Sundance West Final Plat

Final plat SF2527 Active

Creating 7 lots from Lot 1 of Thal Subdivision.

Location
5525 HODGEN RD, 80908
Jurisdiction
El Paso County
Applicant
Vertex Consulting Services Nina Ruiz
Land owner (assessor)
DUNSTON MATTHEW W & DUNSTON GENE W JR
County project manager
Lacey Dean
Filed
Jan 22, 2025
Parcel
6125001003
Map
Parcel boundaries: Colorado public parcel data · Basemap © OpenStreetMap contributors
Area map
See all Tri-Lakes projects on the map
Source record
El Paso County EDARP file

Documents (55)

Wastewater Treatment ReportreviewOct 14, 2026
Water Resources ReportreviewOct 14, 2026
Traffic MemoreviewOct 14, 2026
Soils & Geology ReportreviewOct 14, 2026
Drainage Report - FinalreviewOct 13, 2026
Final Plat DrawingsreviewSep 28, 2026
Closures Sheet (Survey)reviewSep 28, 2026
PBMP Applicability FormreviewSep 28, 2026
Financial Assurance FormsreviewSep 28, 2026
Fire Protection ReportreviewJun 12, 2026
Letter of IntentreviewNov 13, 2025
Natural Features ReportreviewNov 13, 2025
Application/Petition FormreviewNov 13, 2025
Fire Protection ReportreviewSep 16, 2025
Natural Features ReportreviewSep 16, 2025
Water Resources ReportreviewSep 16, 2025
PBMP Applicability FormreviewAug 11, 2025
Drainage Report - FinalreviewJul 21, 2025
Traffic MemoreviewJun 17, 2025
Final Plat DrawingsreviewJun 17, 2025
Closures Sheet (Survey)reviewJun 17, 2025
Letter of IntentreviewJun 17, 2025
Financial Assurance FormsreviewJun 17, 2025
Wastewater Treatment ReportreviewJun 17, 2025
Soils & Geology ReportreviewJun 17, 2025
Application/Petition FormreviewJun 17, 2025
Natural GasreviewJun 17, 2025
Fire CommitmentreviewMar 25, 2025
DWR Engineer Opinion LetteradditionalOct 13, 2025

Agency review comments (92)

Comments returned by referral agencies during review, from the county's public EDARP file. Some agencies attach a letter instead of (or alongside) written comments.

Black Forest Fire Protection Districtreview 2Nov 10, 2026
The following items remain to be resolved before final fire approval: 1. Substantiate the proposed alternative water supply — IFC Section 507 The Fire Protection Plan identifies off-site Cherokee/Sundance hydrants and proposes tender-shuttle operations in place of a subdivision cistern. BFFR acknowledges the source information provided. However, as stated in BFFR’s September 28, 2026 review of the concurrent rezone, this alternative has not been approved. Provide current water-provider confirmation of authorized use, hydrant flow-test information including residual pressure, available storage and supply duration, year-round reliability, and apparatus access to the proposed fill locations. Supplement the plan with an analysis demonstrating that the proposed arrangement can sustain the required firefighting water delivery for this development. Show actual apparatus travel routes and distances, anticipated building envelopes and apparatus operating locations, and applicable hose routes. Distances to the subdivision boundary alone do not establish service to each lot. If the proposed alternative cannot be demonstrated and approved, provide a compliant subdivision water-supply design. Any proposed cistern shall meet BFFR’s minimum 30,000-gallon usable capacity requirement, or a greater volume where required by the applicable calculation. Address the prior request for qualified Colorado-licensed fire protection engineering review of the water-supply design. 2. Complete the fire apparatus access design — IFC Section 503 Sheet TY1 provides a 20-foot private-driveway typical section; this information need not be resubmitted as a new concept. Complete the supporting design and reconcile the gravel driveway shown on C1.1 with TY1’s pavement terminology and deferred geotechnical design. Provide construction drawings for the required Farrar Road improvements and coordinated private access. The current Construction Drawings upload duplicates the grading and erosion-control set. Coordinate with County Engineering’s November 9 comments. Document all-weather apparatus loading, culvert crossing capacity, longitudinal grades, vertical clearance, turning geometry, and apparatus operating areas. Provide dimensioned turnarounds for dead-end fire apparatus access exceeding 150 feet in accordance with IFC 503.2.5, with the necessary easements. Coordinate the County-required Farrar Road termination/turnaround with the private-access layout. 