalf of PCD Engineering Division
- Oct 14, 2026Submission Triaged
- Oct 14, 2026Submission received from Applicant
- May 4, 2026Project Manager Assigned: Ryan Howser
- Nov 4, 2025Submission request sent to Applicant
- Nov 4, 2025Request for Review Comments returned by PCD Project Manager
- Nov 4, 2025Request for Review Comments email resent for Project Sundance West Final Plat for review by Justin Kilgore on behalf of PCD Project Manager
- Oct 30, 2025Request for Review Comments returned by El Paso County Conservation Dist
- Oct 27, 2025Request for Review Comments returned by EPC Health Department
- Oct 23, 2025Submission request sent to Applicant
- Oct 23, 2025Request for Review Comments returned by PCD Project Manager
- Oct 20, 2025Request for Review Comments returned by Black Forest Land Use Committee
- Oct 15, 2025Request for Review Comments returned by Colorado Geological Survey
- Oct 13, 2025Request for Review Comments returned by EPC Fire and Wildfire Program Manager
- Oct 13, 2025Request for Review Comments returned by PCD Engineering Division
- Oct 13, 2025Request for Review Comments email resent for Project Sundance West Final Plat for review by Roland Peterson on behalf of EPC Fire and Wildfire Program Manager
- Oct 13, 2025Request for Review Comments email resent for Project Sundance West Final Plat for review by Engineering Manager on behalf of PCD Engineering Division
- Oct 10, 2025Request for Review Comments returned by Colorado Division of Water Resources
- Oct 10, 2025Request for Review Comments returned by Pikes Peak Regional Building Department
- Oct 9, 2025Request for Review Comments returned by PCD Engineering Division
- Oct 9, 2025Request for Review Comments returned by EPC Stormwater Review
- Oct 9, 2025Request for Review Comments returned by EPC Fire and Wildfire Program Manager
- Oct 7, 2025Request for Review Comments returned by Black Forest Fire Protection District
- Oct 7, 2025Request for Review Comments returned by Mountain View Electric Association, Inc.
- Sep 30, 2025Request for Review Comments returned by EPC Environmental Services
- Sep 26, 2025Request for Review Comments returned by 911 Authority - El Paso/Teller County
- Sep 23, 2025Request for Review Comments returned by EPC Parks Department
- Sep 19, 2025Request for Review Comments email sent for Project Sundance West Final Plat for review by Vicki Wood on behalf of Lewis Palmer 38
- Sep 19, 2025Request for Review Comments email sent for Project Sundance West Final Plat for review by Melissa Andrews on behalf of Lewis Palmer 38
- Sep 19, 2025Request for Review Comments email sent for Project Sundance West Final Plat for review by Brett Ridgway on behalf of Lewis Palmer 38
- Sep 19, 2025Request for Review Comments email sent for Project Sundance West Final Plat for review by Harry Thomas on behalf of El Paso County Conservation Dist
- Sep 19, 2025Request for Review Comments email sent for Project Sundance West Final Plat for review by Oliver Watkins on behalf of El Paso County Conservation Dist
- Sep 19, 2025Request for Review Comments email sent for Project Sundance West Final Plat for review by Katie Miller on behalf of El Paso County Conservation Dist
- Sep 19, 2025Request for Review Comments email sent for Project Sundance West Final Plat for review by on behalf of El Paso County Conservation Dist
- Sep 19, 2025Request for Review Comments email sent for Project Sundance West Final Plat for review by Erica Carter on behalf of El Paso County Conservation Dist
- Sep 19, 2025Request for Review Comments email sent for Project Sundance West Final Plat for review by Mariah Hudson on behalf of El Paso County Conservation Dist
- Sep 19, 2025Request for Review Comments email sent for Project Sundance West Final Plat for review by Cassie Olgren on behalf of El Paso County Conservation Dist
- Sep 19, 2025Request for Review Comments email sent for Project Sundance West Final Plat for review by Billy Richard on behalf of El Paso County Conservation Dist
- Sep 19, 2025Request for Review Comments email sent for Project Sundance West Final Plat for review by Santiago Tijerina on behalf of Black Hills Energy-Aquila
- Sep 19, 2025Request for Review Comments email sent for Project Sundance West Final Plat for review by Marcus Henderson on behalf of Black Hills Energy-Aquila
- Sep 19, 2025Request for Review Comments email sent for Project Sundance West Final Plat for review by Bob Swatek on behalf of Black Hills Energy-Aquila
- Sep 19, 2025Request for Review Comments email sent for Project Sundance West Final Plat for review by Adam Magoon on behalf of Black Hills Energy-Aquila
- Sep 19, 2025Request for Review Comments email sent for Project Sundance West Final Plat for review by Terry Stokka on behalf of Black Forest Land Use Committee
- Sep 19, 2025Request for Review Comments email sent for Project Sundance West Final Plat for review by Terry Stokka on behalf of Black Forest Land Use Committee
- Sep 19, 2025Request for Review Comments email sent for Project Sundance West Final Plat for review by Rachel Dunn on behalf of Black Forest Fire Protection District
