TriLakes Growth

Tracking development, land use, and new business across the Tri-Lakes region

A Monument Independent publication
All areasEl Paso CountyTown of MonumentTown of Palmer Lake

All tracked projects — Town of Monument (28)

Sorted by most recent activity. Include closed files

Native Sun

Town of Monument Under construction Under construction · Last activity Nov 5, 2026

Seven Brew Coffee

Town of Monument Under construction Under construction · Last activity Nov 5, 2026

Conexus Lot 1

Town of Monument Under construction Under construction · Last activity Nov 5, 2026

Ridge Commerce Park

Town of Monument Town of Monument case 2026-015-PUD Under Review 17101 OLD DENVER RD (80132) · Last activity Nov 5, 2026
The Ridge Commerce Park project proposes a Final PUD and Replat for a 16.82-acre light industrial/flex office development within Conexus Phases 2 & 3. The development includes two buildings totaling 227,716 square feet, along with 215 parking spaces, loading areas, landscaping, and two access points from the realigned Old Denver Road. The replat would divide the existing parcel into two lots of approximately 8.01 and 8.81 acres, while maintaining consistency with the previously approved Preliminary PUD and associated development standards. The project is designed to utilize existing master-planned infrastructure and drainage facilities while meeting applicable requirements for building design, landscaping, buffering, circulation, parking, and industrial uses.

Walmart PUD Minor Amendment

Town of Monument Town of Monument case 2026-014-PUDA Awaiting Applicant Resubmittal 16218 JACKSON CREEK PKWY (80132) · Last activity Nov 5, 2026
The project consists of minor site improvements within the existing developed area, with no building expansion, change in use, new public-street access, or expansion of the development footprint. Improvements include reconfiguring the pickup area to provide 25 designated spaces, minor parking and circulation modifications, updated pavement markings and signage, pedestrian safety enhancements, and limited maintenance such as seal coating and vegetation trimming. All other existing site improvements, including the building, utilities, drainage facilities, sidewalks, curbs, and accessible routes, will remain unchanged.

U.S. Taekwondo Center

Town of Monument Under construction Under construction · Last activity Aug 29, 2026

Karl Malone Powersports

Town of Monument Under construction Under construction · Last activity Aug 29, 2026

D38 Modular Building

Town of Monument Under construction Under construction · Last activity Aug 29, 2026

Cool Rides, 303 W Hwy 105

Town of Monument Town of Monument case 2026-010 Under Review 303 W HIGHWAY 105 (80132) · Last activity Aug 29, 2026
The project is to propose 20 formalized parking spaces, 8 within curb and gutter and the remainder behind wheel stops as requested by the town. One of the spaces will be designated ADA parking. Two existing vehicle storage stalls will remain on the north side of the building. Parking will be shared between the daytime use by the automotive sales facility and the evening use by the pub. A trash dumpster pad is proposed with the repaving with limited screening by reducing the view from the right of way via frontage landscaping. No change is proposed to the site lighting or overhead utility lines.

Chipotle, 540 W Hwy 105

Town of Monument Town of Monument case 2026-008 Under Review 540 W HIGHWAY 105 (80132) · Last activity Aug 29, 2026
The application for the site plan review includes work for a new Chipotle Mexican Grill conversion of the existing Arby's restaurant at 540 Hwy 105, Monument, CO 80132. The scope of work includes upgrades to the parking lot lighting, a mill & overlay of the existing parking lot, enlarging the existing trash enclosure, a new recessed patio within the existing building footprint, new site landscaping, & minor exterior adjustments, including, but not limited to: squaring off the existing entry/pickup tower elements, new Chipotle brand specific paint colors, new building canopies, & new building mounted lighting. The overall building footprint will not be modified from its original size.

Chick-Fil-A | Legacy at Jackson Landing

Town of Monument Town of Monument case 2026-012 Under Review STRUTHERS RD (80132) · Last activity Aug 29, 2026
This Development Plan Application proposes the construction of a new 4,728-square-foot Chick-fil-A restaurant with dual drive-thru lanes, two drive-thru canopies, and a detached trash enclosure on a 1.48-acre parcel. The restaurant will provide 88 indoor seats, 24 patio seats, 71 parking stalls (including 3 ADA-accessible spaces), and 2 bicycle racks.

Santa Fe Park Road Development

Town of Monument Under construction Under construction · Last activity Aug 11, 2026

Terrazzo Baja Road Development

Town of Monument Under construction Under construction · Last activity Aug 11, 2026

Woodmoor Placer Road Development

Town of Monument Under construction Under construction · Last activity Aug 11, 2026

1060 Synthes Ave - Addition

Town of Monument Under construction Under construction · Last activity Aug 11, 2026

Maverick at Monument

Town of Monument Under construction Under construction · Last activity Aug 11, 2026

Meritage Homes (Conexus Lot 2)

Town of Monument Under construction Under construction · Last activity Aug 11, 2026

Monument Fire Station #3

Town of Monument Under construction Under construction · Last activity Aug 11, 2026

Monument Fire Training Center

Town of Monument Under construction Under construction · Last activity Aug 11, 2026

Santa Fe Park Business Park

Town of Monument Under construction Under construction · Last activity Aug 11, 2026

Costco

Town of Monument Pre-application Pre-application (May 2026) · Last activity Aug 11, 2026
Pre-application conference held May 2026. No formal application has been submitted; pre-applications are advisory and may not proceed.

Alpine Buick Car Dealership

Town of Monument Under construction Under construction · Last activity Aug 11, 2026

Falcon Commerce Center Filing No. 4 - Industrial

Town of Monument Under construction Under construction · Last activity Aug 11, 2026

Legacy at Jackson Landing (Target)

Town of Monument Under construction Under construction · Last activity Aug 11, 2026

Lost Island ll

Town of Monument Under construction Under construction · Last activity Aug 11, 2026

Monument Ridge - 790 Sky Vista Point

Town of Monument Town of Monument case 2026-006-PUDA Under Review 790 SKY VISTA PT (80921) · Last activity Aug 11, 2026
Minor Planned Unit Development for the purpose of changing the permitted use of Building D. Building D was previously proposed as a Restaurant. The Minor Amendment will permit a Medical Service Center.

Willow Springs Ranch West

Town of Monument Town of Monument case 2025-027-AN Under Review 16215 RICKENBACKER AVE (80132) · Last activity Aug 11, 2026
Drexel, Barrell & CO have proposed an annexation plan and associated rezoning application for property located west of Willow Ranch Road and north of Forest Lakes Drive. The proposed development encompasses approximately 39.6 acres and is planned as a large-lot single-family residential development. A maximum of 38 lots, each 15,000 square feet (1/3 acre) or larger, are proposed.

Luxelocker

Town of Monument Town of Monument case 2025-028-FPUD Waiting for Applicant Resubmittal 15790 TERRAZZO DR · Last activity Aug 11, 2026
Luxelocker is a luxury condominium storage facility with private ownership with multiple buildings that are externally loaded within a private gated community. The development will consist of privately owned condominium storage units which are individually sold, plated units, governed by recorded CC&Rs, and professionally managed by a Commercial Owners' Association.