3. Reconcile lot access, easements, and maintenance Resolve the conflicting Lot 5 access descriptions. Plat note 13 and the traffic memo close the existing Hodgen Road access, while the Letter of Intent and drainage report retain it. Show the permanent replacement route serving the existing residence and coordinate addressing with PPRBD. Reconcile the 24-foot access easements shown on the plat with the 30-foot easement described in the Letter of Intent and applicable County requirements. Clearly identify the lots served by each route, including Lot 6’s connection. Provide recorded access and maintenance agreements, or proposed instruments for review, consistent with the plat. Include responsibility for the shared driving surface, culverts, snow removal, vegetation clearance, and turnarounds. Show the approved name “Sundance Ridge View” consistently. 4. Carry forward CWRC requirements Add an explicit plat note addressing the applicable Colorado Wildfire Resiliency Code requirements. Carry forward the Moderate Fire Intensity/Class 2 requirements identified in BFFR’s concurrent rezone review, subject to any approved classification determination. Future applicable construction shall comply with CWRC Chapter 4 structure-hardening and Chapter 5 site and defensible-space requirements. Individual homes require the applicable BFFR documentation, review, and initial planning and final inspections. Detailed building-material approvals will occur through the individual permit process. 5. Correct the reviewing fire district Revise civil sheet C1.0 to identify Black Forest Fire Rescue Protection District instead of Monument Fire District. Provide a coordinated response referencing the revised document pages and drawing sheets. Final plat review does not constitute approval of the proposed off-site water alternative or any access exception.
PCD Engineering Divisionreview 2Nov 9, 2026
Review 2. Engineering and Stormwater comments on the following documents (to be uploaded by Project Manager): - Drainage Report - Closure Sheets - Final Plat - Letter of Intent - Construction Drawings - FAE - GEC Plan - Soils and Geology Report Additional required documents: - Proof of submittal of a non-jurisdictional impoundment form - DMA - O&M Agreement - SDI worksheet Reviewed by: Charlene Durham, PE, Principal Engineer charlenedurham@elpasoco.com (719) 520-7951 Joe Sandstrom, EI, Associate Engineer josephsandstrom@elpasoco.com (719) 520-6314
PCD Engineering Divisionreview 2Nov 9, 2026
GEC Plan comments
View attached comment letter
PCD Engineering Divisionreview 2Nov 9, 2026
Construction Drawings comments
View attached comment letter
PCD Engineering Divisionreview 2Nov 9, 2026
Traffic Memo comments
View attached comment letter
PCD Engineering Divisionreview 2Nov 9, 2026
Soils and Geology Report comments
View attached comment letter
PCD Engineering Divisionreview 2Nov 9, 2026
Letter of Intent comments
View attached comment letter
PCD Engineering Divisionreview 2Nov 9, 2026
Final Plat Drawing comments
View attached comment letter
PCD Engineering Divisionreview 2Nov 9, 2026
Drainage Report comments
View attached comment letter
PCD Engineering Divisionreview 2Nov 9, 2026
Closure sheet comments
View attached comment letter
PCD Engineering Divisionreview 2Nov 9, 2026
FAE comments
View attached comment letter
EPC Stormwater Reviewreview 2Nov 9, 2026
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - Drainage Report......................(to be uploaded by Development Services) - ESQCP - FAE.........................................(to be uploaded by Development Services) - Final Plat.................................(to be uploaded by Development Services) - GEC Plan...............................(to be uploaded by Development Services) - GEC Checklist - PCM Applicability Form - SWMP - SWMP Checklist Reviewed by: Mikayla Hartford, P.E. Engineer - Stormwater 719.339.5053 MikaylaHartford@elpasoco.com
EPC Stormwater Reviewreview 2Nov 9, 2026
SWMP Checklist
View attached comment letter
EPC Stormwater Reviewreview 2Nov 9, 2026
SWMP Comments
View attached comment letter
EPC Stormwater Reviewreview 2Nov 9, 2026
PCM Applicability Form Comments
View attached comment letter