- Sep 19, 2025Request for Review Comments email sent for Project Sundance West Final Plat for review by Michael Alvarado on behalf of Black Forest Fire Protection District
- Sep 19, 2025Request for Review Comments email sent for Project Sundance West Final Plat for review by on behalf of Black Forest Fire Protection District
- Sep 19, 2025Request for Review Comments email sent for Project Sundance West Final Plat for review by Fielding Lucas on behalf of Black Forest Fire Protection District
- Sep 19, 2025Request for Review Comments email sent for Project Sundance West Final Plat for review by Chad Herdt on behalf of Black Forest Fire Protection District
- Sep 19, 2025Request for Review Comments email sent for Project Sundance West Final Plat for review by on behalf of Pikes Peak Regional Building Department
- Sep 19, 2025Request for Review Comments email sent for Project Sundance West Final Plat for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
- Sep 19, 2025Request for Review Comments email sent for Project Sundance West Final Plat for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
- Sep 19, 2025Request for Review Comments email sent for Project Sundance West Final Plat for review by Colorado Geological Survey on behalf of Colorado Geological Survey
- Sep 19, 2025Request for Review Comments email sent for Project Sundance West Final Plat for review by Javier Vargas-Johnson on behalf of Colorado Division of Water Resources
- Sep 19, 2025Request for Review Comments email sent for Project Sundance West Final Plat for review by Ailis Thyne on behalf of Colorado Division of Water Resources
- Sep 19, 2025Request for Review Comments email sent for Project Sundance West Final Plat for review by General Email on behalf of Mountain View Electric Association, Inc.
- Sep 19, 2025Request for Review Comments email sent for Project Sundance West Final Plat for review by Zachary Jannusch on behalf of EPC Stormwater Review
- Sep 19, 2025Request for Review Comments email sent for Project Sundance West Final Plat for review by Mikayla Hartford on behalf of EPC Stormwater Review
- Sep 19, 2025Request for Review Comments email sent for Project Sundance West Final Plat for review by Glenn Reese on behalf of EPC Stormwater Review
- Sep 19, 2025Request for Review Comments email sent for Project Sundance West Final Plat for review by Christina Prete on behalf of EPC Stormwater Review
- Sep 19, 2025Request for Review Comments email sent for Project Sundance West Final Plat for review by Jeff Kramer on behalf of EPC Sheriff's Department
- Sep 19, 2025Request for Review Comments email sent for Project Sundance West Final Plat for review by Christopher Gonzalez on behalf of EPC Sheriff's Department
- Sep 19, 2025Request for Review Comments email sent for Project Sundance West Final Plat for review by Andrew Prehm on behalf of EPC Sheriff's Department
- Sep 19, 2025Request for Review Comments email sent for Project Sundance West Final Plat for review by on behalf of EPC Public Works, County Engineer
- Sep 19, 2025Request for Review Comments email sent for Project Sundance West Final Plat for review by on behalf of EPC Public Works, County Engineer
- Sep 19, 2025Request for Review Comments email sent for Project Sundance West Final Plat for review by on behalf of EPC Parks Department
- Sep 19, 2025Request for Review Comments email sent for Project Sundance West Final Plat for review by Mike McCarthy on behalf of EPC Health Department
- Sep 19, 2025Request for Review Comments email sent for Project Sundance West Final Plat for review by Catherine McGarvy on behalf of EPC Health Department
- Sep 19, 2025Request for Review Comments email sent for Project Sundance West Final Plat for review by HEAEH LandUse on behalf of EPC Health Department
- Sep 19, 2025Request for Review Comments email sent for Project Sundance West Final Plat for review by Kathy Andrew on behalf of EPC Environmental Services
- Sep 19, 2025Request for Review Comments email sent for Project Sundance West Final Plat for review by Justin Kilgore on behalf of PCD Project Manager
- Sep 19, 2025Request for Review Comments email sent for Project Sundance West Final Plat for review by Gilbert LaForce on behalf of PCD Engineering Division
- Sep 19, 2025Request for Review Comments email sent for Project Sundance West Final Plat for review by Engineering Manager on behalf of PCD Engineering Division
- Sep 19, 2025Request for Review Comments email sent for Project Sundance West Final Plat for review by Roland Peterson on behalf of EPC Fire and Wildfire Program Manager
- Sep 19, 2025Fees paid: 9/19/2025 (Receipt: 1011085)
- Sep 17, 2025File # Assigned: SF2527
- Sep 17, 2025Payment Request sent: 9/17/2025
- Sep 17, 2025Submission Triaged
- Sep 16, 2025Submission received from Applicant
- Sep 16, 2025Submission request sent to Applicant
- Jan 23, 2025Submission request sent to Applicant
- Jan 22, 2025Project Created
- Jan 22, 2025EA Assigned: EA24141
- Jan 22, 2025Project Manager Assigned: Lisa Elgin