EPC Stormwater Reviewreview 2Nov 9, 2026
GEC Checklist
View attached comment letter
EPC Stormwater Reviewreview 2Nov 9, 2026
ESQCP Comments
View attached comment letter
PCD Project Managerreview 2Nov 5, 2026
V2_Water Resources Report_comments
View attached comment letter
PCD Project Managerreview 2Nov 5, 2026
V2_Water Supply Information Summary_comments
View attached comment letter
PCD Project Managerreview 2Nov 5, 2026
V2_Wastewater Treatment Report_INFORMATIONAL comments
View attached comment letter
PCD Project Managerreview 2Nov 5, 2026
V2_Natural Features Report_comments
View attached comment letter
PCD Project Managerreview 2Nov 5, 2026
V2_Mineral Rights Certification_comments
View attached comment letter
PCD Project Managerreview 2Nov 5, 2026
V2_Fire Protection Report_INFORMATIONAL comments
View attached comment letter
PCD Project Managerreview 2Nov 5, 2026
Review 2: EPC Planning Division has comments in green text boxes on the following documents. - Letter of Intent (to be uploaded by Engineering staff) - Final Plat Drawings (to be uploaded by Engineering staff) - Soils and Geology (to be uploaded by Engineering staff) - Water Resources Report - Water Supply Information Summary - Natural Features Report - Mineral Rights Certification - Fire Protection Report (INFORMATION comments only) - Wastewater Treatment Report (INFORMATIONAL comments only) Reviewed by: Lacey Dean, Planner laceydean2@elpasoco.com
County Attorney - Waterreview 2Nov 5, 2026
-Pursuant to the El Paso County Land Development Code (LDC) 8.4.7(B)(3)(d), please include water quality information in the Water Resources Report (WRR). -Please also double-check your estimated demand for irrigation in the Water Supply Information Summary (WSIS). 7 acres is 304,920 square feet. At 0.0566 acre-foot/1,000 square feet, which is the presumptive use value in the LDC, 17.26 annual acre-feet would be required to meet this demand. -Please reconcile the stock watering demand between the WSIS and the WRR. -Please complete section 10 of the WSIS to add the water court case number.
Black Hills Energy-Aquilareview 2Nov 4, 2026
BHE will serve. BHE has facilities in area. Please call in locates before excavating.
Colorado Geological Surveyreview 2Nov 3, 2026
View attached comment letter
Colorado Geological Surveyreview 2Nov 3, 2026
View attached comment letter
Colorado Geological Surveyreview 2Nov 3, 2026
View attached comment letter
Pikes Peak Regional Building Departmentreview 2Nov 3, 2026
Enumerations has the following comments: 1. On the letter of intent, replat criteria #5 says that lot 5 will have access to Hodgen via existing access easement, but, plat note 13 states that there will be no access to Hodgen and that the current access will be closed. Which is correct? If the existing address to Hodgen on what will be Lot 5 is to be closed, how will that lot be accessed? If the access to lot 5 will change from what is currently is, than an address change for the existing home will need to be done. 2. Per comments from the 911 authority regarding an existing street name for the access of lots 4, 6 & 7 of Sundance Ridge View , this street name needs to be shown on the plat. Further, Enumerations would want Lot 3 to also be accessed and addressed from this street. 3. Enumerations comments regarding mylar review prior to plat approval still apply. Brent Johnson Enumerations Plans Examiner Pikes Peak Regional Building Department O: 719-327-2888 E: brent@pprbd.org W: pprbd.org
Black Forest Land Use Committeereview 2Nov 2, 2026
The main comment from the Black Forest Land Use Committee is the issue of re-platting parcels that have already been platted. When a person buys a parcel that has been platted, there is normally the assumption that the lots will stay the same as originally platted. Is the owner of Sundance East OK with this further subdivision? I believe that a developer should be required to stick with the density of a lot when they purchase it. This is a protection for other owners of adjoining lots. This issue is becoming more significant in Black Forest where owners of 5-acre lots are looking to subdivide into 2.5-acre lots. Again this is not fair to the adjoining residents who bought into the development with the understand that the lots would be 5 acres, thus providing lower density and more privacy.
EPC Sheriff's Departmentreview 2Oct 30, 2026
As the agency having jurisdiction is Black Forest Fire Rescue Protection District, EPSO defers all fire comments to BFFR
EPC Parks Departmentreview 2Oct 21, 2026
El Paso County Parks staff have reviewed the second submittal of this final plat and have attached comments and recommendations. Thank you. Ashlyn Mathy Parks Planner Park Planning Division El Paso County Parks Department Office 719.520.6978
View attached comment letter
Mountain View Electric Association, Inc.review 2Oct 15, 2026
See comment letter dated 10/7/25
EPC Environmental Servicesreview 2Oct 15, 2026
View attached comment letter
EPC Environmental Servicesreview 2Oct 15, 2026
View attached comment letter
EPC Environmental Servicesreview 2Oct 15, 2026
View attached comment letter
EPC Environmental Servicesreview 2Oct 15, 2026
View attached comment letter
EPC Environmental Servicesreview 2Oct 15, 2026
View attached comment letter
EPC Environmental Servicesreview 2Oct 15, 2026
View attached comment letter
911 Authority - El Paso/Teller Countyreview 2Oct 15, 2026
Comments for E911 as follows: The access easement leading to lots 6 and 7 has a previously approved streetname “Sundance Ridge View”. This name needs to be depicted on the plan drawings. Thank you. Justin
PCD Project Managerreview 1Nov 4, 2025
See comments on Fire Protection Report.
View attached comment letter
El Paso County Conservation Distreview 1Oct 30, 2025
No comments at this time.
EPC Health Departmentreview 1Oct 27, 2025
View attached comment letter
EPC Health Departmentreview 1Oct 27, 2025
View attached comment letter
EPC Health Departmentreview 1Oct 27, 2025
View attached comment letter
EPC Health Departmentreview 1Oct 27, 2025
View attached comment letter
EPC Health Departmentreview 1Oct 27, 2025
View attached comment letter
EPC Health Departmentreview 1Oct 27, 2025
View attached comment letter
EPC Health Departmentreview 1Oct 27, 2025
View attached comment letter
PCD Project Managerreview 1Oct 23, 2025
See Water Resources Report.
View attached comment letter
PCD Project Managerreview 1Oct 23, 2025
See Traffic Memo.
View attached comment letter
PCD Project Managerreview 1Oct 23, 2025
See Soils and Geology Report.
View attached comment letter
PCD Project Managerreview 1Oct 23, 2025
See Natural Features Report.
View attached comment letter
PCD Project Managerreview 1Oct 23, 2025
See comments on Mineral Rights Certificate.
View attached comment letter
PCD Project Managerreview 1Oct 23, 2025
See comments on Letter of Intent.
View attached comment letter
PCD Project Managerreview 1Oct 23, 2025
See comments on the Final Plat Drawings.
View attached comment letter
PCD Project Managerreview 1Oct 23, 2025
Please see comments on the Application.
View attached comment letter
PCD Project Managerreview 1Oct 23, 2025
The Waste Water Treatment Report submitted was a protected document. Please submit V2 unprotected so comments can be made.
Black Forest Land Use Committeereview 1Oct 20, 2025
The Black Forest Land Use Committee has no comments on this proposal.
PCD Engineering Divisionreview 1Oct 13, 2025
Drainage Report comments
View attached comment letter
Colorado Division of Water Resourcesreview 1Oct 10, 2025
View attached comment letter
Colorado Division of Water Resourcesreview 1Oct 10, 2025
View attached comment letter
Colorado Division of Water Resourcesreview 1Oct 10, 2025
View attached comment letter
Colorado Division of Water Resourcesreview 1Oct 10, 2025
View attached comment letter
Colorado Division of Water Resourcesreview 1Oct 10, 2025
View attached comment letter
Colorado Division of Water Resourcesreview 1Oct 10, 2025
View attached comment letter
Colorado Division of Water Resourcesreview 1Oct 10, 2025
View attached comment letter
Colorado Geological Surveyreview 1Oct 10, 2025
View attached comment letter
Colorado Geological Surveyreview 1Oct 10, 2025
View attached comment letter
Colorado Geological Surveyreview 1Oct 10, 2025
View attached comment letter
Colorado Geological Surveyreview 1Oct 10, 2025
View attached comment letter
Colorado Geological Surveyreview 1Oct 10, 2025
View attached comment letter
Colorado Geological Surveyreview 1Oct 10, 2025
View attached comment letter
Colorado Geological Surveyreview 1Oct 10, 2025
View attached comment letter
Pikes Peak Regional Building Departmentreview 1Oct 10, 2025
Enumerations has the following comments: 1. Note 3 shows the FIRM panel as 08041C035G. It should be 08041C305G. 2. The existing residence will retain the existing address for Lot 5. 3. The access easement for lots 3,4, 6 and 7 should be a named private street. Submit a list of proposed street names to Justin Annan (jannan@eptc911.org) and Glenn West (gwest@eptc911.org) for approval. Once a street name is approved, it needs to be added to this plat. 4. Once the private street name is approved, the applicant should submit a copy of this plat to Enumerations for address assignment. Once addressing is returned, the addresses need to be added to this plat. 5. Enumerations will review the mylar prior to recording for addressing, title block and street names. An Enumerations fee of $10 will be due for each lot to which a new address is assigned. Brent Johnson Enumerations Plans Examiner Pikes Peak Regional Building Department O: 719-327-2888 E: brent@pprbd.org W: pprbd.org
PCD Engineering Divisionreview 1Oct 9, 2025
Review 1. Engineering and Stormwater comments on the following documents uploaded today: - Drainage Report - Closure Sheets Engineering comments on the following documents (to be uploaded by the project manager on a later date): - Final Plat - Letter of Intent - Soils and Geology Report - Traffic Memo Additional documents required with the next submittal: - Construction Drawings - FAE Note to Project Manager: Please provide full review period for the next submittal due to the nature and volume of comments on this submittal and the engineering documents that were omitted from the first submittal. Reviewed by: Charlene Durham, PE, Principal Engineer charlenedurham@elpasoco.com (719) 520-7951 Joe Sandstrom, EI, Associate Engineer josephsandstrom@elpasoco.com (719) 520-6314
PCD Engineering Divisionreview 1Oct 9, 2025
Closure Sheet comments
View attached comment letter
EPC Stormwater Reviewreview 1Oct 9, 2025
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - Drainage Report......................(to be uploaded with Development Services comments) - Final Plat.................................(to be uploaded by the Project Manager) - PCM Applicability Form This project site has over an acre of existing disturbance. Please provide the following documents upon resubmittal: - ESQCP - FAE - GEC Plan - GEC Checklist - SWMP - SWMP Checklist Reviewed by: Mikayla Hartford, P.E. Engineer - Stormwater 719.339.5053 MikaylaHartford@elpasoco.com
EPC Stormwater Reviewreview 1Oct 9, 2025
PCM Applicability Form
View attached comment letter
EPC Fire and Wildfire Program Managerreview 1Oct 9, 2025
Fire Safety and Wildfire Mitigation Program comments added to the following documents: - Fire Protection report - Fina Plat Drawings Roland Peterson Fire Safety and Wildfire Mitigation Program Manager Planning & Community Development 719.520.6075 rolandpeterson@elpasoco.com
Black Forest Fire Protection Districtreview 1Oct 7, 2025
BFFRPD (Black Forest Fire Rescue Protection District) has reviewed the proposed project. Of concerns for BFFRPD operations are the fire department access and fire protection water supplies. El Paso County is the Authority Having Jurisdiction (AHJ) that will determine the requirements for cistern and specifications for access/egress. Per BFFRPD, Fire Protection Cisterns or natural water supplies shall be provided in: subdivisions of 5 or more lots and commercial/industrial developments where there is insufficient public and/or private water supply to meet minimum fire flows required by NFPA 1141, 1142 and reference standards of those publications. The applicant states that there are multiple "hydrants" available, which is not true. The "hydrant" labeled on Haes Haven is a fire cistern and was constructed for the Providence Point Estates subdivision, while the second hydrant is in a field with no access to serve the proposed lots. The Fire Protection report states that specific hydrant is 1,900 feet away which is not the distance by roadway (driving). The hydrant is in a field which is inaccessible by fire apparatus. If the applicant would like to communicate with that responsible water district (Cherokee Metropolitan District) to inquire about serving the proposed subdivision, BFFRPD would like be a part of that planning. Having the water district serve the proposed lots by a municipal water system would be beneficial for both the applicant and the future citizens that would occupy those lots. Additionally, all structures and street signs need to comply with PPRBD, EL Paso County standards, IBC 2021 and IFC 2021 standards. Our recommendation is the applicant demonstrate full compliance and conformance with El Paso County’s adopted Land Development Code (LDC), Engineering Criteria Manual (ECM), adopted International Fire Code (IFC), and all other adopted codes, provisions, or statutes that impact fire safety to include access/egress, water supply, hardening of structures, addressing, fire protection systems, etc. It is recommended that the applicant submit a comprehensive fire protection report from a qualified fire protection engineer that is licensed as a Professional Engineer (PE) by the Colorado State Board of Registration for Professional Engineers to demonstrate conformance to all requirements. The current Fire Protection report is not completed by a PE-licensed individual. Furthermore, the District does not support any waivers or variances that negatively impact any fire safety provisions including access/egress, water supply, hardening of structures, addressing, fire protections systems, etc.
Mountain View Electric Association, Inc.review 1Oct 7, 2025
See attached comment letter
View attached comment letter
EPC Environmental Servicesreview 1Sep 30, 2025
View attached comment letter
EPC Environmental Servicesreview 1Sep 30, 2025
View attached comment letter
EPC Environmental Servicesreview 1Sep 30, 2025
View attached comment letter
EPC Environmental Servicesreview 1Sep 30, 2025
View attached comment letter
EPC Environmental Servicesreview 1Sep 30, 2025
View attached comment letter
EPC Environmental Servicesreview 1Sep 30, 2025
View attached comment letter
EPC Environmental Servicesreview 1Sep 30, 2025
View attached comment letter
911 Authority - El Paso/Teller Countyreview 1Sep 26, 2025
No action for E911 on this submittal. Thank you. Justin
EPC Parks Departmentreview 1Sep 23, 2025
El Paso County Parks Staff Preliminary Comments: Please See Attached Documentation. This project will be presented before the Parks Advisory Board on October 8, 2025. Thank you! Ashlyn Mathy Parks Planner Park Planning Division El Paso County Parks Department ashlynmathy@elpasoco.com
View attached comment letter

Timeline